02-Material & Work Items



MATERIAL RATES

Sl. No S.S.
Item No.
Description Unit Scheduled Rates for the Year 2020-21 Remarks
1 2 3 4   7
    (A) STONE AND ROAD MATERIALS      
    ROUGH STONE QUARRIED INCLUDING
WEDGING, BREAKING,BURNING, SPLITING
     
1 22.a For R.R Masonary Work (other than Granite, Dolomite and Trap 1 cum 152 Retained as per SoR
2019-20
2 b.I For SS Revetment work 225  mm 1 cum 152 do
3 b.ii For SS Revetment work 300  mm 1 cum 156 do
4 b.iii For SS Revetment work450  mm 1 cum 129 do
5 c Jeddy Stone above 450 mm to 600 mm 1 cum 179 do
6 d  I. Laterite for revetment  225 mm 1 cum 112 do
7 d  II. Laterite for revetment  300 mm 1 cum 131 do
8 d.iii Granite for  revetment 225 mm 1 cum 146 do
9 d.iv Granite for  revetment 300 mm 1 cum 148 do
    Note:- Only when other than granite is
not available
     
10 e Laterite for masonry 1 cum 129 do
11 f Cyclopean stones above 0.2 cum 1 cum 241 do
12 g For R.R.Masonry works ( granite, dolamite and trap variety) including loading & unloading 1 cum 239 do
13   NOTE:- For items 22(a) to 22©
,22d.iii,22d.iv 22(f) and 22(g) add extra Rs      /cum, wherever quarrying is done
by blasting
1 cum 70 do
    COURSED RUBBLE STONE QUARRYING WEDGING, BREAKING, BURNING AND SPLITTING  FOR SS FIRST SORT WORKS      
14 23.a Granite, dolamite and trap 1 cum 249 do
15 b For other varieties 1 cum 179 do
16 27 Granite stone slabs for culverts, lintels
and copings (3 faces dressed coarsed rubble masonry)
1 cum 1642 do
17   NOTE: - For items 23(a), 23(b) and 27 add extra  Rs.   Per Cum, wherever
quarrying is done by blasting
1 cum 70 do
18 28 Bond stones ( 600 x 200 x 200 mm ) each 29 do
19 b Chainage stones and Centre line stones
(750x150x150xmm)
each 35 do
  29 (a) Kilometers stones ( 1100 x 370 x 250
mm)
each Based on
detailed
 
20 31 Demarcation Stones ( 900 x 150 x 150
mm)
each 67 do
21 32.a Guard Stones ( 1200 x 200 x 200 mm ) each 97 do
22 b Guide Stones ( 800 x 150 x150 mm ) each 67 do
23 c Carving letters and figures in stone up
to 100 mm size
each 8 do
24 d Carving letters and figures in stone
above 100 mm size
each 9 do
    HARD BROKEN STONE OF GRANITE, TRAP AND  DOLERITE FREE FROM DUST OBTAINED BY QUARRYING, WEDGING, BREAKING, BURNING AND SPLITTING .      
25 33.a - do -    6mm      size (IS383,1970) 1 cum 505 do
26 b - do -   10mm      size (IS383,1970) 1 cum 657 do
27 c - do -    12mm      size (IS383,1970) 1 cum 781 do
28 d - do -  20mm      size (IS383,1970) 1 cum 870 do
29 e - do -    25mm      size (IS383,1970) 1 cum 830 do
30 f - do -    40mm      size (IS383,1970) 1 cum 505 do
31 g - do -   50mm      size (IS383,19705) 1 cum 433 do
32 h - do -    60mm      size (IS383,1970) 1 cum 398 do
33 I - do -   65mm      size (IS383,1970) 1 cum 360 do
34 j - do -    75mm      size (IS383,1970) 1 cum 289 do
35 k - do - 75 to 100mm   size (IS383,1970) 1 cum 236 do
36   NOTE:- (1) Add extra Rs.    /- per cum
for items 33 (a) to 33 (k) if the metal is obtained by blasting
  70 do
37   (2) Add 25% extra per cum if the metal is obtained by machine crushing
excluding cost of blasting.
  25% do
38   (3) Deduct Rs.  /- per cum if the metal or rubble is obtained from surface stone
and boulders.
  9.9 do
39   (4) Add Rs.  /- per cum for selection of stones and boulders from excavated spoil dumps for items 33 a to 33 k, when this addition of Rs.    /- per Cum is allowed deduction of Rs.     /- per  Cum mentioned under Note (3) above should
invariably be made.
  17 do
    SOFT BROKEN STONE SCREENED AND
FREE FROM DUST
     
40 33.l - do -     40 mm size  ( IS383,1970 ) 1 Cum 117 do
41 33.m - do -     50 mm size  ( IS383,1970 ) 1 Cum 105 do
42 33.n - do -     60 mm size  ( IS383,1970 ) 1 Cum 83 do
43 33.o - do -     65 mm size  ( IS383,1970 ) 1 Cum 74 do
44 33.p - do -     75 mm size  ( IS383,1970 ) 1 Cum 69 do
    HARD BROKEN STONE OF GRANITE TRAP DOLERITE AND DOLAMITE FREE FROM DUST OBTAINED BY QUARRYING WEDGING, BREAKING, BURNING AND SPLITTING   (QUARTZITE AND BASALT WITH AGGREGATE IMPACT OF LESS
THAN 20)
     
45 33a -do- 2.36 mm to 5 mm size (  IRC,
MORTH &MORD)
1 cum 485 do
  b -do- 5 mm to 7 mm size (  IRC, MORTH &
MORD)
1 cum 485 do
46 c -do- 9.5 mm to 11.2 mm size ( IRC,
MORTH & MORD)
1 cum 620 do
47 d -do- 12mm to 14 mm size ( IRC, MORTH
& MORD)
1 cum 700 do
48 e -do- 19 mm to 22 mm size ( IRC,MORTH
& MORD )
1 cum 821 do
49 f -do- 25 mm to 27 mm size ( IRC,MORTH
&MORD )
1 cum 790 do
50 g -do- 40 mm to 45 mm size ( IRC ,
MORTH &MORD)
1 cum 520 do
51 h -do- 50 mm to 55 mm size ( IRC,MORTH
& MORD )
1 cum 440 do
52 i -do- 60 mm to 63 mm size ( IRC, MORTH
&MORD)
1 cum 400 do
53 j -do- 65 mm  size ( IRC ,MORTH &MORD ) 1 cum 360 do
54 k -do- 75 mm  size ( IRC,MORTH &MORD) 1 cum 290 do
55 1 NOTE:- Add  extra Rs.  /- per cum for items 33 (a) to 33 (j) if the metal is
obtained by blasting
1 cum 70 do
56 2 Add 25% extra per cum if the metal is
obtained by machine crushing excluding cost of blasting.
1 cum 25% do
57 3 Deduct Rs.   /- per cum if the metal or rubble is obtained from surface stones
and boulders
1 cum 9.9 do
58 4 Add Rs.   /- per cum for selection of stones and boulders from excavated soil dumps for items 33 (a) to 33 (k), when this addition of Rs. /-  per cum allowed deduction of Rs.  /- per cum mentioned under note (3) above should invariably
be made
1 cum 17 do
    HARD BROKEN STONE OTHER THAN GRANITE SUCH AS QUARTZ, QUARTZ- NAPA AND BASALT SCREENED AND
FREE FROM DUST
     
59 33.q -  do -    10 mm size  (IS383,1970) 1 Cum 367 do
60   -do- 9.5 mm to 11.2 mm size (
IRC,MORTH & MORD )
1 Cum 367 do
61 r -  do -    12 mm size  (IS383,1970) 1 Cum 344 do
62   -do- 12mm to 14 mm size ( IRC , MORTH
& MORD )
1 Cum 344 do
63 s -  do -    20 mm size  (IS383,1970) 1 Cum 278 do
64   -do- 19 mm to 22 mm size ( IRC,MORTH
& MORD )
1 Cum 278 do
65 t -  do -    25 mm size  (IS383,1970) 1 Cum 273 do
66 u -  do -    40 mm size  (IS383,1970) 1 Cum 162 do
67   -do- 40 mm to 45 mm size ( IRC ,
MORTH & MORD)
1 Cum 162 do
68 v -  do -    50 mm size  (IS383,1970) 1 Cum 143 do
69   -do- 50 mm to 55 mm size ( IRC,MORTH
&MORD)
1 Cum 143 do
70 33.w -  do -    65 mm size  (IS383,1970) 1 Cum 135 do
71   -do- 60 mm to 65 mm size ( IRC, MORTH
&MORD)
1 Cum 135 do
72 x -  do -    75 mm size  (IS383,1970) 1 Cum 111 do
73   -  do -    75 mm size ( IRC ,MORTH &
MORD)
1 Cum 111 do
74 y -  do -    75 to 100  mm size
(IS383,1970)
1 Cum 87 do
75   -  do -    75 to 100  mm ( IRC, MORTH &
MORD)
1 Cum 87 do
    OTHER ITEMS      
76 33.z1 Laterite 40 to 75 mm ( ring) 1 Cum 96 do
77 z2 kankar, hard broken kankar  40 to 75
mm ( ring )
1 Cum 71 do
78 z3 Soling stone of 150 mm size of granite, trap and Dolamite varieties. 1 Cum 90 do
79   NOTE:- (1) Add extra for items  to 33(z3) Rs  /- Per cum, wherever quarrying is done by blasting. (2) Wherever controlled blasting is resorted to the Chief Engineer concerned shall approve the observed data in support of
SS item No. 22 a to 22 c , 22g, 23
1 Cum 70 do
80 z4 Soling stone of 150 mm size other than
granite variety
1 Cum 63 do
81 z5 Soling Stone laterite, Kankar 150mm, 1 Cum 39 do
    surface stone      
82 z6 Field picked metal unbroken    20 mm
size
1 Cum 52 do
83 z7 - do -   25 mm size 1 Cum 40 do
84 z8 - do -   40 mm size 1 Cum 46 do
85 z9 - do -   50 mm size 1 Cum 40 do
86 z10 - do -   60 mm size 1 Cum 34 do
87 z11 - do -  80 mm size 1 Cum 30 do
88 NOTE:- Add Rs.   /- Per Cum for selection of stone and boulders  from excavated spoil dumps for  items 33 (Q) TO 33 Z ,  when this addition of Rs.     /- Per cum is  allowed  deduction of Rs.
/- per cum should  invariably  be made towards
the metal  or rubble  if it is obtained from surface stone and boulders.
    do
89 34 Gravel 1 Cum 98 do
90 35 a Quarry rubbish 1 Cum 77 do
91 b HBG Stone Chips 2.36mm and below 1 Cum   As per I&CAD S.No
67 of
Materials
  NOTE:Add 25% extra per cum for item 91(b)  if the metal is obtained by machine crushing
excluding cost of blasting
     
92 36.a Sand for mortar, ceiling coat including washing screening etc., 1 Cum   As per I&CAD S.No
28 of
Materials
93 36.b Sand for Concrete 1 Cum   As per I&CAD S.No
27 of
Materials
94 36.c Sand for filling and blindage 1 Cum   As per I&CAD S.No
27 of
Materials
95 37 Clay for puddle and masonry Items 38
(a) to 39 (h) As per local prevailing rates based on competitive quotations.
1 Cum 33 do
    (C) LIME AND CEMENT      
96 40 to
41(c)
       
97 42 Cement Metric
Tonne
   
  NOTE: (1) The rate is material at site ( No conveyance charges to be allowed)   2)As per the rates applicable to the District.  3) Least of the (1) and (2 ) above may allowed 4) The price of cement will be reviewed and fixed on monthly basis as per G.O.Ms.No.94 T,R&B Dept
Dt16-4-2008 and rates will be communicated separately.
   
98 42.a Labour for mixing cement mortar 1 Cum Based on detailed analysis as per
MoRTH Data
 
99 b Mixing of cement mortar by machine 1 Cum  
100 c Grinding lime mortar or Surkhi mortar 1 Cum 89 do
101 d Shell lime slaked and screened 1 Cum 893 do
102 e White cement 1 Kg. Building SSR  
    (D) MORTARS      
103 43 to
45
Items 43 to 45      
    (E) METAL AND IRON WORKS      
104   Mild steel rods 6mm dia. One Metric Tonne Monthly Rates will be communicated by Govt.  
105   Mild steel flats One Metric Tonne  
106   Mild Steel, Structural Steel, I.e., Angles, Channels and I sections. One Metric Tonne  
107   High Yield Strength Deformed Bars One Metric Tonne  
108   Mild Steel Plates One Metric Tonne  
  NOTE: (1) The rate are inclusive of sales tax. 2) As per the rates applicable to the District. 3) Least of the (1) and (2 ) above may allowed  4) The prices of steel will be reviewed and fixed on monthly basis  as per G.O.Ms.No.94 T,R&B Dept, Dt 16-4-2008 and rates will be
communicated separately.
   
    III RATES OF WORKS      
    (A) CLEARING SITE      
109 1.a Clearing heavy Jungle 1 Sqm Based on detailed analysis as per MoRTH Data  
110 b Clearing light Jungle 1 Sqm  
111 c Clearing Scrub Jungle 1 Sqm Scheduled Rates for the Year 2020-21  
112 d Clearing Juliflora (Prosafis) jungle including up-rooting and removing of
Juliflora stumps.
1 Sqm do
113 2.a.I Cutting and removing Palmyrah trees
including stacking of girth 30 to 100 cm.
Each 18 do
114 ii - do -  100 to 200 cm. Each 42 do
115 2.b.I Uprooting and removing Palmyrah stumps including stacking of girth 30 to
100 cm.
Each 44 do
116 ii - do -  100 to 200 cm. Each 46 do
117 2.c.I Cutting and removing date trees
including stacking of girth 30 to 100 cm
Each 23 do
118 ii - do -  100 to 200 cm Each 33 do
119 d.I Uprooting and removing stumps of  date
trees including stacking of girth 30 to 100 cm.
Each 23 do
120 ii - do -  100 to 200 cm Each 29 do
121 e I Cutting and removing other kind of
trees including stacking of girth 30 to 100 cm
Each 29 do
122 ii - do -  100 to 200 cm Each 44 do
123 iii - do - above 200 cm Each 71 do
124 f.I Uprooting and removing stumps of other kind of trees including stacking of girth
30 to 100 cm.
Each 23 do
125 ii - do -  100 to 200 cm Each 31 do
126 iii - do - above 200 cm Each 39 do
127 3.a Uprooting and clearing prickly pear
jungle
1
Sq.m
2 do
128 b - do - under 2.5 meters height including
burning and burying as directed.
1
Sq.m
2.9 do
129 c - do - over 2.5 meters height including burning and burying with an initial lead
of conveyance
1
Sq.m
3.3 do
130 4.a Removing of natchu, goobi, thooti etc., from drains, channels including clearance if not more than 1 metre depth of water with an initial lead of 10
metres and lift of 2 metres.
1
Sq.m
1.8 do
131 b.I Clearing alchi, tilla 1
Sq.m
3.6 do
132 b.ii Removal of Jammu 1
Sq.m
3.1 do
133 c.I Removal of imponea, cornea 1
Sq.m
3.4 do
134 c.ii Removal of water hyacinth up to 30 cm
thick.
1
Sq.m
3.5 do
135 c.iii - do - more than 30 cm thick 1
Sq.m
4.8 do
136 d Removal of natchu, goobi, thooti etc.,
for every extra lead or lift over the initial lead or lift.
1
Sq.m
1.3 do
    (B) DISMANTLING      
  5 DISMANTLING, CLEARING AWAY
MATERIALS USEFUL FOR REUSE.
     
137 n.(i) Dry rough stone revetment for  aprons
and stacking within 40 metres
1 cum 59 do
    (C) QUARRYING AND BLASTING      
138 6 Blasting and removing hard granite measured in solid 1 cum Based on detailed analysis as per
MoRTH Data
 
  7 Drilling holes in hard granite or sheet
rock
     
  a) Manually ( Hand)      
139 I) 20 mm dia meter 1 RM 118 do
140 ii) 25 mm dia meter 1 RM 124 do
141 iii) 36 mm dia meter 1 RM 143 do
  b) Pneumatic Compressor      
142 I) 20 mm dia meter 1 RM 133 do
143 ii) 25 mm dia meter 1 RM 144 do
144 iii) 36 mm dia meter 1 RM 157 do
  8 Grouting the holes with neat cement
slurry excluding cost of steel
     
145 I) 20 mm dia meter 1 RM 84 do
146 ii) 25 mm dia meter 1 RM 105 do
147 iii) 36 mm dia meter 1 RM 131 do
           
271   Jute Rope Mtr 8.3 do
272   De bonding Strips Mtr 10 do
273   Selent Ltr 66 do
274   Ply sheet 125 micron 1 Sqm 17 do
275   Rural water 1 kl 73 do
276   Urban water 1 kl 98 c

*****