ANNEXURES



Annexure-A

Occupancy Categorization of Buildings for Water and Other Requirement for Fire Fighting 

Zone-II  Zone-II  Zone-III 
GROUP ‘A’: RESIDENTIAL GROUP ‘A’: RESIDENTIAL GROUP ‘A’: RESIDENTIAL

A1    Lodging and Rooming House

A2    One or two family private

A3    Dormitories

A4    Apartment Houses 

A5    Hotels 

F2     shops and stores,e.t.c above 500 Sq.m. floor area

F3     Underground shopping           Centers

GROUP ‘B’ :  EDUCATIONAL  GROUP ‘G’ : INDUSTRIAL  GROUP ‘G’ : INDUSTRIAL 
B1 Schools up to higher secondary level  C1 Hospitals and Sanitaria (More than 100 beds) G3   High hazard Industries

GROUP’C’ INSTITUTIONAL  

C1 Hospital & Sanitaria (upto 100beds)

C2  Custodial Institutions

C3  Penal& mental Institutions 

GROUP ‘D’ ASSEMBLY BUILDINGS  

D1 For more than 1000 persons with permanent stage and fixed seats

D2 For less than 1000 persons with permanent stage and fixed seats 

GROUP ‘H’ STORAGE BUILDINGS

GROUP ‘D’ ASSEMBLY BUILDINGS  

D3 Upto 300 persons without permanent stage and fixed seats

D4 Above 300 persons without permanent stage and fixed seats 

GROUP ‘E’ BUSINESS  BUILDINGS  

E1 Offices, Banks, etc.

E2 Laboratories, Libraries, etc.

E3  Telephone Exchanges 

GROUP ‘J’ HAZARDOUS BUILDINGS

GROUP ‘E’ BUSINESS  

E3  Computer Installations

E5  Broadcasting stations 

GROUP ‘F’ MERCANTILE

F1 Shops, Stores, etc. upto      500m2  floor area

 

GROUP ‘G’ INDUSTRIAL   

G1 Low hazard Industries 

GROUP ‘G’ INDUSTRIAL  

Annexure-BI

Fire Protection Requirements for Buildings in Zone-I Category 

Sl. No Measures Group-A:    Residential
A1,  A2,  A3,  A4
Group-B:
Educational
Group-C:
Institutional
O I II III I II III I II III
1 Access P P P P P P P P P P
2 Means of Escape P P P P P P P P P P
3 Compartmentation P P P P P P P P P P
4 Refuge Area X X X X X X X X X X
5 Emergency Lights X X P P P P P P P P
6 Exit  Signs P P P P P P P P P P
7 PA  System  with  Talk  Back Facility X X X X X P P P P P
8 Moefa X X X P X P P P2 P P
9 Extinguishers P P P P P P P P P P
10 Hose Reel P3 P P P P3 P P P P P
11 Yard Hydrant X X X P X P P X P P
12 Down  Comer X X X P X P X P4 X X
13 Wet  Riser X X P X X X P X P P
14 Fire  Detection System X X X X X P6 X P2 P P
15 Automatic Sprinkler
System
S S S S S S FS S S FS
16 Under Ground Tank X X X X X X P P2 P P
17 Over Head Tank P13 P P P P P P P P P
18 Fire  Pumps X X X X X X P X P P
19 Booster Pumps P3 P P P P P3 P P X P
20 Auto D.G. Set P3 X P P P3 P P P P P
21 MCB/ELCB P P P P P P P P P P
22 Hose Boxes X X X P X P P P4 P P
23 Fireman’s Grounding
Switch
P P P P P P P P P P

Fire  Protection  Requirements  for  Buildings  in  Zone-I  Category

Sl. No Measures Group-D:
Assembly   D3, D4
Group-E:
Business   E3, E5
Group-G:  Industrial  G1
I II III I II III IV V VI VII VIII
1 Access P P P P P P P P P P P
2 Means of Escape P P P P P P P P P P P
3 Compartmentation P P P P P P P P P P P
4 Refuge Area X X X X X X X X X X X
5 Emergency Lights P P P P P P P P P P P
6 Exit Signs P P P P P P X X P P P
7 PA   System   with   Talk   Back
Facility
P1 P P X P P X X X X P
8 Moefa P1 P P X P P X X P P P
9 Extinguishers P P P P P P P P P P P
10 Hose  Reel P2 P P P P P X P P P P
11 Yard Hydrant X P P X P P X X X P P
12 Down  Comer X X P P2 X X X X X X X
13 Wet Riser X P P X P P X X X P5 P
14 Fire Detection System P7 P P P2 P8 P9 X X X P P
15 Automatic Sprinkler  System S7 FS FS S S FS S S S S FS
16 Under Ground Tank P7 P P X P P X X P10 P11 P
17 Over  Head Tank P2 P P P P P P5 P P P P
18 Fire Pumps P11 P P X P P X X X P5 P
19 Booster Pumps X X X P X X P12 P P P P
20 Auto D.G. Set P7 P P P P P X X P P P
21 MCB/ELCB P P P P P P P P P P P
22 Hose  Boxes P P P P2 P P X X X P5 P
23 Fireman’s Grounding Switch P P P P P P P P P P P

Guest Houses/Lodging having up to 20 rooms or 40 beds and belowLegen

I Height less than 15 m

II Height 15 m and above up to 24 m

III Height above 24 m

IV Height less than 15 m and plot area less than 250 Sq.m

V Height less than 15 m and plot area 251 Sq.m and above up to 500 Sq.m

VI Height less than 15 m and plot area 501 Sq.m and above up to 1000 Sq.m

VII Height less than 15 m and plot area more than 1001 Sq.m

VIII Height above 15 m and up to 18 m

P To be provided.

X Not to be provided.

S Sprinklers to be provided if basement area is 200 Sq.m or more.

FS Fully Sprinkle red.

1. To be provided if seating capacity exceed 750.

2. To be provided if building is more than ground floor, first floor and total covered area exceed 1500 sq. m

3. To be provided in building where total covered area exceeds 1000 sq. m or Building is more than ground floor except group housing.

4. To be provided if building is ground floor, first floor and total covered area exceeds 300 m.

5. To be provided if building is more ground floors.

6. To be provided in building except educational buildings.

7. In case seating capacity is 1000 persons minimum or covered area above 1500Sq.m or basement area 200 Sq.m and more (other than places or worships).

8. To be provided for E-4 and E-5 buildings but not required if building is fully sprinkled.

9. To be provided for E-4 and E-5 buildings.

10. 25,000 lt. capacity underground water storage tank to be provided.

11. 50,000 lt. capacity underground water storage tank to be provided.

12. To be provided where ever sprinklers are not installed.

13. Terrace tank of 5,000 lt. capacity to be provided, if sprinklers and installed. The capacity shall be accordingly increased.  

Annexure-BII

Fire Protection Requirements for Buildings in Zone-II Category

Sl. No Measures Group-A:  Residential Group-C C2:
Hospital
Group  –  D Assembly D1,  D2,  D5
I II III IV V VI V VI
1 Access P P P P P P P P
2 Means of Escape P P P P P P P P
3 Compartmentation P P P P P P P P
4 Refuge Area X X X X X X X X
5 Emergency Lights P P P P P P P P
6 Exit Signs P P P P P P P P
7 PA System with Talk  Back Facility X P P P P P P P
8 Moefa X P P P P P P P
9 Extinguishers P P P P P P P P
10 Hose  Reel P P P P P P P P
11 Yard Hydrant X X P P X P X P
12 Down  Comer X P2 X X X X X X
13 Wet Riser X X P2 X P4 P P5 P
14 Fire Detection System X P P P P3 P P P
15 Automatic Sprinkler  System S S FS FS7 S FS S8 FS
16 Under Ground Tank X X P P P3 P P8 P
17 Over  Head Tank P P P P P P P P
18 Fire Pumps X X P P P4 P P8 P
19 Booster Pumps P P P X P X P X
20 Auto D.G. Set P P P P P P P P
21 MCB/ELCB P P1 P P P P P P
22 Hose  Boxes X P P P P4 P P P
23 Fireman’s Grounding Switch P P P P P P P P

 Fire  Protection  Requirements  for  Buildings  in  Zone-II  Category.

Sl. No Measures Group-E:
Business       E1, E2,  E4
Group-F: Mercantile Group-G.  Industrial  G2
VII VIII IX X XI XII XIII XIV XV
1 Access P P P P P P P P P
2 Means of Escape P P P P P P P P P
3 Compartmentation P P P P P P P P P
4 Refuge Area X X X X X X X X X
5 Emergency Lights P P P P X X P P P
6 Exit  Signs P P P P X X P P P
7 PA  System  with  Talk  Back Facility X P P X X X X X P
8 Moefa X P P X X X P P P
9 Extinguishers P P P P P P P P P
10 Hose Reel P P P P1 P P P P P
11 Yard Hydrant X P P X X X X P P
12 Down  Comer P3 X X X X X P4 X X
13 Wet  Riser X P P X X X X P6 P
14 Fire  Detection System P3 P P X X X X X P
15 Automatic                 Sprinkler
System
S S FS S S S S FS FS
16 Under Ground Tank X P P X X P9X P10 P P
17 Over Head Tank P P P P1 P P P P P
18 Fire  Pumps X P P X X X X P P
19 Booster Pumps P P P P1 P P P P P
20 Auto D.G. Set P P P X X P P P P
21 MCB/ELCB P P P P P P P P P
22 Hose Boxes P3 P P X X X P P P
23 Fireman’s               Grounding
Switch
P P P P P P P P P

 Legend

 I  Height less than 15 m. and area up to 300 sq. m on each floor.

II  Height less than 15 m and area above 300 sq. m up to 1000 sq. m on each floor.

III  Height less than 15 m and area above 1000 sq. m on each floor.

IV  Height 15 m and above.  

V  Height less than 15 m

 VI  Height 15 m and above up to 30 m

 VII  Height less 15 m.

 VIII  Height 15 m. and above up to 24 m.

IX  Height more than 24 m.

X  Height less than 15 m. and plot area up to 750 Sq.m

XI  Height less than 15 m. and plot area less than 250 Sq.m.

XII  Height less than 15 m. and plot area 251 m2 and above up to 500 Sq.m

XIII  Height less than 15 m. and plot area 501 m2 and above up to 1000 Sq.m.

XIV  Height less than 15 m. and plot area more than 1001 Sq.m

XV  Height above 15 m. and up to 18 m.

P  to be provided

X  not to be provided

S  Sprinklers to be provided if basement area is 200 m2 or more

FS  Fully Sprinkle red.  

1. To be provided if building is more than one floor.

2. To be provided in buildings above two floors.

3. To be provided if the building is more than ground floor, first floor and covered area exceeds 1500 Sq.m

4. To be provided if building is more than first floor and the covered area exceeds 300 Sq.m

5. To be provided for more than storeyed buildings and above.

6. To be provided if building is ground floor, first floor and above.

7. Buildings to be fully sprinkled if height exceeds 15 m. 

8. To be provided if seating capacity exceeds 1000 persons.

9. 25,000 lt. capacity underground tank to be provided.

10. 50,000 lt. capacity a ground tank to be provided if riser is not provided.  

Annexure-BIII

Fire Protection Requirements for buildings in Zone-III Category 

Sl. N O Measures Group F mercantile
(F2, F3)
Group  G
Industrial (G3)
Group H
Storage
Group
Hazardous
H<15
m A>750
Sq.m
H>15
m
UG S I II III IV H<15
m Single Storey
H<15
m More than
one Storey
H<15
m Single Storey
H<15
m More than
one Storey
1 Access P P P P P P P P P P P
2 Means of Escape P P P P P P P P P P P
3 Compartmentati on P P P P P P P P P P P
4 Refuge Area X X X X X X X X X X X
5 Emergency
Lights
P P P X P P P X P P P
6 Exit Signs P P P X P P P X P P P
7 PA   System   with Talk                 Back
Facility
P1 P P X X X X X X P P
8 Moefa P1 P P X X X P X X P P
9 Extinguishers P P P P P P P P P P P
10 Hose  Reel P P P P P P P P P P P
11 Yard Hydrant P P P X X P P P2 P2 P P
12 Down  Comer X X X X X X X X X X X
13 Wet Riser P1 P P X X P
3
P
1
X P3 X X
14 Fire        Detection
System
X P P X X P P X X P P
15 Automatic Sprinkler
System
FS FS FS F S F S F S F S FS4 FS FS FS
16 Under       Ground
Tank
P P P P
5
P
6
P
7
P P6 P P P
17 Over  Head Tank P P X P P P P P P X P
18 Fire Pumps P P P P P P P P4 P P P
19 Booster Pumps X X X X X X X X X X X
20 Auto D.G. Set P P P P P P P P P P P
21 MCB/ELCB P P P P P P P P P P P
22 Hose  Boxes P1 P P X P P P X P3 P P
23 Fireman’s
Grounding Switch in Lifts
P P P P P P P X P X P


 U.G.S.  Under Ground Shopping complexLegend

i) Height less 15 m. shopping complex

ii) Height less 15 m. and plot area 251 Sq.m and above up to 500 Sq.m

iii) Height less 15 m. and plot area 501 Sq.m. and above up to 1000 Sq.m.

iv) Height less 15 m. and plot area more than 1001 Sq.m.

P  To be provided.

X  Not to be provided.

S  Sprinklers to be provided if basement area is 200 Sq.m or more.

FS  Fully Sprinkle red.

1. To be provided if building is more than one floor.

2. To be provided in buildings above two floors. 

3. To be provided if the building is more than ground floor, first floor and covered area exceeds 1500 Sq.m

4. To be provided if building is more than first floor and the covered area exceeds 300 Sq.m

5. To be provided for more than storeyed buildings and above.

6. To be provided if building is ground floor, first floor and above.

7. Buildings to be fully sprinkled if height exceeds 15 m.

8. To be provided if seating capacity exceeds 1000 persons.

9. 25,000 lt. capacity underground tank to be provided.

10. 50,000 lt. capacity a ground tank to be provided if riser is not provided.  

Annexure-C

1. Water Requirement Criterion: Unless otherwise specified in Annexure B, water requirement for fighting in different categories of occupancies shall be based on following. 

Occupancy Category  Sprinkler Design Discharge Density (lt./min/Sq.m.)  Sprinkler Design Area (Sq.m.)  Max. area coverage/ Sprinkler (Sq.m.) No.of House Streams* Fully other Sprinkled Duration of Discharge (Min.)  
Fully Sprinkled  Wet Riser Sprinkle
LEVEL I 02.5 084 21 24 45 45
LEVEL II 05.0 360 12 36 60 90
LEVEL III 10.0 225 09 36 90 90

Note: The discharge through a standard hose stream shall be taken as 567 lt./min.

2. Estimation of Total Water Requirements Fully Sprinkle red Buildings

Occupancy Category Sprinkler(lt.) Riser(lt.) Total(lt.) Wet Riser cum Down Comer (lt.)
LEVEL I 9450 51030

60,480

(60,000)

1,02,060

(1,00,000)

LEVEL II 1,08,000 1,02,060

2,10,060

(2,00,000)

2,04,120

(2,00,000)

LEVEL III 2,02,500 1,02,060

3,04,560

(3,00,000)

3,06,180

(3,00,000)

3. Water Storage Tanks
1. The design of the water storage tanks shall be as laid down in National Building Code of India.

2. The capacity of underground water storage tank shall not be more than85% of the total water requirement.

3. The capacity of overhead tank shall not be less than 15% of the total water requirement.

4. The entire water requirement can be provided in overhead tanks and pumping requirements shall be finalized in consultation with Chie Fire Officer.

5. Under ground water storage tank shall not be provided in the set back areas. 

Occupancy Category  Under Ground Static Tank Over Head Tank
Fully Sp kd. (lt.) Riser (lt.) Fully Spkd.(lt.) Riser(lt.) 
LEVEL I 50,000 85,000 10,000 15,000
LEVEL II 1,70,000 1,70,000 30,000 30,000
LEVEL III 2,50,000 2,50,000 50,000 50,000

4. Riser/Down comer
1. The size of the riser/ down comer shall be such that velocity of flow does not exceed 5 m/second subject to a minimum of 100 mm. diameter.

2. The number of riser/down comer shall be calculated on the basis that if 30 m. of delivery hose is laid, it reaches the farthest comer of the remotest compartment on the floor.

3. The riser/down comer shall be provided in the staircase/staircase lobby in such a manner that it does not obstruct the means of escape.

4. Only single headed hydrants shall be used on the riser/down comer.

5. The size of hose to be provided with the internal hydrants shall be 50mmdiameter and with 63 mm diameter instantaneous male/female couplings.

6. Diffuser branch shall only be provided in the hose boxes.

7. In case of partially sprinkle red building tapping from the wet riser is permitted for sprinkler feed.

8. In case of fully sprinkle red building separate rising mains and pumps shall bemused for sprinkler system and wet riser. 

5. Selection of Pumps

1. Pumping requirement shall be met by a single pump or combination of pumps.

2. If more than one pump is installed to meet the pumping requirement they shall be so arranged that they come into operation one after another depending upon fall in pressure in the mains and the combined pumping capacity shall be 20% more than the actual pumping capacity needed.

3. Jockey pump shall be selected to give minimum 3% and maximum 5% of aggregate pumping requirement at the same pressure to that of the main pump subject to maximum discharge of 450 LPM.

4. Standard pumps shall only be used having discharge capacity as 180LPM, 2280LPM 2850 LPM & 4550 LPM.

5. The pump shall be capable of giving the pressure as shown in the table below: 

Occupancy Category  Pressure* At Terrace Level
Fully Spkd. (Kgf./Cm2) Riser (Kgf./Cm2)
LEVEL I 3.5 3.5
LEVEL II 3.5 5.5
LEVEL III 3.5 7.0

* Orifice plates shall be installed at the hydrants on rising mains / yard hydrants to ensure that the pressure does not exceed 7 Kgf./Cm2

Annexure-D

Questionnaire for High Rise Buildings/Other Buildings

Fire Service Headquarters

1. Name of the building ………………………………………………………..

2. Address of the building………………………………………………………

3. Name and address of builder/promoter………………………….…………..

4. Name and address of owners /occupiers of individual flats ………………..

5. Plot area ………………………………………………………………………………..…

(a) Title ……………………………………………………………………………

(b) Land use (in case of residential building indicate no. of dwelling units……………………………………………………………………..………

6. Covered Area (at grade level) ……………………………………………………..

7. Height of tile building………………………………………………………………

8. a) Overall height (from grade level up to terrace level ) …………………………..

9. b) Whether set back areas are conforming to unified building byelaws…………………………………………………………………………………

c) Area of the basement …………………………………………………………...

d) Whether any piazza is proposed? if so, details of the level of piazza and ramp etc. be indicated …………………………………………………………………..

10. Number of floors (including ground floor) ………………………………………

11. Occupancy use (please mention separately, use for basement and floors) …………………………………………………………………………………..…

12. Covered area of typical floor ………………………………………………………

13. Parking areas (please give details) ……………………………………………........

14. Details of surrounding properties / features

Compass direction In relation to the building  Type of Property/ feature  Height in case of building  Distance wall to wall from building  Any other information 
North        
South        
East        
West        

15. Approach to proposed building width of the road and connecting roads, if any…………………………………………..………………………………………………

16. Please give details of water supply available exclusively for the fire fighting …………………………………………………………………………………………

17. Has wet riser(s) been provided? If so, please indicate the number of risers and internal dia of each ………………………………….…………………………………..

18. Has any down comer been provided? If so, please give details including pump capacity…………………………………………………………………..…………… 

19. Please indicate the present arrangement for replenishment of water for fire fighting……………………….………………………………………………………

20. Is a public or other water storage facility available nearby? if so, please give the capacity and distance from your building, also please indicate if it is easily accessible………………………………………………..………..…………………..

21. Please give any other information regarding availability of water supply for fire fighting…....………………………………………………………………………

22. Have internal hydrants on each floor including basement (s) and terrace.

a) No. of hydrants on each floor including basement (s) and terrace …………

b) Bore and length of each floor including basement(s) …………….……….…...

c) Size (bore) and type of nozzle fitted to each hose reel……...………….………

d) Is the hose reel connected directly to the riser or to the hydrant outlet? …………………………………….……………………………………………

23. Has fire hose been provided near each hydrant? if so, Please indicate ……………….

a) The type hoses…………………………………………………………………..

b) The size (bore) of hose …………………………………………………………

c) The length of each hose ………………………………………..……………….

24. Have branch pipes been provided? if so, please indicate

a) The type of branch pipe…………………………………………………………

b) Size of nozzle fitted to each branch……………………………………………..

25 a) If the basement is used for Car / Scooter parking or storage. Has it been sprinkled?………………………………….……………… ……….

b) Whether any cubicles proposed in the basement? If so, the area of each cubical be indicated? ……………………….…………………….……………………...

c) Whether segregation/compartmentation of the basement has been provided? If so, please give details………………………………………….…………………

26. Is the building equipped with automatic fire detection and alarm system? If so, please indicate

a) The type of detectors used ………………………………………………………

b) The standard to which the detectors conform …………………………………..

c) The code to which the installation conform ……………………………………

27. Have manual call boxes been installed in the building for raising an alarm in the event of outbreak of fire? If so, please give details………………………………

28. Has public address system been installed in the building with loudspeaker on each floor with talk back facility………………………………………………………

29. Has an intercom system been provided between the various floors and the fire control room in entrance lobby? ………………………………………………………

30. Has a fire control room been provided in the entrance lobby of the building? …………………………………………………………………………

31. How many staircases have been provided in the building? Please indicate in each case: -

a) Width of the stairway……………………………………………………..……

b) Width of treads…………………………………………………………………

c) Height of risers …………………………………………………………………

d) If the treads are of the non-slip type……………………………………………

32. What is the average occupant load per floor?………………………………………

33. Whether fire tower has been proposed? …………………………………………….

34. How many lifts have been installed in the building? Please indicate in each case:

a) The floors between which the lifts runs…………………………………..……

b) The type of doors fitted to the lift Car and at each landing……………………

c) Fire resistance raring of lift Car and landing doors, if known …….………….

d) Floor area of the lift car……………………………………………………..…

e) Loading capacity of the lift car ………………………………………….……

f) Has communication system been installed in the lift car? ……………………

g) Has a fireman’s switch been installed in the lift for grounding it in the event of fire ……….……………………………………………………………………

35. Have any stationary fire pump (s) been installed or pressuring the wet riser? If so, please indicate.

a) The number of pumps……………..…………………….……………………

b) The size of suction and delivery connection of each pump …….……………

c) The output of each pump ………………………………………….…………

36. Has the building been protected with sprinkler system, If so, detail of sprinkler pump…………….……………………………………………….………….……… 

37. Has a standby source of power supply been provided? If it is through a generator, please indicate.

a) The capacity (output) ………………………..………………………………

b) The functions that can be maintained simultaneously by the use of the Generator, such as operating lift(s); fire pumps, emergency lighting etc. system; exit signs; PA system etc. …………………………………………

c) Is the generator automatic in action or has to be started manually?……….…

38. Has any Yard hydrant been provided from the building’s fire pump? ……………..

39. Where more than one lifts are installed in a common enclosure have individual lifts been separated by fire resisting walls or 2 hours fire rating? ………………………

40. Has the lift shaft(s) lift lobby or stairwell been pressurized? If so, give details……………………………………………………………………….………

41. Has the lift lobbies and staircase been effectively enclosed to prevent fire/smoke entering them from outside at any floor? ……………………………………………

42. Have all exits and direction of travel to each exit been sign-posted with illuminated signs? ………………………………………………………………………… …..…

43. Has a false ceiling been provided in any portion of the building? If so, please indicate location and also mention if the material used for the false ceiling is combustible or non-combustible ………………………………… …………………………………… 44. Is the building centrally air-conditioned? if so, please indicate:

a) The material used for construction of ducts and its fittings……………….…

b) The type of lining used for ducts, if any………………………….………..…

c) The type of lagging used for ducts, if any for insulating any portion of the duct; please also indicate how the lagging is secured………………………

d) If plenum is used for return air passage has it been protected with fire detectors? Please give details…………………………………………………

e) Has a separate A.H.U. been provided for each floor?

f) Whether automatic shutdown of A. H. U. is coupled with detection system /sprinkler system…………………………………………………

g) Is the ducting for each floor effectively isolated or is it continuous on more than one floor? …………………………………………………………….…

h) Are the fire dampers being provided?……………………………………..…

45. Where are the switchgear and transformer located? If inside the building please indicate: ……………………………………………….………………………………

a) If the switchgear and transformer (s) have been housed in separate compartments, effectively separated from each other and other portions of the building by a four-hour’s fire resistive wall? ………………………………

b) What precautions have been taken to prevent a possible fire in the transformer (s) from spreading? ……………………………………………….

c) Are transformer protected by high velocity water spray system………………..

46 I) Where electrical cables, telephone cables wet risers / down comers pass-through a floor or wall has the spaces (apertures) round the cables /pipes been effectively sealed/plugged with noncombustible, fire resistance material?…………………..……………………………………………………

II) Ventilation

a) Whether natural ventilation is relied upon? If so, give details of the vents for the stairwell life shafts…………………………………………………….......

b) Whether mechanical ventilation has been proposed? If so, give details of the proposed system indicating the number of air changes for the basement and other floors ……………….……………………………………………..…

c) Whether mechanical ventilation is coupled with automatic detection system/sprinkler system? Please give details of the system………………..…

47. Please indicate the number and type of fire extinguishers provided at various locations and the arrangement for the maintenance of the extinguishers ……………………….…………………………………………..……………………

48. Please indicate if all fire extinguishers bear the BIS mark……………………………

49. Whether the refugee area has been provided? If so, the floor on which provided and the total area provided floor-wise………………………………………….…………

50. Are the occupants of the building systematically trained in fire prevention, use of fire extinguishers and emergency procedures? If so, please give details………………………………………….……………….………………………

51. Does an emergency organization exist in the building? If so, please give details and append a copy of the emergency (fire) orders………………………………..……… 

52. Has a qualified officer been appointed for the building either individually or jointly with other building(s)…………………………………………………………………

53. Has the building been protected against lighting? If so, does the lighting protection conform to any code? Please indicate details provision of MCB and ELCB in the building………………………………………………………………………  

54. The work has not been started on site and construction will be started only after final approval of the Authority / the position of construction at site is given below:

…………..…………………………………………………………………………

Name and address of the consultant with Registration No…………………………………

Owner’s Signatures Signature of the Applicant / Architect /Engineer

Name………………………………… Name……………………………….………

(In block letters)                                    (In block letters)

Designation…………………………………

Organization………………………..………

Signature of Fire Consultant

Dated:

Name……………………………….. (In block letters)

Remark of the concerned Authority. The proposal has been broadly examined. The above information is correct and the proposal is permissible as far as development Authority is concerned (Additional comments, if any, may be given below or attached):  

The proposal can be considered by Fire Services at conceptual stage/is forwarded to Fire Service along with 3 sets of drawings which are according to bye-laws, Master Plan, Zonal Plan, and firefighting regulations and policy instructions of Government. The proposal involves relaxation in respect of height/set-backs/ ………………………The Architect/Engineer has been advised to furnish the requisite material and documents given in the attached list, within one week time directly to the Fire Service.

Signature of Authority

Name:

Designation and office Seal: 

*****