01-Irrigation Work Items



SCHEDULE OF RATES

BASIC DATA FOR IRRIGATION WORK ITEMS FOR THE YEAR 2020-21

STATEMENT OF RATES FOR MATERIALS

General Guide Lines for Revising Rates of Materials

1. Average of the prevailing market rates, ignoring freak rates, shall be the criteria for fixing market rates for materials.

2. The rates for materials is exclusive of seigniorage charges wherever applicable.

3. The rates for materials, except those for which lead charges are admissible as per the statement of lead charges, shall be for all leads.

4. The rates provided for useful rubble / stone chips from excavation shall be at dump yard

Sl.
No.
Description of material Unit Scheduled
Rates for the Year 2020-21
1 Acetylene gas cum 368.00
2 Asphalt 80/100 Grade Kg 45.00
3 Binding wire Kg 60.00
4 Burnt stone slab 10 cm thick sqm 270.00
5(a) Ordinary  Portland  Cement  (43/53  GRADE)  *(Note:  As  per
Monthly rate fixed by Sub Committee)
tonne 5500.00
5(b) Portland  Pozzolona  cement  *(Note  as  per  monthly  rate
fixed by committee)
tonne 5400.00
5(c) Portland Slag Cement *(Note as per monthly rate fixed by
sub-committee
tonne 5300.00
6 Chequered plate Kg 58.00
7 Coarse    aggregate    10-4.75    mm(excluding    Seigniorage
charges)
cum 760.00
8 Coarse aggregate 20-10 mm(excluding Seigniorage charges) cum 990.00
9 Coarse aggregate 40-20 mm(excluding Seigniorage charges) cum 890.00
10 Coarse aggregate 80-40 mm(excluding Seigniorage charges) cum 510.00
  The aggregate rates mentioned  above (from Sl.No.7 to Sl.No.10) are  exclusive of Seigniorage charges but including blasting charges of Rs.70/cum and 25% machine crushing charges. However, if the metal is obtained from hand broken, the blasting and crushing charges shall be deducted. The aggregate shall be HB Stone of Granite, Dolamite,  Dolerite and Trap.  (Quartzite  and  Basalt  with  aggregate impact  of less
than 20)
11 Coir brush Each 46.00
12 Copper sheet 16 SWG kg 625.00
13 Coursed   rubble   stone
Seigniorage charges)
Each 25.00
14 Coursed   rubble   stone
Seigniorage charges)
Each 30.00
15 Curing Compound Ltr 125.00
       
16 D – cord Rm 9.00
17 Delay - noiseless trunk Each 18.00
18 Detonating fuse coil Rm 7.00
19 Detonating shock tube / Cord relays Rm 32.00
20 Detonator delay type Each 16.00
21 Detonator electric Each 10.00
22 Detonator ordinary Each 9.00
23 Empty cement bag Each 6.00
24 Explosive ANFO kg 61.00
25 Explosive ANFO high strength booster kg 74.00
26 Explosive small dia ( Kelvex-220 or equivalent) kg 81.00
27 (a) Fine   aggregate/   sand(un-screened)   for   Concrete      &
Filtering items) (excluding Seigniorage charges)
cum 570.00
27 (b) Fine  aggregate/Sand(unscreened)for  filling  and  blind  age
(excluding Seigniorage charges)
cum 570.00
28 Fine  aggregate  /Sand  (Screened)  for  Mortar  ,Plastering
items   and   Sand   blasting   items(excluding   Seigniorage charges)
cum 760.00
29 Geo-textile ( filter fabric ) 160 gsm sqm 39.00
30 Geo-textile ( filter fabric ) 200 gsm sqm 48.00
31 Geo-textile ( filter fabric ) 250 gsm sqm 54.00
32 G I Pipe 100 mm dia B Class Rm 750.00
33 G I Pipe 15 mm dia A class Rm 90.00
34 G I pipe 25 mm dia A class Rm 140.00
35 G I pipe 40 mm dia B class Rm 237.00
36 G I pipe 50 mm dia A class Rm 270.00
37 G I Pipe 80 mm dia B Class Rm 485.00
38 G.I Bolts / Nuts and Washers kg 92.00
39 (a) G.I sheet ( plain ) tonne 57120.00
39 (b) G.I sheet ( Corrugated ) tonne 59160.00
40 Hariyala turfing sods sqm 38.00
41 Hectometer stone one line dressed Each 315.00
42 Hemp yarn kg 79.00
43 Honne wood planks cum 63240.00
44 Hume pipe with collar 150 mm dia (NP2) PH Rate Rm 315.00
45 Hume pipe with collar 300 mm dia (NP2) PH Rate Rm 530.00
46 J- Bolts 30 cm long Each 40.00
47 Jungle wood planks cum 26000.00
48 Khandki stone 15 to 20 cm height Each 15.00
49 Khandki stone 20 to 25 cm height Each 18.00
50 Khandki stone 25 to 30 cm height Each 20.00
51 Kilometer stone one line dressed Each 500.00
52 LDPE sheet ( Geo membrane ) 500 micron thick sqm 95.00
53 LDPE sheet ( Geo membrane ) 750 micron thick sqm 135.00
54 LDPE sheet ( Geo membrane ) 1000 micron thick sqm 185.00
55 M S Bolts / Nuts / Washers kg 79.00
56 Murum(including loading charges but excluding
Seigniorage charges )
cum 225.00
57 Oxalic acid Ltr 85.00
58 Oxygen gas cum 47.00
59 PVC sealing strip Rm 45.00
60 PVC water stopper 310 mm wide Rm 424.00
61 PVC pipe of 100 mm dia Rm 164.00
62 Reinforcement   steel   (HYSD/TMT   )   from   Primary   steel producers like TATA, SAIL, VSP, JSW, SHYAM STEEL, GOEL TMT,   V-XEGA,   JINDAL   PANTHER   and   BALAJI   SHAKTI
*(Note: As per Monthly rate fixed by Sub-Committee)
tonne 41,500.00
63 Resin bond Cement capsule Each 50.00
64 Rough  stone  20  x  20 x 75  cm  ( Including  Loading  charges
but  excluding Seigniorage Charges)
Each 35.00
65(a) Shahabad  stone  slab  polished  (including  loading  charges
but excluding Seigniorage charges)
sqm 250.00
65(b) Shahabad   stone   slab   non   polished   (including   loading
charges but excluding Seigniorage charges)
sqm 230.00
66 Stone chips (at dump yard/Spoil)(including loading charges
but excluding Seigniorage charges)
cum 200.00
67 Stone  chips  (  at  quarry  )(including  loading  charges  but
excluding Seigniorage charges)
cum 485.00
68 Structural    steel    angle    /    channel    /   beam    /    bars
*(Note: As per Monthly rate fixed by Sub-Committee)
tonne 45,000.00
69 Structural  steel  plate  /  flats  (including  loading  charges)
*(Note: As per Monthly rate fixed by Sub-Committee)
tonne 44,000.00
70 Super Plasticizer (Conplast RP-264 or equivalent ) kg 61.00
71 Synthetic Enamel paint 1st quality Ltr 210.00
72 Synthetic adhesive ( Resin + Hardener ) Kg 285.00
73 Tar felt joint filler board 12 mm thick sqm 379.00
74 Tar felt joint filler board 20 mm thick sqm 580.00
75 Through  stones  20  x  20  x  30  to  45  cm  (including  loading
charges but excluding Seigniorage charges)
Each 26.00
76 Through  stones  25  x  25  x  45  to  60  cm  long  (including
loading charges but excluding Seigniorage charges)
Each 45.00
77 Through  stones  30  x  30  x  65  to  75  cm  long  (including
loading charges but excluding Seigniorage charges)
Each 69.00
78 Un-coursed rubble stones ( at dump yard /Spoil) (including
loading charges but excluding Seigniorage charges)
cum 189.00
79 Un-coursed  rubble  stones  (  at  quarry  )(  including  loading
charges but excluding Seigniorage charges)
cum 370.00
80 Water proofing compound kg 95.00
81 Welding electrodes 4 mm dia Each 11.00
82 Wire brush Each 38.00
83 Wire mesh 20 gauge sqm 220.00
84 Zinc chromate red oxide primer paint Ltr 164.00
85 inorganic zinc silicate Ltr 480.00
86 solvent less coal tar epoxy paint Ltr 206.00
87 Zinc phosphate primer (as per BIS) Ltr 179.00
88 Allkyd based iron oxide paint (as per BIS) Ltr 151.00
89 (a) a) Cost of HDPE (80mm  dia) Rm 175.00
89 (b) b) Light black MS casing pipe   80mm dia (4mm thick) Rm 574.00
90 welded steel wire fabric 100X100X5 mm size Kg 163.00
91 Protective Mastic Ltr 415.00
92 Solvent less coal tar epoxy (brown) Ltr 206.00
93 Excavation of drain with  Excavator cum 42.00
94 Crushed stone sand/Rock sand 4.75mm to 2.36 mm as per
IS 383 (1970) (excluding Seigniorage charges)
Cum 590.00
95 Fly ash conforming to IS: 3812 ( Part II & I) Cum 72.00
96 Benching old embankment slopes 0.45 X 0.45 M RM 7.00
97 Laying of Sand Bags in the stipulated places including cost of empty cement bag, sand, thread, stitching charges and labour  charges  etc.,  with  13.615%  overhead  charges  and
contractors profit.
per bag 33.00
98 Rough   stone   for   revetment   225mm   thick   (   including
Loading charges but excluding Seigniorage charges)
cum 210.00
99 Eradication   of   Weed   growth   from   Drains,   Canals   by
spraying Chemicals
sqm 3.00
100 Thinner Ltr 77.00
101 Credit for excavated rock found suitable for use Cum 215.00
102 Earth  Cost  or  compensation  for  earth  taken  from  private
land (Excluding Seigniorage Charges)
Cum 69.00

MATERIALS FOR GATES & HOISTS FOR THE YEAR 2020-21

GUIDE LINES

1. For cast steel / Alloy steel / Forged steel / Bronze, aluminum alloy components the rates shall be inclusive of cost of basic metal for these components, casting / forging charges, machining charges and applicable excise duty on finished alloy component.

2. For other materials the rates shall be prevailing market rates.

Sl. No. Description of material Unit Scheduled Rates for the
Year 2020-21
1 Alloy steel ( IS : 1570-carbon steel ) shafts Kg 228.00
2 Alloy steel ( IS : 1570-stainless steel ) pins Kg 386.00
3 Bolt / Nut / Washer ( hot dipped galvanized ) Kg 110.00
4 Bolt / Nut / Washer ( stainless steel ) Kg 312.00
5(a) Bronze (IS:305)bearings/bushes Kg 870.00
5(b) Aluminium alloy(IS:305)bearings/bushes Kg 375.00
6 Cast iron blocks Kg 78.00
7 Cast steel drums / gears Kg 218.00
8 Cast steel pinions Kg 204.00
9 Cast steel wheels / pulleys / hubs / rollers /
retainers
Kg 165.00
10 Chemical for de-greasing/ de-rusting/phosphate
coating
Ltr 142.00
11 Coal tar epoxy paint Ltr 211.00
12 Forged steel hooks / shackles Kg 235.00
13 MS pipe 200 / 300 mm dia Kg 153.00
14 MS pipe 32 mm dia Rm 179.00
15 MS pipe 25 mm dia Rm 145.00
16(a) Rubber bottom seal ( IS : 11855 ) 120 X 16 mm Rm 730.00
16(b) Rubber bottom seal ( IS : 11855 ) 120 X 20 mm Rm 835.00
17(a) Rubber side seal ( music note type Teflon claded ) (
IS : 11855 ) 36Ø 113 X 14 mm
Rm 1,400.00
17(b) Rubber side seal ( music note type Teflon claded ) (
IS : 11855 ) 50Ø 125 X 16 mm
Rm 2,160.00
18(a) Rubber side seal ( music note type uncladed ) ( IS :
11855 ) 36Ø 113 X 14 mm
Rm 1,269.00
18(b) Rubber side seal ( music note type uncladed ) ( IS :
11855 ) 50Ø 125 X 16 mm
Rm 1,870.00
19 Rubber side seal Z-type ( IS : 11855 ) Rm 1,755.00
20(a) Rubber corner seal ( Teflon claded ) (IS : 11855) 36 Ø
113 X 14 mm
Each 2,800.00
20(b) Rubber corner seal ( Teflon claded ) (IS : 11855) 50Ø
125 X 16 mm
Each 3,780.00
21(a) Rubber corner seal ( un claded ) (IS : 11855) 36Ø 113
X 14 mm
Each 2,532.00
21(b) Rubber corner seal ( un claded ) (IS : 11855) 50Ø 125
X 16 mm
Each 3,376.00
22 Stainless steel plates / flats Kg 270.00
23 Welding electrode 4 mm dia x 450 mm ( radiographic
low hydrogen )
Each 18.00
24 Welding electrode 4 mm dia x 450 mm ( stainless
steel )
Each 25.00
25 Wire rope 6x37 construction ( IS : 2266 ) Kg 206.00
26 Zinc Kg 185.00
27 Zinc rich ( zinc content : 90 % ) epoxy primer Ltr 612.00

DETAILS OF CAPITAL COST OF MACHINERY 

EQUIPMENT GUIDE LINES FOR FIXING CAPITAL COST OF MACHINERY 

EQUIPMENT FOR THE YEAR 2020-21

1. The Capital cost of machinery / equipment shall be for new machinery / equipment and shall be inclusive of all taxes, duties, other levies.

2. The cost of transport vehicles / equipment shall be exclusive of cost of tyres and tubes.

3. The cost of drill rods / drill bits / air hose / water hose / road tax / insurance charges and other consumable accessories shall not be included in the capital cost.

4. In cases, where the current capital cost of machinery / equipment could not be collected through enquiries, the capital cost considered for previous year may be updated on the basis of average percentage increase / decrease in the index for machinery published in the R.B.I Bulletin

Sl. No. Description of material Unit Scheduled
Rates for the Year 2020-21
1 Agitator car / Transit mixer 2 cum (excluding tyres ) Each 23,05,200.00
  tyres and tubes 6 sets   97,125.00
2 Air compressor 5 cmm electric Each 7,29,300.00
3 Air compressor 7 cmm diesel Each 9,79,710.00
4 Air compressor 7 cmm electric Each 9,39,600.00
5 Air compressor 8.5 cmm diesel Each 11,10,270.00
6 Air compressor 8.5 cmm electric Each 11,47,500.00
7 Air compressor 15 cmm electric Each 14,03,010.00
8 Angle Dozer 90 HP Each 55,50,000.00
9 Batching plant 0.5 cum with accessories Each 12,69,900.00
10 Batching plant 2 x 1.00 cum with accessories Each 43,75,800.00
11 Batching plant 2 x 1.50 cum with accessories Each 57,63,000.00
12 Bending machine Each 5,55,500.00
13 Clamp shell and hoisting ropes Each 32,025.00
14 Concrete bucket 1.5 cum Each 57,120.00
15 Concrete hand mixer 45/30 ltr Each 17,065.00
16 Concrete mixer 300/200 ltr(diesel) Each 1,62,750.00
17 Concrete mixer 300/200 ltr ( electric ) Each 1,56,450.00
18 Concrete mixer 600/400 ltr(diesel) Each 2,70,810.00
19 Concrete mixer 600/400 ltr ( electric ) Each 2,65,200.00
20 Concrete paver 100 Sqm / hr Each 24,00,000.00
21 Convey mucker ( excluding tyres ) Each 39,62,700.00
  Tyres and tubes 6 sets   95,000.00
22 Core drilling machine Each 11,75,040.00
23 Diesel generating set 30 KVA Each 5,35,000.00
24 Diesel generating set 50 KVA Each 7,87,500.00
25 Diesel Loco 45 HP Each 21,77,700.00
26 Dewatering pump 5 HP diesel Each 34,680.00
27 Dewatering pump 5 HP electric Each 25,200.00
28 Dewatering pump 10 HP diesel Each 64,260.00
29 Dewatering pump 10 HP electric Each 58,140.00
30 Dewatering pump 20 HP diesel Each 2,05,000.00
31 Dewatering pump 20 HP electric Each 1,10,250.00
32 Drifter Each 11,27,100.00
33 Drilling jumbo ( excluding tyres ) Each 13,50,000.00
  Tyres and tubes 6 sets   96,600.00
34 Dumper 4.5 cum ( excluding tyres ) Each 15,81,000.00
  Tyres and tubes 6 sets   97,700.00
35 Geophysical Ele.resistivity meter Each 5,05,000.00
36 Grouting pump Each 1,55,040.00
37 Guniting / sand blasting equipment Each 2,95,800.00
38 Ice plant with accessories 30 t / day Each 25,20,000.00
39 Jack hammer Each 73,000.00
40 Needle vibrator 40 mm petrol Each 15,750.00
41 Needle vibrator 40 mm electric Each 15,120.00
42 Needle vibrator 60 mm petrol Each 17,085.00
43 Needle vibrator 60 mm electric Each 16,740.00
44 Planing machine 4 m stroke Each 8,00,700.00
45 Plate shearing machine up to 12 mm Each 4,77,750.00
46 Pneumatic placer 0.5 cum Each 6,04,860.00
47 Pneumatic tamper Each 90,825.00
48 Pug cutting machine Each 18,375.00
49 Pusher leg Each 55,125.00
50 Road roller diesel 10 t Each 9,30,000.00
51 Shovel 0.50 cum 75 HP Each 38,00,000.00
52 Shovel 0.85 cum 110 HP Each 64,00,000.00
53 Stationery derrick crane 5 t Each 6,68,100.00
54 Tipper 5 cum ( excluding tyres ) Each 17,82,000.00
  Tyres and tubes 6 sets   96,600.00
55 Tipping tub 1.5 cum Each 2,75,100.00
56 Tower crane 5 tonne Each 79,05,000.00
57 Transformer 250 KVA Each 4,72,500.00
58 Truck 10 t ( excluding tyres ) Each 15,75,000.00
  Tyres and tubes 6 sets   96,600.00
59 Truck mounted derrick crane 5 t ( excluding tyres ) Each 23,73,000.00
  Tyres and tubes 6 sets   97,700.00
60 Upright drilling machine Each 60,900.00
61 Ventilation fan 20 HP Each 2,78,250.00
62 Vibratory pad foot roller 8 t Each 30,24,300.00
63 Wagon drill Each 6,65,040.00
64 Water tanker 8000 Ltr. (excluding tyres) Each 15,17,250.00
  Tyres and tubes 6 sets   97,700.00
65 Welding set Each 48,960.00
66 Winch 35 HP electric Each 3,80,000.00
67 Hydraulic Truck Crane 30T Each 1,57,50,000.00
  tyres and tubes 6 sets   2,02,700.00
68 Hydraulic Truck Crane 16T Each 1,02,00,000.00
  tyres and tubes 6 sets   2,04,800.00
69 Heavy Duty Airless Spray Painting Equipment Each 5,01,840.00

ACCESSORIES TO MACHINERY / EQUIPMENT FOR THE YEAR 2020-21

Sl. No. Description of material Unit Scheduled Rates for the
Year 2020-21
1 Casing shoe bit Each 9,830.00
2 Diamond core bit BX size Each 10,045.00
3 Diamond core bit NX size Each 12,150.00
4 Double tube core barrel Each 13,125.00
5 Extension drill rod with coupling sleeve Rm 2,215.00
6 Jack hammer drill rod 1.5 m Each 4,750.00
7 Jack hammer drill rod 2.5 m Each 5,900.00
8 Nozzle for Guniting / sand blasting gun Each 725.00
9 Paving Cylinder Each 26,460.00
10 Rails 30R ( 30 kg / m ) tonne 50,140.00
11 Reamer shell Each 5,100.00
12 T.C. Cross bit 50 mm dia Each 4,785.00
13 T.C. Cross bit 75 mm dia Each 10,350.00
14 T.C. Cross bit 100 mm dia Each 12,165.00
15 Tyres and Tubes for truck Set 15,700.00
16 Wire rope 16 mm dia Rm 250.00

OTHER COSTS ON MATERIAL / MACHINERY / EQUIPMENT FOR THE YEAR 2020-21

1. The rate provided for ' SUNDRIES' (Lump sum provision for unquantified inputs in the data rates ) shall be updated on the basis of general percentage increase / decrease in the market rates or on the basis of R.B.I ' All Commodity' index.

2. The rate for structural steel fabrication shall include cost of all materials (except structural steel), machinery, labour and one coat of primer painting.

3. Demand charges and electric power charges shall be as per prevailing APCPDCL tariff.

4. Rate of interest on capital cost shall be as approved by Government or other competent authority.

Sl. No. Description of material Unit Scheduled Rates for the
Year 2020-21
1 Air hose 25 mm dia Rm 163.00
2 Air hose 50 mm dia Rm 249.00
3 Demand charges (HT-I : General-11 KVA category) on
power supply
KVA /
month
390.00
4 Diesel Ltr 67.82
5 Electric power (HT-VIII Category) including tax (1.5 times of the Tariff of HT-I(A): General-11 KVA
category)
Kwhr 10.00
6 Excise duty on Gates / Hoist supplies % 0.00
7 Insurance charges on machinery % / annum 0.00
8 Interest on capital cost % / annum 9%
9 Lubricants Ltr 240.00
10 Petrol Ltr 73.97
11 Rivets Kg 90.00
12 Road tax on transport vehicles Rs./annum R.T.A
13 Shalimastic sealing compound Kg 94.00
14 Shutter oil Ltr 34.00
15 Structural steel fabrication Kg 29.00
16 Sundries ( Lump sum for un quantified inputs ) LS 22.00
17 Water hose ( pressure ) 20 mm dia Rm 162.00
18 Steel wedges LS 17.00
19 Elbows / Nipple / Plugs etc., LS 18.00
20 Soldering materials LS 17.00
21 Steam circulation arrangement LS 18.00
22 Fuel charges ( gas for heating ) LS 17.00
23 Vulcanizing materials LS 18.00
24 Gas cutting set ( 2 No’s 15 m hose and nozzle unit ) Each 15,100.00
25 Grease Kg 242.00
26 Welding holder set ( cable / holder / gloves /mask etc) Each 8,500.00
27 Use rate of ropes LS 158.00

MATERIALS FOR GATES AND HOISTS FOR THE YEAR 2020-21

Sl.
No.
Description of material Unit Scheduled Rates for the
Year 2020-21
1 Worm reducers Each 2,10,600.00
2 Electric motor 20 HP(Double Shaft) Each 1,08,000.00
3 Electric motor 17.5 HP(Double Shaft) Each 76,500.00
4 Electric motor 12.5 HP(Double Shaft) Each 65,790.00
5 Electric motor 5 HP(Double Shaft) Each 31,110.00
6 Electric motor 3 HP (Double Shaft) Each 20,580.00
7 Electric motor 2 HP (Double Shaft) Each 11,880.00
8 Floating shaft 300 mm dia Kg 190.00
9 Manual operating system Each 28,875.00
10 Gate position indicator Each 2,14,200.00
11 Ele-magnetic brake Each 33,000.00
12 Electric cable / switch / control panel etc LS 58,650.00
13 Wire rope sockets Each 4,990.00

*****