ANNEXURE-IV
RATES FOR CONVEYANCE OF MATERIALS BY HEAD LOAD
sn no | Description of Material | Unit | Basic Rate approved for the year 2020-2021 (w.e.f. 20.04.2020} | ||
LEAD | LIFT | ||||
Above 1Om and upto 1OOm | Add extra for every additional 1OOm or part thereof | Add extra for every 1m height or part thereof for more than 2m lift | |||
1 | Rough Stone, Broken Stone Jelly, Cut Stone, RCC Slab, Sand-Cement Block, Wooden Scantling, Wooden Plank | cum. | 101.20 | 42.00 | 10.95 |
2 | Lime, Lime Stone, Laterite, Brick Jelly, Earth, Sand, Gravel, Surki, Pond Ash (Wet / Dry), Crushed Stone Sand, Stone Dust | cum. | 53.80 | 42.00 | 8.20 |
3 a | Mangalore Tiles | 1000 Nos. | 109.70 | 55.10 | 13.85 |
b | Machine Pressed Tiles | 2000 Nos. | 109.70 | 55.10 | 13.85 |
c | Hydraulic Pressed Nosaic Flooring Tiles | 1500 Nos. | 109.70 | 55.10 | 13.85 |
d | Terrace Bricks, Flat Tiles and Pan Tiles | 2500 Nos. | 109.70 | 55.10 | 13.85 |
e | Bricks | 1000 Nos. | 109.70 | 55.10 | 13.85 |
4 | Cement, AC Sheet, Bitumen, Asphalt, far | MT | 99.90 | 55. 10 | 10.95 |
5 | Steel | MT | 167.90 | 67.50 | 13.85 |
Note: | |||||
1 | Fraction of 100 metres to be rounded ofT to the nearest 100 metres. | ||||
2 | The rates indicated in the table shall be applicable only to inaccessible places (i.e.) the places wherever the Bullock Carts cannot move [Chief Engineer (General}, Memo No. CTO (A) / 38153 / 89, dated 03.02.1989]. | ||||
3 | For an initial lead of 10 metre and initial lift of 2 metre, no charge towards head load is allowable. | ||||
4 | The Basic Rate adopted under this Head, "Annexure-IV — Rates of Conveyance of Materials by Head Load" is exclusive of all taxes and GST. |
ANNEXURE-V
CONVEYANCE TABLE
{A}. RATES FOR CONVEYANCE OF MATERIALS BY ROAD IN PLAINS
s. No. |
Distance in kilometre | Basic Rate approved for the year 2020-2021 | w.e.f. 20.04.2020} | |||||
Cement, ‹S*tuee»l |
Lime Stone, Lateriter rick Jelly, Wood Work, Pond Ash (Wet / Dry}, Stone Dust {One cubic metre) |
Rough Stone, Bond Stone, Cut Stone, Broken Stone Jelly, Sand, Gravel, Surki, Earth, Crushed Stone Sand (One cubic metre) |
Third Class Country Bricks (Kiln Burnt} {1000 Nos.} |
Mangalore Tiles (1000 Nos.}, Machine Pressed Tiles (2000 Nos.), Hydraulically Pressed Mosaic Flooring Tiles (1500 Nos.} |
Bricks II Class Chamber Burnt Bricks (Table Moulded / Ground Moulded}, Fly Ash Bricks (1000 Nos.) |
|||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
1 | Co-efficient | 1.00 | 1.10 | 1.60 | 1.35 | 1.80 | 2.25 | |
2 | Add for every extra 1 Km | and art | thereof.................. | |||||
3 | 0 - 10 Km. | 6.51 | 7.14 | 10.40 | 8.78 | 11.70 | 14.62 | |
4 | 10 - 20 Km. | 5.57 | 6.12 | 8.90 | 7.51 | 10.02 | 12.52 | |
5 | 20 - 40 Km. | 4.79 | 5.27 | 7.67 | 6.45 | 8.62 | 10.77 | |
6 | 40 - 80 Km. | 4.13 | 4.55 | 7.19 | 5.57 | 7.42 | 9.30 | |
7 | Above 80 Km. | 3.77 | 4.15 | 6.03 | 5.09 | 6.78 | 8.48 | |
8 | Loading Charges | 116.30 | 55.50 | 38.00 | 54.60 | 54.60 | 54.60 | |
9 | Unloading Charges | 116.30 | 55.50 | 38.00 | 54.60 | 54.60 | 54.60 | |
10 | Add above extra for inter state works |
23.40 | 25.70 | 37.60 | 31.60 | 42.20 | 53.00 | |
Note | : | |||||||
1 | The above rates do not include stacking charges [as per Circular Memo No.230 Wks. IV (2) / 62-3, dt.10.06.62 of Chief Engineer (General)]. | |||||||
2 | For conveyance of materials on cart track, allow 20% extra over the above rates excluding loading and unloading charges. | |||||||
3 | For sandy and slusly soil tracks, add 50% extra over the above rates excluding loading and unloading charges. | |||||||
4 | The quantity for payment towards conveyance of earth in Column (5) is for the pit measured quantity at the site of excavation only. | |||||||
5 | For conveyance of laterite, broken stone jelly, etc., through lorries, the rates provided are for the volume with voids. | |||||||
6 | For all materials which finds place in Column, 3,4,5,6,7 and 8 above, necessary incidental charges, loading charges and unloading charges have been included already under their basic cost furnished below the head "Rates of Materials" itself. Hence, no separate incidental charges, loading and unloading charges shall be allowed for the above materials. | |||||||
7 | The Basic Rate adopted under this Head, "Annexure-V — (A). Rates of Conveyance of Materials by Road in Plains" is exclusive of all taxes and GST. |
ANNEXURE-V
CONVEYANCE TABLE
{B}. RATES FOR CONVEYANCE OF MATERIALS BY ROAD IN HILLS
SI. No. |
Distance in kilometre |
Basic Rate approved for the year 2020-2021 (w.e.f. 20.04.2020) | |||||
Cement, St eel {1 MT) |
Lime Stone, Laterite, Brick 3eIIy, Wood Work, Pond Ash {Wet / Dry}, Stone Dust {One cubic metre) |
Rough Stone, Bond Stone, Cut Stone, Broken Stone 3elly, Sand, Gravel, Surki, Earth, Crushed Stone Sand (One cubic metre) |
Third Class Country Bricks {Kiln Burnt) {1000 Nos.) |
Mangalore Tiles {1000 Nos.), Machine Pressed Tiles (2000 Nos.}, Hydraulically Pressed Mosaic Flooring Tiles (1500 Nos.} |
Bricks II Class Chamber Burnt Bricks (Table Moulded / Ground Moulded), Fly Ash Bricks {1000 Nos.) |
||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
Co-efficient | 1.00 | 1.10 | 1.so | 1.as | 1.so | z.as | |
Add for every ext | ra 1 Km | and part thereof... | |||||
a | 0 - 10 Km. | 13.02 | 14.28 | 20.80 | 17.56 | 23.40 | 29.24 |
b | 10 - 20 Km. | 11. 14 | 12.24 | 17.80 | 15.02 | 20.04 | 25.04 |
C | 20 - 40 Km. | 9.58 | 10.54 | 15.34 | 12.90 | 17.24 | 21.54 |
d | 40 - 80 Km. | 8.26 | 9.10 | 14.38 | 11.14 | 14.84 | 18.60 |
e | Above 80 Km. | 7.54 | 8.30 | 12.06 | 10.18 | 13.56 | 16.96 |
Note | |||||||
1 | The above rates do not include stacking charges [as per Circular Memo No. 230 Wks. IV (2} / 62-3, dated 10.06.1962 of Chief Engineer (General)]. |
||||||
2 | For conveyance of materials on cart track, allow 20% extra over the above rates excluding loading and unloading charges. | ||||||
3 | For sandy and slusly soil tracks, add 50% extra over the above rates excluding loading and unloading charges. | ||||||
4 | The quantity for payment towards conveyance of earth in Column (5) is for the pit measured quantity at the site of excavation only. | ||||||
5 | For conveyance of laterite, broken stone jelly, etc., through lorries, the rates provided are for the volume with voids. | ||||||
6 | For all materials which finds place in Column, 3,4,5,6,7 and 8 above, necessary incidental charges, loading charges and unloading charges have been included already under their basic cost furnished below the head "Rates of Materials" itself. Hence, no separate incidental charges, loading and unloading charges shall be allowed for the above materials. | ||||||
7 | The Basic Rate adopted under this Head, "Annexure-V — (B). Rates of Conveyance of I'dateriaIs by Road in Hills" is exclusive of all taxes and GST. |
*****