Annexure 1  

Procedure for availing the benefit of Additional FSI / DR for the area acquired by the government for any public purpose   

The Authority shall permit on the same plot, additional FAR exceeding max permissible FAR, as the case may be in respect of such part of land that is required from the land area, for the purposes of road widening, laying of service lines and such other public utility services, owner/applicant releases such land required by the Authority for such public utilities, without claiming any compensation thereof.

1. The owner or lessee of a land who has right to transfer the land (a part or whole), which is, required for-  I. any road widening/new road formation as proposed in the Regional Plan or ODP,  II. any traffic and transport infrastructure development such as bus stops/stands etc., and  III. any urban infrastructure development such as water supply, sewerage, drainage, electricity, education, health, notified by the Administration or Government Agency or any local body, is eligible for the award of Development Rights [DR] in the form of FSI [in lieu of monetary compensation] to the extent and on the conditions set out below.

 2. The award will entitle the owner of the land to FSI in the form of Development Rights, which he may use himself in any of his own land within the same village.

3. The land required for the project/scheme shall be surrendered before getting the DR, through a registered gift deed in favour of Member Secretary, PDA, after removal of structures if any in the land gifted, and, shall be free from any encumbrance.

4. In case of road widening, after leaving the road widening space surrendered, the compound wall and gates shall be reconstructed at the cost of the owner or lessee before getting the DR.

5. If the holder of DR intends to transfer it to any other person, it shall be done with the clearance of the Member Secretary, PDA, by obtaining due endorsement on the DRC after submitting a formal application in the prescribed format. If this procedure is not followed then the transfer will not be valid, and the certificate will be available for use only by the original/earlier holder.

6. The holder of DR who desires to utilize the FSI while making development in a site shall attach in his PPA a copy of the valid DR.

7. Any DR obtained by misrepresentation of facts shall be liable for cancellation and PDA shall take further action as per Law against the act.

8. DR may be used in one or more sites within the same village only whether vacant or developed or by making additional constructions, in consistence with the Development Regulations. Further the FSI of plots shall not exceed 0.5 over and above the normally permissible FSI for that use in those receiving sites.  

9. Before granting Planning Permission for development in the receiving plot, the endorsement on the valid original DR shall be made by Member Secretary, PDA regarding the extent of utilization of FSI credit, the balance credit of unutilized credit of FSI, if any.

10. DR shall be issued on Rs.100/- stamp paper in an appropriate form prescribed and duly signed by Member Secretary, PDA. Such a certificate will be a transferable negotiable instrument only after due endorsement by Member Secretary, PDA as provided in regulation (8) above.

11. The Member Secretary, PDA shall maintain a register in an appropriate form with regard to all transactions regarding grant and utilization of Development Rights.

12. The lands so surrendered for obtaining DR shall become the public property for the purpose and PDA may transfer these lands to the Departments/Government agency concerned on 'as- is- where- is' condition for taking further action on the execution of the project/scheme and maintenance.

13. The loss of DR by the holder will not entitle for availing the FSI credit. It shall be the responsibility of the DR holder to keep it safe and secure. No duplicate DR will be issued.

14. In all cases of sites wherein road widening, or link road/new road alignment is proposed in the Master Plan or Detailed Development Plan, Planning Permission for developments within the site shall be considered only if the land affected by the road widening/link road/is transferred to Member Secretary, PDA through a registered Gift Deed. If the FSI eligible for above said land transferred is availed/received in the remaining part of the available site itself, then the issue of DR separately does not arise. 

15. Further these provisions of grant of DR will not arise in cases of sub divisions/ Layout developments where as part of the road network within the site, road widening or link road or new roads have to be provided. 

Annexure 2  

Form for application for development work, to erect, re-erect or to make alteration in any place in a building and for Layouts/Subdivision of Land (On Rs.1.00 stamp Paper )

To The Authority,

UT Administration of

Dadra and Nagar Haveli

Silvassa.  

Sir/Madam,  

I hereby give notice that I intend to carry out development/to erect, re-erect or to make alteration in the building No..............................or to.............................on/in Plot No.............................. Revenue No. /CTS

No............................... situated in Road /Street ..............................Town....................................and in accordance with the Rules of Dadra & Nagar Haveli Development Control Regulation 2009/Outline Development Plan 2031, I forward herewith all the documents as per the checklist required along with the following plans and specifications in triplet duly signed by me.  I also certify that Shri.......................... Architect and Shri. ...................Structural Engineer who have been appointed by me will supervise its erection.  

1. Ownership title

2. Location plan

3. Site plan  

4.. Sub-division /layout plan

5. Building plan

 6. Specifications - general and detailed  

I also certify that I will intimate the authority in writing if I terminate any of the Architect /Structural Engineer before the construction is complete.  

I request that the construction may be approved and permission accorded to me to execute the work.   

Date: .......................................
   

Signature of the Owner ................................  

Name of the Owner .....................................

Address of the Owner....................................

Annexure 3

Form of Supervision  

To

The Authority

UT Administration of

Dadra and Nagar Haveli

Silvassa.  

Sir/Madam,  

I hereby certify that the development work/erection re-erection /demolition or material alteration in/of building for..................................................use in Plot No...................................................................situated

at Street/Road ....................................................section ....................................................Zone of .......................................................................... Area at ................................................................City/Town shall be carried out under my supervision and I certify that all the material  (type & grade) and the workmanship of the work shall be generally in accordance with the general specifications submitted along with and that work shall be carried out according to the sanctioned plans.  I shall be responsible for execution of work in all respect.    

Name & Signature of Licensed Architect..................................................

License No. of Architect & Validity .......................................................

Address of Licensed Architect .....................................................................

Name & Signature of Licensed Structural Engineer ............................................

License No. of Structural Engineer & Validity........................................................

Address of Licensed Structural Engineer .........................

Date: ..................................

Annexure 4  

Certificate of Undertaking of Registered Architect   

To The Authorit

 UT Administration Office

Dadra and Nagar Haveli

Silvassa  

Ref: Proposed work of......................................... at Plot No. Survey No./ ........................................... in Village ....................................for (Name of Owner /Organizer / Developers /Builder) ...................................resident /office at ........................................ 

I hereby certify that I am a Member of Council of Architecture and my License number is ........................and is valid up to .................................  

I hereby certify that I am appointed as the Registered Architect to prepare the plans, section and details as required under the provisions of the applicable Act/Development Control Regulation /Bye-laws for the above mentioned project and that I have prepared and signed the same and that the execution of the project shall be carried out under my direction and supervision as per the approved drawings.  I am fully conversant with the provisions of the applicable Regulations/Bye-laws which are in force and about my duties and responsibilities under the same and I undertake to fulfill them in all respect.  I also undertake to plan, design & provide adequate measures for installation of plumbing, drainage, sanitation and water supply.  The appointment of site supervisor, clerk of works, building contractor, plumbing contractor and electrical contractor as required under these regulations shall be made at appropriate stage and shall be communicated to the Authority before the relevant work commences.  

I also undertake to intimate the authority in writing if my services are terminated before the work is completed or during the process of construction.   

Signature of Owner ..............................................

 Date.........................................

Name in Block Letters ..................................... 

Address ................................................

Signature of the Architect...............................

Date ..................................................

Name in Block Letters................................................................

Address...............................................................   

Registration No & Validity............................................................

Annexure 5  

Certificate of Undertaking of Registered Structural Engineer  

To The Authority

UT Administration Office

Dadra and Nagar Haveli

Silvassa  

Ref:  Proposed work of..................................... at Plot No. /Survey No./.......................................in Village............................................................. for (Name of Owner /Organiser /Developers /Developers /Builder) ...................................................residence / office at ...............................
I hereby certify that I possess a valid Registration to act as a Structural Engineer.  I also certify that I am appointed as the registered structural Engineer to prepare the structural report, structural details and structural drawings for the above mentioned project.    I am fully conversant of my duties and responsibilities under the applicable Regulation /Bye-laws and assure that I shall fulfill them in all respect.  
I also certify that the building plans submitted for approval satisfies the safety requirements as stipulated under Regulation No............................and the information given therein is factually correct to the best of my knowledge and understanding.  

It is also certified that the structural design including safety from hazards based on soil conditions shall be duly incorporated in the design of the building and these provisions shall be adhered to during the construction   
I also undertake to intimate the authority in writing if my services are terminated before the work is completed or during the process of construction.  
I undertake to supply the owner and supervisor the detailed drawings.  

Signature of Owner with date ..............................

Name in Block Letters...................................   

Address............................................

Signature of the .........................

Structural Engineer with date........................

Name in Block Letters ......................................   

Address.........................................

Registration No. & Validity..................................

Annexure 6

Form of Compliance to Development Control Regulations for erect, re-erect or to make alteration in any place in a building and for organized development (On Rs.20.00 stamp Paper)   

To The Authority

UT Administration of

Dadra and Nagar Haveli

Silvassa.  

Sir/Madam,  

I/We hereby give notice that I intend to carry out development/to erect, re-erect or to make alteration in the building No......................................or to....................................... on/in Plot No................................................. Revenue No./CTS/No.................................situated in Road /Street....................................... Town /Village........................................ in accordance with the Rules of Dadra & Nagar Haveli Outline Development Plan 2031/Development Control Regulations 2009. In support of the application I/we wish to make the following statement.  

A.) Land/Location Details (i) Plot No/CTS No/Revenue Number:................................................

(ii) Road Street Name:...........................................

(iii) ROW of abutting Road/Street:........................................................

(iv) Plot Area(in Sqm):_.........................................

(v) Ground Coverage (in Sqm):...........................

(vi) Percentage covered Area:......................................

(vii) Land use Zone: .............................................

(viii) Land Use Mix of proposed Development/building (In Sqm) 

Residential Business Mercantile Retail Educational Institutional Assembly
             

B.) Building Details (i) Total Built Up Area (For FAR):.............................

(ii) FAR Permissible:....................................

(iii) FAR Consumed:........................................

(iv) Total Number of Parking:.........................................................

(v) No. of Covered Parking:..............................................................

(vi) No of Open Parking................................................

(vii) Means of Access (In Metres):......................................

 (viii) Height of Building:......................................................

(ix) Number of Storeys.........................................................

(x) Front Open space (In Metres).........................................

 (xi) Rear Open space (In Metres): .......................................

xii) Side Open Space 1 (In Metres): .....................................

(xiii) Side Open space 2 ( In Metres):....................................

(xiv) Inter space of Buildings...................................................

(xv) Ventilation shaft (In Metres):..............................................

I/We hereby certify that all the information provided in this statement is true to the best of my knowledge.  

Date: .................................

Signature of the Owner......................................           

 Name of the Owner   ...................................................         

Address of the Owner .......................................................

 

Annexure 7  

Check list of Documents to be submitted while making application for grant of Construction permission and Occupancy Certificate   

Check List for New Construction Permission  

1) Application in the form Annexure -2 along with the form of Annexure 3 to 6

2) Copy of N.A. Order

3) 7/12 extract (Original plus one copy) along with Sales /Lease deed.

4) If land is part of a Private Industrial Estate, true copy of approved lay out Plan or a signed statement  on company’s letterhead that it is not applicable.

5) If part of a Private Industrial Estate, a certificate of completion of Development work as per approved layout plan or signed statement on company’s letter head that it is not applicable.

6) Copy of the Amalgamation Order in original, if relevant or signed statement on company’s letter heads that it is not applicable and that NA is for the entire survey no.

7) Original Certified Map of Survey /Plot No. issued by Survey and Settlement Officer, Silvassa.

 8) Key Plan (Location Plan) as required under Clause 6.8 (Three copies).

9) Site Plan with details as per Rule 6.9. (Three copies).

10) Building Plan giving details as per Rule 6.10 and 6.11 of D.C. Rules (Three copies)

11) Service Plan giving details as per Rule 6.12 of D.C.Rules. (Three copies)

12) Copy of challan of payment for scrutiny charges as per Rule 7.1a and b of D.C.Rules.

13) If revised Plan, Copy of the original Construction Permission and Completion Certificate.

14) Certificate or Order of the Land Acquisition Officer if claiming benefit of additional FSI in lieu of compensation.  

Check List for Occupancy /Part Occupancy Certificate  

1) Application form of Completion Certificate for issue of Occupancy /Part Occupancy Certificate as per Annexure 13.

2) True copy of Construction Permission order.

3) True copy of Approved building plan (Two copies)

4) Existing Building Plan (three copies) as per the actual construction carried out if there is minor deviation from the Approved Plan.

5) Structural Stability Certificate from Licensed Architect and/or Structural Engineer as per the format in Annexure 14. 

Annexure 8  

Form of sanction of development permission and commencement certificate  

To ................................................................

With reference to your application No.. dated.............................................. for development permission and grant of commencement certificate to carry out development /to erect, re-erect or to make alteration in the building No............................... or to ................................on/in Plot No..................................... Revenue NO./CTS.No. situated in Road.............................. /Street ..................................Town ......................................the commencemen certificate is granted under the following conditions:   

1.....................................

2..................................

3........................................

4. .........................................

Yours faithfully,  

The Authority,

Department of Town and Country Planning

UT Administration of Dadra and Nagar Haveli. 

Annexure 9  

Form of Refusal of sanction  

To ............................................................

Sir/Madam,  

With reference to your application No........................................................dated ......................................... for the grant of sanction for the development work/the erection of a building /execution of work in Building .Plot No. .................................................._................................................. in ..................................... Zone situated at ................................................Road ........................................... of . .............................................Indl./Commercial /Residential Area of village .......................................................  

I have to inform you that the sanction has been refused on the following grounds:  

1........................................................

2. ........................................................

3.  .....................................................

4.......................................................

5........................................................

 6.........................................................

Office No........................................

 Office Stamp....................................

Date :.........................................

Yours faithfully,  

The Authority,

UT Administration of  Dadra and Nagar Haveli,

Silvassa

Annexure 10  

Form for Notice for Commencement of Work  

To The Authority

 UT Administration of

Dadra and Nagar Haveli

Silvassa.  

Sir/Madam,  

I hereby certify that the development work/erection/re-erection /demolition or material alteration in/of building .............................................on/in plot No ...................................... revenue/CTS No in  .................................................zone. Area /Road ................................... of ................................... Village will be commenced on..............................................as per your permission vide office communication No................................_ dated ..............................under the supervision of .................................... Licensed Architect /Engineer /Structural Engineer / Supervisor, License No...........................................and in accordance with the plans sanctioned.    

Signature of Owner /Licensee /Lessee..............................................

Name of owner ............................................

(In block letters)

Address of owner   ...................................................

Date: .................................................

Annexure 11  

Intimation regarding Foundation and Footing  

To The Authority

UT Administration of

Dadra and Nagar Haveli

Silvassa.

Sir/Madam,  

We hereby inform that the work upto footing is complete and the foundation work upto plinth is to be started.  I certify that I have personally supervised the work and the depth of foundation is ............................meters which will allow the building construction upto ..................... floors.  The structure of the building accordingly will be safe as per the standards of the National Building Code and the ISI codes for various hazards.    

Name & Signature of Licensed Architect ....................................................

License No. of Architect & Validity............................................

Address of Licensed Architect................................................. 

Name & Signature of Licensed Structural Engineer .................................

License No. of Structural Engineer & Validity.............................................

Address of Licensed Structural Engineer ................................................  

Date : ..............................................

Annexure 12  

Form for informing completion of work upto Plinth Level  

To The Authority

UT Administration of

Dadra and Nagar Haveli

Silvassa.   

Sir/Madam,  

I hereby inform that the construction up to plinth/column has been completed for the Building....................................................on/in Plot No....................................... in.Zone situated at ......................................................................... Road /Street .of.......................................... Village as your permission vide office Communication No. ................................dated ............................... under my supervision and in accordance with the sanctioned plan.  

The completed work may be checked an................................d permission be given to proceed with further work.   =

Name & Signature of Licensed Architect.License No. of Architect & Validity................................

Address of Licensed Architect ._   ........................

Name & Signature of Licensed Structural Engineer .................................

License No. of Structural Engineer & Validity .............................

Address of Licensed Structural Engineer .................................  

Date :......................

Annexure 13  

Form for Approval of Work up to Plinth Level  

To        

Sir/Madam,  

With reference  to your intimation No.............................. dated ................................... regarding the completion of construction work upto plinth/columns for Building for Industrial /Residential /Commercial purpose on/Plot N......................................... of ....................................zone situated at Road /Street ...................................... in .......................................,I have to inform that further work  may be proceeded with as per sanctioned plans/shall not be proceeded with as the construction up to plinth level is not as per sanctioned plans.  

Office No............................

Office Stamp ..................................

Date:......................................

Yours faithfully,   

The Authority,

UT Administration of

Dadra and Nagar Haveli,

Silvassa. 

Annexure 14  

Form of Completion Certificate  

To The Authority

UT Administration of

Dadra and Nagar Haveli

Silvassa.  

Sir/Madam,  

I hereby certify that the erection/re-erection of development work of building/part building in plot No................. of ...............................zone situated at ..................................... has been supervised by me and has been completed on............................................. according to the Plan sanctioned vide office Order No............................dated...................................

The work has been completed to my full satisfaction.  The workmanship and all materials (type and grade) have been used strictly in accordance with general and detailed specifications as specified in the Development Control Regulations 2009.  No provisions of the Act or the Building Bye-laws, no requisitions made, conditions prescribed or orders issued there under have been transgressed in the course of the work.  I am enclosing three copies of the completion plans, one of which is cloth mounted.  The building is now fit for occupancy, for which it has been erected/re-erected or altered, constructed and enlarged.  
I have to request you to arrange for the inspection and give permission for occupation of the said building.  

Name & Signature of Licensed Architect .....................................

License No. of Architect & Validity ...........................................

Address of Licensed Architect .........................
Name & Signature of Licensed Structural Engineer...................................

License No. of Structural Engineer & Validity.....................................

Address of Licensed Structural Engineer................................... 

Dated: .................................

Annexure 15  

Form of Structural Stability Certificate (In letter head)  

This is to certify that, I had been appointed as the Structural Engineer for the building located at................................. village, Survey /Plot No................................. admeasuring a plot area of ............................... sqm.  The said building had the plan approved from the competent authority vide order No.............................. dated ......................... and I have examined the various parts including the building foundation and I am of the opinion that the building has been constructed in accordance with the plan approved by the authority and I further certify that the building can withstand any natural hazard since the ISI guidelines and the NBC guidelines have been strictly followed while the construction of the building. Its stability will not be endangered by its use for which the permission has been granted.     

Name & Signature of Licensed Structural Engineer..............................

License No. of Structural Engineer & Validity ..................................................

Address of Licensed Structural Engineer .......................................... 

Dated.....................................

Annexure 16

Occupancy Certificate 

To ......................................

Sir/Madam  

This is to certify that the construction work of Residential/ Residential Cum-Commercial/ Commercial /Factory Building Ground Floor .........................................sq.m; First floor ............................ Sq.m.; Second Floor .............................. Sq.m. of M/S........................................ on Survey No...................................... village ........................., of village ......................... the construction permission of which was granted vide order ......................... Dtd……../……./…… has been inspected by me and found to be completed with a built area on the Ground Floor of .............................. Sqm ; First floor of .......................... sqm ; Second Floor of ......................sqm ; Third Floor of . sq.m;  as per the approved plan with/without modifications.  This was completed under the supervision of................................... Licensed  Architect /Structural Engineer having License No..........................presently valid upto ...........................................and certified that the said Residential, Residential –Cum –Commercial /Commercial /Factory Building admeasuring a built area on the Ground Floor with......................... sqm;  Third Floor with constructed as per the approved plan is now fit for occupation.  This occupancy certificate is issued after No Objection Certificate from Station Fire Officer Silvassa, vide his letter .......................... dated ...........................................subject to condition that the firm is required to obtain the certificate in regard to the satisfactory maintenance of all the First Aid Fire fighting arrangements being made in the premises Annually. Date:  Verified & Inspected

Junior Engineer, Silvassa  

Authority TCPD,

Dadra and Nagar Haveli,

Silvassa. 

Annexure 17  

Form of Indemnity for Part –Occupancy Certificate (In Stamp Paper of Value of Rs.20/- only)  

To The Authority,

UT Administration of

Dadra and Nagar Haveli

Silvassa.   

Sir/Madam,  

While thanking you to allow me to occupy a portion of the above building before acceptance of the Completion Certificate of the whole building for the plans approved under Office Order No.............................................. Dated: .......................................... I hereby indemnify the Administration of Dadra and Nagar Haveli, against any risk, damage and danger such may occur to occupants and users of the said portion of the building and also undertake to take necessary security measures for their safety.  We say that this undertaking will be binding on me/us, our heirs, and administrator and to our assignees.   

Yours faithfully,  

OWNER 

Annexure 18  
penalty rates for regularizing various deviations during construction from the approved building plans 

S.
No.
Type Penalty (in Rs) per Sq.ft. Remarks
    For        Residential Building       where
Deemed        Bldg., Permission        has
been obtained
For all other Buildings  
1. Construction               started
/completed  before  applying
for         permission.         For Industrial 
For Others including Mixed uses

--

--

30/-

60/-

Applicable to the total built area within the plot
2. Construction               started
/completed  before  granting permission  but  had  applied for permission. 
For Industrial For Others including Mixed
uses

--

--

20/-

40/-

Applicable to the total built area within the plot.
3. Minor   Deviation  from  the approved  construction  plan, but within the D.C.Rules.

Approvable without penalty

while issuing occupancy certificate.

Approvable withoutpenalty

while issuing ocupancy cerigicate

Deviation   in   this   respect would  be  only  for  minor alteration/minor   Deviation means,  change  in  location of         Kitchen,         Toilet Staircase,   Height   of   the, Staircase,   Height   of   the floor and dimensions of the Rooms       provided       the overall built-up area  is  not exceeding    the    approved building   plan   &   internal changes only.
4. Deviation      in      Ground Coverage/ F.S.I.
Up      to      15%      of      the
    Applicable  to  the  portion
  permissible               Ground Coverage on all floors.
For Industrial For Other uses
Building       for       Deemed Provision
--
-- 500/-
100/-
300/-
--
which    is    Observed    as deviation         from         the Approved Plan.
5. Deviation in Setbacks      
  a.  Front Setback Not allowed Not allowed Total Demolition
  b.  Setback in all other sides      
  For Industrial -- 120/- Up to 5%of the permissible
set back
  For Other uses -- 300/-  
  Building       for       Deemed Provision 500/- -- Up      to      5%      of      the permissible set back
        Up      to      5%      of      the
permissible set back

Annexure 19  
Service /Light Industries which can be allowed as per the uses in Rule 24.1.6 &  24.1.8 and conditions governing such uses.  

Sr.
No.
Category of
Industry
Service Industry permitted subject to  
    Maximum Permissible Power
(in KW.)
Maximum Permissible employment Maximum Permissible Floor
Area Sq.mt.
Special conditions, If any.
1 2 3 4 5 6
I Food Product:- Groundnut
Decorticates.
7.5 9 50 -   Fuel   used   shall   be electricity,       gas       or smokeless fuel.
-   No   floor   above   the furnace portion.
-    Where  only  electric over      is      used,      an additional  heating  load of   24   KVA   permitted per establishment.
  Grain        mill        for
production of flour
7.5 9 50
  Manufacture           of
supari    and    masala grinding
7.5 9 50
  Manufacture           of
bakery products
10 25 250
  Coffee             curing,
roasting                 and grinding.
7.5 9 50
  Manufacture of ice 75.0 9 250  
  Manufacture  of  milk
and dairy products.
7.5 9 50
  Manufacture  of  ice-
cream and ice-candy
7.5 9 50  
II Tobacco:-
Manufacture of bidis
No  power  to be used No limit 250  
III Textile   and   Textile Products:- Embroidery          and making     of     crepe laces and fringes.
Manufacture           of
3.75 9 50  
1 2 3 4 5 6
  textile goods, such as wearing        apparel,, curtains,     mosquito- net,           mattresses,
bedding        material, pillow  cases,  textile bags.
Mattress  making and cotton cleaning
2.35
2.25
9
9
50
50
 
IV Wood   Product   and
Furnitures
       
  Manufacture           of wooden furniture and
fixtures.
2.75 9 50  
  Manufacture           of wooden furniture and
fixtures
2.25 9 50 Not  permitted  under  or adjoining    a    dwelling
unit.
V Printing                and Publishing Periodicals,     books, journals    at    lasses, maps,        envelopes,
picture       post-cards
and embossing.
7.5 9 120 Not  permitted  under  of adjoining    a    dwelling unit.
  Engraving     etching, block-making etc. 7.5 9 120 Manufacture with paper pulp not permitted.
No      restrictions      on power,      number      of employees,      area     or hours of operation shall apply,   if   located   in   a building  on  a  separate plot  not  less  than  500 Sq.mtr   in   area   and   if special   permission    of
the        Authority        is
  Block binding 7.5 9 120  
VI Leather         Products excluding     Tanning Manufacture           of leather footwear 3.75 9 50
  Manufacture           of
wearing  apparel  like coat, gloves.
3.75 9 50 Manufacture  of  leather of    leather    processing not permitted.
  Manufacture           of leather        consumer goods,       such       as upholstery, suitcases, pocket              books, cigarette     and     key cases, purses. 3.75 9 50
  Repair   of   footwear and     other     leather
products
3.75 9 50
  Manufacture           of rubber          balloons, hand-gloves         and allied products 1.5 9 50
VIII Metal Products :- Tool  Sharpening and razor         sharpening
works.
0.75 9 25
  Umbrella
Assembly works
0.75 9 50  
IX Electrical Goods:- Repairs of household electrical  appliances, such as radio and TV sets,    tape-recorders, video,  heaters,  irons,
shavers,         vacuum cleaner,   Fridge,   air- conditioners, washing     machines, electric          cooking
ranges,              motor
rewinding works.
2.25 9 50  
  Electronic     industry of assembly type 3.75 9 50 No      spray      painting permitted.
X Transport Equipment
–  Servicing of motor vehicles & cycles.
3.75 9 100 Only      permitted      on ground floor.
  Repair      of      motor vehicles & cycles 3.75 9 100 No      spray      painting permitted.     No     floor
above.
  Battery charging and repairs 5.0 6 25 No      spray      painting
permitted.     No     floor above.
XI Manufacture           of
jewelry   and   related articles
2.25 9 50  
  Repairs  of   watches,
clocks and jewelry
2.25 9 50  
  Manufacture           of musical   instruments
and their repairs
2.25 9 50  
  Repairs     of     locks, stoves,       umbrellas, sewing       machines, gas-burners,  &  other
Sunday equipment.
2.25 9 50  
  Optical               glass
grinding and repairs
2.25 9 50  
  Audio              taping, recording                 &
manufacture            of
equipment    for    the same   and   recording
studio
4.0 9 50  
  Photo-processing labs            Xeroxing, photocopying, videotaping and their
laboratories.
3.75 9 50  
  Re-packing           and mixing    of    liquids, powder,   pastes,   etc. not    involving    any chemical      reaction,
which        is        non- hazardous in nature.
2.25 9 50  
  Diamond cutting and
polishing
15.0 30 120  

Annexure 20  

Application Form for Permit to erect, re-erect or alter in Advertising Sign (in Rs. two stamp paper)  

To The Authority

UT Administration of

Dadra and Nagar Haveli

Silvassa.  

Sub:Notice for permission to display advertisement as required under Advertisement Bye-laws.  

Sir/Madam,  

I/WE intend to display advertisement on behalf of .....................................................................in Dadra & Nagar Haveli, Union Territory as per description /matter enclosed.  My/our particulars are as under:-  

1. Name of the Applicant   (IN BLOCK LETTERS)  

2. Name of the Company /Firm  

3. Status/Designation of Applicant  (In the Firm /Company)  

4. Permanent Address  

5. Present Address  

6. Telephone No. (If any):  Office:  

Residence:  (In case of Company /Firm authority letter in favour of the applicant may also be enclosed)  

7. Description of site at which the Advertisement is intended to be displaced along with a site plan.  

8. Size of the Advertisement to be displayed. 

9. Date from which the advertisement is intended to be displayed.

10. Documents enclosed as per checklist detailed below.  

(i) Copy of allotment letter (from allotting authority)

(ii) Copy of matter / advertisement to be displayed

(iii) Details of Materials used for different parts

 (iv) Electrical & lighting details if an

 (v) Structural details showing also supporting frame and anchorage

(vi) Mode of operation if applicable

(vii) Copy of license or registration to undertake display of advertisements with the Corporation or any other competent authority.  

11. I/We Certify that:  

(i) I/We are registered as licensed advertiser with the Administration and our license is valid up to ..........................................

(ii) The display of advertisement does not contravene any of the provision of the law and the bye-laws made thereunder.  The relevant provision of the Bye-laws have been read and understood and I/We will abide by the same.  

(iii) I/We undertake to pay all the taxes, charges, rates etc. as per the provision of the Act.  

12. I/We undertake the responsibility for any injury or damage caused to or suffered by any person or property arising out of or relating to the display of advertisement and the consequential claim or claims shall be borne by me/us and I/We will also indemnify and safeguard the Administration and keep Administration indemnified for the losses, damages, claims etc. in respect of aforesaid claim(s).     
Name and address of the applicant ......................................................

Name and address of the owner of the building /premises ...........................................................

Place: ...............................

Date:  ............................................

Annexure 21  

Application for Registering Issue of Deemed Building Permit  

To The Authority

UTAdministration of

Dadra and Nagar Haveli

Silvassa.  

Proposed building:   (Time of the work) Plot No.: Area of the Plot: Address and location of proposed building:  

Sir/Madam,  

I am currently listed as Architect on Record with the Town & Country Planning Department and I am fully conversant with the Building Byelaws of Dadra & Nagar Haveli U.T. I have been appointed as the Architect on Record of the proposed building.  I hereby certify that I have verified the design and specifications of the proposed building and certify that they comply with the Building Byelaws of Dadra & Nagar Haveli U.T.  

I have issued a Deemed Building Permit for construction of the proposed building and hereby apply for registration of the same on the records of the Town & Country Planning Department. I fully understand that in case my certificate is found to be false, or if it is found that the Deemed Building Permit issued by me is inconsistent with the Building Byelaws of Dadra & Nagar Haveli UT, the Town & Country Planning Department shall be at liberty to penalize me as deemed fit.  

Name of the AOR:.............................................

TCPD Listing No.: ...............................................

Address:  .............................................................

Tel.No. ......................................................

Signature : ................................      

Date.........................................

Annexure 22

Application for Listing as Person on Record  

To The Authority

UT Administration of

Dadra and Nagar Haveli

Silvassa.  

1. Name

2. Local Address:

3. Permanent Address:

4. Telephone / Fax No.:

5. Membership of Professional:  Associations............................................ (Indicate appropriate professional affiliations)  

6. Experience (No. of years):

7. Previous year’s Listing No.:  

Sir/Madam,  

Kindly list me as ............................ Architect /Civil Engineer on Record of the Town Planning Department.  I meet with the minimum qualifications and competence requirements and the relevant documents as attested by a Gazetted officer are attached herewith.  

I  hereby undertake to abide by all rules, regulations, standing orders, requisitions and instructions given by the Town & Country Planning Department and shall carry out my responsibilities as prescribed in the Building Byelaws of Dadra & Nagar Haveli.  I also understand that if I fail to perform my responsibilities as above, the Town & Country Planning Department reserves the right to de-list me, and take other appropriate action as deemed fit.   

Signature.....................................:  

Date: ........................................

Annexure 23

Minimum Qualification and Experience Requirements for Being Considered for Listing with the Town & Country Planning Department & Planning Development Authority as Persons on Record  

The following procedure for listing persons with Town & Country Planning Department & Planning & Development Authority has to be followed.  The listing shall be valid for one calendar year after which it shall be renewed annually.  The following are the minimum qualifications and experience requirements for all persons to be considered for listing with Town & Country Planning Department & Planning & Development Authority as Persons on Record, in order to determine their competence to fulfill their responsibilities.  

1. Architect on Record (AOR)  

 Minimum qualifications and experience requirements for architects for being considered for listing with the Town & Country Planning Department & Planning & Development Authority as Architects on Record shall be as follows:   
(i) The Architect must hold a valid registration with the Council of Architecture, India, issued as per the provisions of the Architects Act, 1972, and  

(ii) The Architect must have a minimum of two years of experience in practice of architecture, after having held a valid registration with the Council of Architecture, India.  

2. Civil Engineer on Record (CEOR)

Minimum qualifications and experience requirements for civil engineers, for being considered for listing with the Town & Country Planning Department and Planning & Development Authority as Civil Engineer on Record shall be as follows:  

(i) A Bachelors Degree in Civil Engineering or a Masters Degree in Civil Engineering or a qualification recognized to be their equivalent by the All India Council for Technical Education, and  

(ii) 2 years of experience of preparing building designs and detailed drawings and also having a valid registration with the Institute of Engineers. 

Annexure 24

GUIDELINES FOR DEVELOPMENT OF HOLIDAY RESORTS/ HOMES (Refer Rule 24.1.11.b(i) and 24.1.12)  

1. The minimum area of the land for Holiday resorts or holiday homes shall not be less than 1.00Ha and for Education or Medical Department shall not be less than 3.00Ha.  

2. The entire shall vest in single ownership. It shall not be sub-divided at any time, the individual structures or building shall not be sold to different persons.

3. The facilities provided shall be used by the purpose it has been allotted. The structures shall not be used for regular and permanent residence.

4. The adequate infrastructure facilities such as access road, water supply, liquid and solid waste collection and disposal facilities shall be provided by the owner at his own cost. So as to keep the entire area clean and hygienic. 5. The structures shall not be more than Ground + 2 upper floor. However, ground storied structures with sloping roofs constructed as far as possible out of local material, compatible with the surrounding environment would be preferred.

6. Existing trees shall be preserved and if any trees are cut, five times the number shall be planted and grown to their full height.  In addition 15 trees per 1000sq.mt of open land shall be planted as a part of the landscaping of the area.

7. the owner of the land shall be submit to Government a suitable layout of the site, landscape plan, building plans and a project report along with the recommendation from the Tourism Development Department, Dadra and Nagar Haveli if it is from the use specified in Section 24.6.1b(i) and from the Education or Medical Department if it is the use specified in Section 24.7.1

8. The entire construction/ development programme shall be completed within a period of 3years from the date of grant of development permission failing which the development permission shall automatically lapse

9. Necessary setbacks shall be provided from the classified roads

10. The total built up area of all types of structures shall not exceed 50% of the total area i.e, (FSI 0.5) of the land under development. The coverage area shall be 15% of the Gross area of the plot.   

*****