4.4.11 600 mm width X 62.5 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2791

MS perforated cable tray Cross member 600 X 62.5 X 2 mm

each

1.00

2060.00

2060.00

2727

MS perforated cable tray Connector 600 X 62.5 X 2 mm

each

1.00

61.00

61.00

2805

35 mm X 35 mm X 4 mm angle iron = 1 X 0.65m =0.65 @ 2.09kg/m = 1.36kg

kg

1.36

33.00

44.88

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2802

MS Suspender 8 mm dia 0.75m long 

each

2.00

28.00

56.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

2241.48

 

Cartage @ 1 % of A1

 

 

 

22.41

LABOUR

1005

Fitter, Grade 2

day

0.08

612.00

48.96

1010

Mason, Grade 2

day

0.08

612.00

48.96

1007

Khallasi

day

0.16

553.00

88.48

 

TOTAL

 

 

 

2450.29

 

Add 12% GST (MF = 0.1405)

 

 

 

344.27

 

TOTAL

 

 

 

2794.56

 

OVERHEADS & PROFIT @ 15 %

 

 

 

419.18

 

TOTAL

 

 

 

3213.74

 

Rate per Each

 

 

 

3213.74

 

Say

 

 

 

3214.00

4.4.12750 mm width X 62.5 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2792

MS perforated cable tray Cross member 750 X 62.5 X 2 mm

each

1.00

2552.00

2552.00

2728

MS perforated cable tray Connector 750 X 62.5 X 2 mm

each

1.00

67.00

67.00

2805

35 mm X 35 mm X 4 mm angle iron = 1 X 0.8m =0.8 @2.09kg/m = 1.67kg

kg

1.67

33.00

55.11

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2802

MS Suspender 8 mm dia 0.75m long

each

2.00

28.00

56.00

2936

Painting with primer and finish paint 5.00

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

2749.71

 

Cartage @ 1 % of A1

 

 

 

27.50

LABOUR

1005

Fitter, Grade 2

day

0.08

612.00

48.96

1010

Mason, Grade 2

day

0.08

612.00

48.96

1007

Khallasi

day

0.16

553.00

88.48

 

TOTAL

 

 

 

2963.61

 

Add 12% GST (MF = 0.1405)

 

 

 

416.39

 

TOTAL

 

 

 

3379.99

 

OVERHEADS & PROFIT @ 15 %

 

 

 

507.00

 

TOTAL

 

 

 

3886.99

 

Rate per Each

 

 

 

3886.99

 

Say

 

 

 

3887.00

4.4.13900 mm width X 62.5 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2793

 MS perforated cable tray Cross member 900 X 62.5 X 2 mm

each

1.00

2986.00

2986.00

2729

MS perforated cable tray Connector 900 X 62.5 X 2 mm

each

1.00

71.00

71.00

2805

35 mm X 35 mm X 4 mm angle iron = 1 X 0.95m =0.95 @2.59kg/m = 2.46kg

kg

2.46

33.00

81.18

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2802

MS Suspender 8 mm dia 0.75m long

each

2.00

28.00

56.00

2936

Painting with primer and finish paint.

L.S

1.00

5.00

5.00

 

Total cost of materials

 

 

 

3213.78

 

Cartage @ 1 % of A1

 

 

 

32.14

LABOUR

1005

 Fitter, Grade 2

day

0.08

612.00

48.96

1010

Mason, Grade 2

day

0.08

612.00

48.96

1007

Khallasi

day

0.16

553.00

88.48

 

TOTAL 

 

 

 

3432.32

 

Add 12% GST (MF = 0.1405)

 

 

 

482.24

 

TOTA L

 

 

 

3914.56

 

OVERHEADS & PROFIT @ 15 %

 

 

 

587.18

 

TOTAL

 

 

 

4501.74

 

Rate per Each

 

 

 

4501.74

 

Say

 

 

 

4502.00

4.4.14600 mm width X 75 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2794

MS perforated cable tray Cross member 600 X 75 X 2 mm

each

1.00

2129.00

2129.00

2727

2727 MS perforated cable tray Connector 600 X 62.5 X 2 mm

each

1.00

61.00

61.00

2806

35 mm X 35 mm X 5 mm angle iron = 1 X 0.95m =0.95 @2.59kg/m = 2.46kg

kg

2.46

33.00

81.18

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2802

MS Suspender 8 mm dia 0.75m long

each

2.00

28.00

56.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

3284.78

 

Cartage @ 1 % of A1

 

 

 

32.85

LABOUR

1005

Fitter, Grade 2

day

0.08

612.00

48.96

1010

Mason, Grade 2

day

0.08

612.00

48.96

1007

Khallasi

day

0.16

553.00

88.48

 

TOTAL

 

 

 

3504.03

 

Add 12% GST (MF = 0.1405)

 

 

 

492.32

 

TOTAL

 

 

 

3996.34

 

OVERHEADS & PROFIT @ 15 %

 

 

 

599.45

 

TOTAL

 

 

 

4595.79

 

Rate per Each

 

 

 

4595.79

 

Say

 

 

 

4596.00

4.5 Supplying and installing following size of perforated painted with powder coating M.S. cable trays Reducer with perforation not more than 17.5%, joined with connectors, suspended from the ceiling with M.S. suspenders including bolts & nuts, painting suspenders etc as required.

4.5.1 100 mm width X 50 mm depth X 1.6 mm thickness Details of cost for 1 No

2749

MS perforated cable tray Reducer 100 X 50 X 1.6 mm

each

1.00

451.00

451.00

2717

MS perforated cable tray Connector 100 X 50 X 1.6 mm

each

1.00

30.00

30.00

2804

25 mm X 25 mm X 3 mm angle iron = 1 X 0.15m =0.15 @1.11kg/m = 0.17kg

kg

0.17

33.00

5.61

2855

Steel fastener 6 mm X 75 mm

each

2.00

5.50

11.00

2801

MS Suspender 6 mm dia 0.75m long

each

2.00

23.00

46.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

548.61

 

Cartage @ 1 % of A1

 

 

 

5.49

LABOUR

1005

Fitter, Grade 2

day

0.05

612.00

30.60

1010

Mason, Grade 2

day

0.05

612.00

30.60

1007

Khallasi

day

0.10

553.00

55.30

 

TOTAL 

 

 

 

670.60

 

Add 12% GST (MF = 0.1405)

 

 

 

94.22

 

TOTAL

 

 

 

764.81

 

OVERHEADS & PROFIT @15 %

 

 

 

114.72

 

TOTAL

 

 

 

879.53

 

Rate per Each

 

 

 

879.53

 

Say

 

 

 

880.00

4.5.2 150 mm width X 50 mm depth X 1.6 mm thickness Details of cost for 1 No

2750

MS perforated cable tray Reducer 150 X 50 X 1.6 mm

each

1.00

549.00

549.00

2718

MS perforated cable tray Connector 150 X 50 X 1.6 mm

each

1.00

39.00

39.00

2804

25 mm X 25 mm X 3 mm angle iron = 0.2 @ 1.11kg/m = 0.22kg

kg

0.22

33.00

7.26

2855

Steel fastener 6 mm X 75 mm

each

2.00

5.50

11.00

2801

MS Suspender 6 mm dia 0.75m long 

each

2.00

23.00

46.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

657.26

 

Cartage @ 1 % of A1

 

 

 

6.57

LABOUR

1005

Fitter, Grade 2

day

0.05

612.00

30.60

1010

Mason, Grade 2

day

0.05

612.00

30.60

1007

Khallasi

day

0.10

553.00

55.30

 

TOTAL

 

 

 

780.33

 

Add 12% GST (MF = 0.1405)

 

 

 

109.64

 

TOTAL

 

 

 

889.97

 

OVERHEADS & PROFIT @ 15 %

 

 

 

133.50

 

TOTAL

 

 

 

1023.47

 

Rate per Each

 

 

 

1023.47

 

Say

 

 

 

1023.00

4.5.3 225 mm width X 50 mm depth X 1.6 mm thickness Details of cost for 1 No

2751

MS perforated cable tray Reducer 225 X 50 X 1.6 mm

each

1.00

727.00

727.00

2719

MS perforated cable tray Connector 225 X 50 X 1.6 mm

each

1.00

40.00

40.00

2804

25 mm X 25 mm X 3 mm angle iron = 1 X 0.25m =0.25 @1.11kg/m = 0.28kg

kg

0.28

33.00

9.24

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2801

MS Suspender 6 mm dia 0.75m long

each

2.00

23.00

46.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

841.84

 

Cartage @ 1 % of A1

 

 

 

8.42

LABOUR

1005

Fitter, Grade 2

day

0.05

612.00

30.60

1010

Mason, Grade 2

day

0.05

612.00

30.60

1007

Khallasi

day

0.10

553.00

55.30

 

TOTAL

 

 

 

966.76

 

Add 12% GST (MF = 0.1405)

 

 

 

135.83

 

TOTAL

 

 

 

1102.59

 

OVERHEADS & PROFIT @ 15 %

 

 

 

165.39

 

TOTAL

 

 

 

1267.98

 

Rate per Each

 

 

 

1267.

 

Say

 

 

 

1268.00

4.5.4 300 mm width X 50 mm depth X 1.6 mm thickness Details of cost for 1 No

MATERIALS

2752

MS perforated cable tray Reducer 300 X 50 X 1.6 mm

each

1.00

902.00

902.00

2720

MS perforated cable tray Connector 300 X 50 X 1.6 mm

each

1.00

40.00

40.00

2804

2804 25 mm X 25 mm X 3 mm angle iron = 1 X 0.35m =0.35 @1.11kg/m = 0.39kg

kg

0.39

33.00

12.87

2856

Steel fastener 8 mm X 75 mm 2.00

each

7.30

14.60

14.60

2801

MS Suspender 6 mm dia 0.75m long

each

2.00

23.00

46.00

2936

Painting with primer and finish paint

L.S

1.00

5.00

5.00

 

Total cost of materials

 

 

 

1020.47

 

Cartage @ 1 % of A1

 

 

 

10.20

LABOUR

1005

Fitter, Grade 2

day

0.05

612.00

30.60

1010

Mason, Grade 2

day

0.05

612.00

30.60

1007

Khallasi

day

0.10

553.00

55.30

 

TOTAL

 

 

 

1147.17

 

Add 12% GST (MF = 0.1405)

 

 

 

161.18

 

TOTAL

 

 

 

1308.35

 

OVERHEADS & PROFIT @ 15 %

 

 

 

196.25

 

TOTAL

 

 

 

1504.60

 

Rate per Each

 

 

 

1504.60

 

Say

 

 

 

505.00

4.5.5 375 mm width X 50 mm depth X 2.0 mm thickness Details of cost for 1 No

2753

MS perforated cable tray Reducer 375 X 50 X 2 mm

each

1.00

1148.00

1148.00

2721

MS perforated cable tray Connector 375 X 50 X 2 mm

each

1.00

44.00

44.00

2805

35 mm X 35 mm X 4 mm angle iron = 1 X 0.425m =0.43 @2.09kg/m = 0.9kg

kg

0.90

33.00

29.70

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2801

MS Suspender 6 mm dia 0.75m long

each

2.00

23.00

46.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

1287.30

 

Cartage @ 1 % of A1

 

 

 

12.87

LABOUR

1005

Fitter, Grade 2

day

0.05

612.00

30.60

1010

Mason, Grade 2

day

0.05

612.00

30.60

1007

Khallasi

day

0.10

553.00

55.30

 

TOTAL

 

 

 

1416.67

 

Add 12% GST (MF = 0.1405)

 

 

 

199.04

 

TOTAL

 

 

 

1615.72

 

OVERHEADS & PROFIT @ 15 %

 

 

 

242.36

 

TOTAL

 

 

 

1858.08

 

Rate per Each

 

 

 

1858.08

 

Say

 

 

 

1858.00

4.5.6 450 mm width X 50 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2754

MS perforated cable tray Reducer 450 X 50 X 2 mm

each

1.00

1342.00

1342.00

2722

MS perforated cable tray Connector 450 X 50 X 2 mm

each

1.00

51.00

51.00

2805

35 mm X 35 mm X 4 mm angle iron = 1 X 0.5m =0.5 @2.09kg/m = 1.05kg

kg

1.05

33.00

34.65

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2802

MS Suspender 8 mm dia 0.75m long

each

2.00

28.00

56.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

1503.25

 

Cartage @ 1 % of A1

 

 

 

15.03

LABOUR

1005

Fitter, Grade 2

day

0.05

612.00

30.60

1010

Mason, Grade 2 day 0.05 612.00

day

0.05

612.00

30.60

1007

Khallasi

day

0.10

553.00

55.30

 

TOTAL

 

 

 

1634.78

 

Add 12% GST (MF = 0.1405)

 

 

 

229.69

 

TOTAL

 

 

 

1864.47

 

OVERHEADS & PROFIT @ 15 %

 

 

 

279.67

 

TOTAL

 

 

 

2144.14

 

Rate per Each

 

 

 

2144.14

 

Say

 

 

 

2144.00

4.5.7 600 mm width X 50 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2755

MS perforated cable tray Reducer 600 X 50 X 2 mm

each

1.00

1671.00

1671.00

2723

MS perforated cable tray Connector 600 X 50 X 2 mm

each

1.00

56.00

56.00

2805

35 mm X 35 mm X 4 mm angle iron = 1 X 0.65m =0.65 @2.09kg/m = 1.36kg

kg

1.36

33.00

44.88

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2802

MS Suspender 8 mm dia 0.75m long

each

2.00

28.00

56.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

1847.48

 

Cartage @ 1 % of A1

 

 

 

18.47

LABOUR

1005

Fitter, Grade 2

day

0.05

612.00

30.60

1010

Mason, Grade 2

day

0.05

612.00

30.60

1007

Khallasi

day

0.10

553.00

55.30

 

TOTAL

 

 

 

1982.45

 

Add 12% GST (MF = 0.1405)

 

 

 

278.53

 

TOTAL

 

 

 

2260.99

 

OVERHEADS & PROFIT @ 15 %

 

 

 

339.15

 

TOTAL

 

 

 

2600.14

 

Rate per Each

 

 

 

2600.14

 

Say

 

 

 

2600.00

4.5.8 300 mm width X 62.5 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2756

MS perforated cable tray Reducer  300 X 62.5 X 2 mm

each

1.00

1028.00

1028.00

2724

MS perforated cable tray Connector 300 X 62.5 X 2 mm

each

1.00

44.00

44.00

2804

25 mm X 25 mm X 3 mm angle iron = 0.35 @1.11kg/m = 0.39kg

kg

0.39

33.00

12.87

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2801

MS Suspender 6 mm dia 0.75m long

each

2.00

23.00

46.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

1150.47

 

Cartage @ 1 % of A1

 

 

 

11.50

LABOUR

1005

Fitter, Grade 2

day

0.05

612.00

30.60

1010

Mason, Grade 2

day

0.05

612.00

30.60

1007

Khallasi

day

0.10

553.00

55.30

 

TOTAL 

 

 

 

1278.47

 

Add 12% GST (MF = 0.1405)

 

 

 

179.63

 

TOTAL

 

 

 

1458.10

 

OVERHEADS & PROFIT @ 15 %

 

 

 

218.72

 

TOTAL

 

 

 

1676.82

 

Rate per Each

 

 

 

1676.82

 

Say

 

 

 

1677.00

4.5.9 375 mm width X 62.5 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2757

MS perforated cable tray Reducer 375 X 62.5 X 2 mm

each

1.00

1210.00

1210.00

2725

MS perforated cable tray Connector 375 X 62.5 X 2 mm

each

1.00

50.00

50.00

2805

35 mm X 35 mm X 4 mm angle iron = 1 X 0.425m =0.43 @2.09kg/m = 0.9kg

kg

0.90

33.00

29.70

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2801

MS Suspender 6 mm dia 0.75m long

each

2.00

23.00

46.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

1355.30

 

Cartage @ 1 % of A1

 

 

 

13.55

LABOUR

1005

Fitter, Grade 2

day

0.05

612.00

30.60

1010

Mason, Grade 2

day

0.05

612.00

30.60

1007

Khallasi

day

0.10

553.00

55.30

 

TOTAL  

 

 

 

1485.35

 

Add 12% GST (MF = 0.1405)

 

 

 

208.69

 

TOTAL

 

 

 

1694.05

 

OVERHEADS & PROFIT @ 15 %

 

 

 

254.11

 

TOTAL

 

 

 

1948.16

 

Rate per Each

 

 

 

1948.16

 

Say

 

 

 

1948.00

4.5.10450 mm width X 62.5 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2758

MS perforated cable tray Reducer 450 X 62.5 X 2 mm

each

1.00

1393.00

1393.00

2726

MS perforated cable tray Connector 450 X 62.5 X 2 mm

each

1.00

55.00

55.00

2805

35 mm X 35 mm X 4 mm angle iron = 1 X 0.5m = @2.09kg/m = 1.05kg

kg

1.05

33.00

34.65

2855

Steel fastener 6 mm X 75 mm

each

2.00

5.50

11.00

2801

MS Suspender 6 mm dia 0.75m long

each

2.00

23.00

46.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

1544.65

 

Cartage @ 1 % of A1

 

 

 

15.45

LABOUR

1005

Fitter, Grade 2

day

0.08

612.00

48.96

1010

Mason, Grade 2

day

0.08

612.00

48.96

1007

Khallasi

day

0.16

553.00

88.48

 

TOTAL

 

 

 

1746.50

 

Add 12% GST (MF = 0.1405)

 

 

 

245.38

 

TOTAL

 

 

 

1991.88

 

OVERHEADS & PROFIT @ 15 %

 

 

 

298.78

 

TOTAL

 

 

 

2290.66

 

Rate per Each

 

 

 

2290.66

 

Say

 

 

 

2291.00

4.5.11 600 mm width X 62.5 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2759

MS perforated cable tray Reducer 600 X 62.5 X 2 mm

each

1.00

1762.00

1762.00

2727

MS perforated cable tray Connector 600 X 62.5 X 2 mm

each

1.00

61.00

61.00

2805

35 mm X 35 mm X 4 mm angle iron = 1 X 0.65m =0.65 @ 2.09kg/m = 1.36kg

kg

1.36

33.00

44.88

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2802

MS Suspender 8 mm dia 0.75m long

each

2.00

28.00

56.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

1943.48

 

Cartage @ 1 % of A1

 

 

 

19.43

LABOUR

1005

Fitter, Grade 2

day

0.08

612.00

48.96

1010

Mason, Grade 2

day

0.08

612.00

48.96

1007

Khallasi

day

0.16

553.00

88.48

 

TOTAL

 

 

 

2149.31

 

Add 12% GST (MF = 0.1405)

 

 

 

301.98

 

TOTAL

 

 

 

2451.29

 

OVERHEADS & PROFIT @ 15 %

 

 

 

367.69

 

TOTAL

 

 

 

2818.98

 

Rate per Each

 

 

 

2818.98

 

Say

 

 

 

2819.00

4.5.12750 mm width X 62.5 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2760

MS perforated cable tray Reducer 750 X 62.5 X 2 mm

each

1.00

2093.00

2093.00

2728

MS perforated cable tray Connector 750 X 62.5 X 2 mm

each

1.00

67.00

67.00

2805

35 mm X 35 mm X 4 mm angle iron  = 1 X 0.8m =0.8 @2.09kg/m = 1.67kg

kg

1.67

33.00

55.11

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2802

MS Suspender 8 mm dia 0.75m long

each

2.00

28.00

56.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

2290.71

 

Cartage @ 1 % of A1

 

 

 

22.91

LABOUR

1005

Fitter, Grade 2

day

0.08

612.00

48.96

1010

Mason, Grade 2

day

0.08

612.00

48.96

1007

Khallasi

day

0.16

553.00

88.48

 

TOTAL

 

 

 

2500.02

 

Add 12% GST (MF = 0.1405)

 

 

 

351.25

 

TOTAL

 

 

 

2851.27

 

OVERHEADS & PROFIT @ 15 %

 

 

 

427.69

 

TOTAL

 

 

 

3278.96

 

Rate per Each

 

 

 

3278.96

 

Say

 

 

 

3279.00

4.5.13900 mm width X 62.5 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2761

MS perforated cable tray Reducer 900 X 62.5 X 2 mm

each

1.00

2498.00

2498.00

2729

MS perforated cable tray Connector 900 X 62.5 X 2 mm

each

1.00

71.00

71.00

2805

35 mm X 35 mm X 4 mm angle iron = 1 X 0.95m =0.95 @2.59kg/m = 2.46kg

kg

2.46

33.00

81.18

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2802

MS Suspender 8 mm dia 0.75m long

each

2.00

28.00

56.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

2725.78

 

Cartage @ 1 % of A1

 

 

 

27.26

LABOUR

1005

Fitter, Grade 2

day

0.08

612.00

48.96

1010

Mason, Grade 2

day

0.08

612.00

48.96

1007

Khallasi

day

0.16

553.00

88.48

 

TOTAL

 

 

 

2939.44

 

Add 12% GST (MF = 0.1405)

 

 

 

412.99

 

TOTAL

 

 

 

3352.43

 

OVERHEADS & PROFIT @ 15 %

 

 

 

502.86

 

TOTAL

 

 

 

3855.29

 

Rate per Each

 

 

 

3855.29

 

Say

 

 

 

3855.00

4.5.14600 mm width X 75 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2762

MS perforated cable tray Reducer 600 X 75 X 2 mm

each

1.00

1822.00

1822.00

2727

MS perforated cable tray Connector 600 X 62.5 X 2 mm

each

1.00

61.00

61.00

2805

35 mm X 35 mm X 4 mm angle iron = 1 X 0.65m =0.65 @2.09kg/m = 1.36kg

kg

1.36

33.00

44.88

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2802

MS Suspender 8 mm dia 0.75m long

each

2.00

28.00

56.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

2003.48

 

Cartage @ 1 % of A1

 

 

 

20.03

LABOUR

1005

Fitter, Grade 2

day

0.08

612.00

48.96

1010

Mason, Grade 2

day

0.08

612.00

48.96

1007

Khallasi

day

0.16

553.00

88.48

 

TOTAL

 

 

 

2209.91

 

Add 12% GST (MF = 0.1405)

 

 

 

310.49

 

TOTAL

 

 

 

2520.41

 

OVERHEADS & PROFIT @ 15 %

 

 

 

378.06

 

TOTAL

 

 

 

2898.47

 

Rate per Each

 

 

 

2898.47

 

Say

 

 

 

2898.00

4.5.15750 mm width X 75 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2763

MS perforated cable tray Reducer 750 X 75 X 2 mm

each

1.00

2145.00

2145.00

2728

MS perforated cable tray Connector 750 X 62.5 X 2 mm

each

1.00

67.00

67.00

2805

35 mm X 35 mm X 4 mm angle iron = 1 X 0.8m =0.8 @2.09kg/m = 1.67kg

kg

1.67

33.00

55.11

2856

Steel fastener 8 mm X 75 mm 

each

2.00

7.30

14.60

2802

MS Suspender 8 mm dia 0.75m long

each

2.00

28.00

56.00

2936

Painting with primer and finish paint

L.S.

1.00

5.00

5.00

 

Total cost of materials

 

 

 

2342.71

 

Cartage @ 1 % of A1

 

 

 

23.43

LABOUR

1005

Fitter, Grade 2

day

0.08

612.00

48.96

1010

Mason, Grade 2

day

0.08

612.00

48.96

1007

Khallasi

day

0.16

553.00

88.48

 

TOTAL

 

 

 

2552.54

 

Add 12% GST (MF = 0.1405)

 

 

 

358.63

 

TOTAL

 

 

 

2911.17

 

OVERHEADS & PROFIT @ 15 %

 

 

 

436.68

 

TOTAL

 

 

 

3347.85

 

Rate per Each

 

 

 

3347.85

 

Say

 

 

 

3348.00

4.5.16900 mm width X 75 mm depth X 2.0 mm thickness Details of cost for 1 No

MATERIALS

2764

MS perforated cable tray Reducer 900 X 75 X 2 mm

each

1.00

2558.00

2558.00

2729

MS perforated cable tray Connector  900 X 62.5 X 2 mm

each

1.00

71.00

71.00

2806

35 mm X 35 mm X 5 mm angle iron = 1 X 0.95m =0.95 @2.59kg/m = 2.46kg

kg

2.46

33.00

81.18

2856

Steel fastener 8 mm X 75 mm

each

2.00

7.30

14.60

2802

MS Suspender 8 mm dia 0.75m long

each

2.00

28.00

56.00

2936

Painting with primer and finish paint. 5.00

L.S

1.00

5.00

5.00

 

Total cost of materials

 

 

 

2785.78

 

Cartage @ 1 % of A1

 

 

 

27.86

LABOUR

1005

Fitter, Grade 2

day

0.08

612.00

48.96

1010

Mason, Grade 2

day

0.08

612.00

48.96

1007

Khallasi

day

0.16

553.00

88.48

 

TOTAL

 

 

 

3000.04

 

Add 12% GST (MF = 0.1405)

 

 

 

421.51

 

TOTAL

 

 

 

3421.54

 

OVERHEADS & PROFIT @ 15 %

 

 

 

513.23

 

TOTAL

 

 

 

3934.77

 

Rate per Each

 

 

 

3934.77

 

Say

 

 

 

3935.00

4.6 Supplying and installing following size of perforated   Hot Dipped Galvanised  Iron cable tray cable tray  with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with G.I. suspenders including G.I.  bolts & nuts, etc as required.

4.6.1 100 mm width X 50 mm depth X 1.6 mm thickness Details of cost for 30 metres

MATERIAL

3701

Perforated cable tray Hot Dipped Galvanised Iron  100mm X 50mm X 1.6 mm = 30 + 1.5 (wastage @ 5%) = 31.5m

metre

31.50

239.00

7528.50

3717

Perforated cable tray connector Hot Dipped Galvanised Iron  100mm X 50mm X 1.6 mm

each

9.00

30.00

270.00

3804

25 mm X 25 mm X 3 mm Galvannised slottedangle iron/ channel = 20x0.15m = 3.0m @ 1.11 kg/m = 3.33kg

kg

3.33

41.00

/ 136.53

2855

Steel fastener 6 mm X 75 mm

each

40.00

5.50

220.00

3801

GI Suspender 6 mm dia 0.75m long

each

40.00

20.00

800.00

 

Total cost of materials

 

 

 

8955.03

 

Cartage @ 1 %

 

 

 

89.55

 

LABOUR

 

 

 

 

1005

Fitter, Grade 2

day

2.00

612.00

1224.00

1010

 

Mason, Grade 2

day

2.00

612.00

1224.00

1007

Khallasi

day

4.00

553.00

2212.00

 

TOTAL 

 

 

 

14727.72

 

Add 12% GST (MF = 0.1405)

 

 

 

2069.24

 

TOTAL

 

 

 

16796.97

 

Add 15 % Over Head & Contractor Profit

 

 

 

2519.54

 

Cost for 30 Metre

 

 

 

19316.51

 

Rate per Metre

 

 

 

643.88

 

Say

 

 

 

644.00

4.6.3 225 mm width X 50 mm depth X 1.6 mm thickness Details of cost for 30 metres

MATERIAL

3703

perforated cable tray Hot Dipped Galvanised iron 225 X 50 X 1.6 mm = 30 + 1.5 (wastage @ 5%) = 31.5m

metre

31.50

386.10

12162.15

3719

perforated cable tray Connector Hot Dipped  Galvanised Iron  225 X 50 X 1.6 mm

each

9.00

38.00

342.00

3804

25 mm X 25 mm X 3 mm Galvannised slotted angle iron/ channel = 20x0.25m = 5.0m @ 1.11 kg/m = 5.55kg

kg

 5.55

41.00

227.55

2855

Steel fastener 6 mm X 75 mm

each

40.00

5.50

220.00

3801

GI Suspender 6 mm dia 0.75m long

each

40.00

20.00

800.00

 

Total cost of materials

 

 

 

13751.70

 

Cartage @ 1 %

 

 

 

137.52

LABOUR

1005

Fitter, Grade 2

day

2.00

612.00

1224.00

1010

Mason, Grade 2

day

2.00

612.00

1224.00

1007

Khallasi

day

4.00

553.00

2212.00

 

TOTAL

 

 

 

18549.22

 

Add 12% GST (MF = 0.1405)

 

 

 

2606.16

 

TOTAL

 

 

 

21155.38

 

Add 15 % Over Head & Contractor Profit

 

 

 

3173.31

 

Cost for 30 Metre

 

 

 

24328.69

 

Rate per Metre

 

 

 

810.96

 

Say

 

 

 

811.00

4.6.4 300 mm width X 50 mm depth X 1.6 mm thickness Details of cost for 30 metres

MATERIAL

3704

Perforated cable tray Hot Dipped Galvanised Iron  300 X 50 X 1.6 mm = 30 + 1.5 (wastage @ 5%) = 31.5m

metre

31.50

429.00

13513.50

3720

Perforated cable tray Connector Hot Dipped Galvanised Iron   300 X 50 X 1.6 mm

each

9.00

38.00

342.00

3804

25 mm X 25 mm X 3 mm Galvannised slotted/ angle iron/ channel

kg

7.77

41.00

318.57

2855

Steel fastener 6 mm X 75 mm

each

40.00

5.50

220.00

3801

GI Suspender 6 mm dia 0.75m long

each

40.00

20.00

800.00

 

Total cost of materials

 

 

 

15194.07

 

Cartage @ 1 %

 

 

 

151.94

LABOUR

1005

Fitter, Grade 2

day

2.00

612.00

1224.00

1010

Mason, Grade 2

day

2.00

612.00

1224.00

1007

Khallasi

day

4.00

553.00

2212.00

 

TOTAL

 

 

 

20006.01

 

Add 12% GST (MF = 0.1405)

 

 

 

2810.84

 

TOTAL

 

 

 

22816.86

 

Add 15 % Over Head & Contractor Profit

 

 

 

3422.53

 

Cost for 30 Metre

 

 

 

26239.38

 

Rate per Metre

 

 

 

874.65

 

Say

 

 

 

875.00

4.6.5 375 mm width X 50 mm depth X 2.0 mm thickness Details of cost for 30 metres

MATERIAL

3705

Perforated cable tray Hot Dipped Galvanised Iron  375 X 50 X 2 mm = 30 + 1.5 (wastage @ 5%) = 31.5m

metre

31.50

584.10

18399.15

3721

Perforated cable tray Connector Hot Dipped Galvanised Iron 375 X 50 X 2 mm

each

9.00

38.00

342.00

3805

35 mm X 55 mm X 4 mm Galvannised slotted/ angle iron/ channel

kg

17.77

41.00

728.57

2855

Steel fastener 6 mm X 75 mm

each

40.00

5.50

220.00

3801

GI Suspender 6 mm dia 0.75m long

each

40.00

20.00

800.00

 

Total cost of materials

 

 

 

20489.72

 

Cartage @ 1 %

 

 

 

204.90

LABOUR

1005

Fitter, Grade 2

day

2.00

612.00

1224.00

1010

Mason, Grade 2

day

2.00

612.00

1224.00

1007

Khallasi day

 

 

553.00

2212.00

 

TOTAL

 

 

 

25354.62

 

Add 12% GST (MF = 0.1405)

 

 

 

3562.32

 

TOTAL

 

 

 

28916.94

 

Add 15 % Over Head & Contractor Profit

 

 

 

4337.54

 

Cost for 30 Metre

 

 

 

33254.48

 

Rate per Metre

 

 

 

1108.48

 

Say

 

 

 

1108.00

4.6.6 450 mm width X 50 mm depth X 2.0 mm thickness Details of cost for 30 metres

MATERIAL

3706

Perforated cable tray Hot Dipped Galvanised Iron  450 X 50 X 2 mm = 30 + 1.5 (wastage @ 5%) = 31.5m

metre

31.50

649.00

20443.50

3722

Perforated cable trayConnector Hot Dipped Galvanised Iron   450 X 50 X 2 mm

each

9.00

38.00

342.00

3805

35 mm X 55 mm X 4 mm Galvannised slotted/ angle iron/ channel = 20x0.5m = 10.0m @ 2.09 kg/m = 20.09kg

kg

20.90

41.00

856.90

2855

Steel fastener 6 mm X 75 mm

each

40.00

5.50

220.00

3802

GI Suspender 8 mm dia 0.75m long

each

40.00

25.00

1000.00

 

Total cost of materials

 

 

 

22862.40

 

Cartage @ 1 %

 

 

 

228.62

LABOUR

1005

Fitter, Grade 2

day

2.00

612.00

1224.00

1010

Mason, Grade 2

day

2.00

612.00

1224.00

1007

Khallasi

day

4.00

553.00

2212.00

 

TOTAL

 

 

 

27751.02

 

Add 12% GST (MF = 0.1405)

 

 

 

3899.02

 

TOTAL

 

 

 

31650.04

 

Add 15 % Over Head & Contractor Profit

 

 

 

4747.51

 

Cost for 30 Metre

 

 

 

36397.55

 

Rate per Metre

 

 

 

1213.25

 

Say

 

 

 

1213.00

4.6.7 600 mm width X 50 mm depth X 2.0 mm thickness Details of cost for 30 metres

MATERIAL

3707

Perforated cable tray Hot Dipped Galvanised Iron 600 X 50 X 2 mm = 30 + 1.5 (wastage @ 5%) = 31.5m

metre

31.50

             

950.00

29925.00

3723

Perforated cable tray Connector Hot Dipped Galvanised Iron  600 X 50 X 2 mm

each

9.00

38.00

342.00

3805

35 mm X 55 mm X 4 mm Gaalvannised slotted/ angle iron/ channel = 20x0.65m = 13.0m @ 2.09 kg/m = 27.17kg

kg

27.17

41.00

1113.97

2856

Steel fastener 8 mm X 75 mm

each

40.00

7.30

292.00

3802

GI Suspender 8 mm dia 0.75m long

each

40.00

25.00

1000.00

 

Total cost of materials

 

 

 

32672.97

 

Cartage @ 1 % 326.73

 

 

 

 

LABOUR

1005

Fitter, Grade 2

day

2.00

612.00

1224.00

1010

Mason, Grade 2

day

2.00

612.00

1224.00

1007

Khallasi

day

4.00

553.00

2212.00

 

TOTAL

 

 

 

37659.70

 

Add 12% GST (MF = 0.1405)  

 

 

 

5291.19

 

TOTAL

 

 

 

42950.89

 

Add 15 % Over Head & Contractor Profit

 

 

 

6442.63

 

Cost for 30 Metre

 

 

 

49393.52

 

Rate per Metre

 

 

 

1646.45

 

Say

 

 

 

1646.00

4.6.8 300 mm width X 62.5 mm depth X 2.0 mm thickness Details of cost for 30 metres

MATERIAL

3708

Perforated cable tray Hot Dipped Galvanised Iron  300 X 62.5 X 2 mm = 30 + 1.5 (wastage @ 5%) = 31.5m

metre

31.50

578.00

18207.00

3724

Perforated cable tray Hot Dipped Galvanised Iron Connector   300 X 62.5 X 2 mm

each

9.00

38.00

342.00

3804

25 mm X 25 mm X 3 mm Galvannised slotted/ angle iron/ channel = 20x0.35m = 7.0m @ 1.11 kg/m = 7.77kg

kg

7.77

41.00

318.57

2856

Steel fastener 8 mm X 75 mm 

each

40.00

7.30

292.00

3801

GI Suspender 6 mm dia 0.75m long

each

40.00

20.00

800.00

 

Total cost of materials

 

 

 

19959.57

 

Cartage @ 1 %

 

 

 

199.60

LABOUR

1005

Fitter, Grade 2

day

2.00

612.00

1224.00

1010

Mason, Grade 2

day

2.00

612.00

1224.00

1007

Khallasi

day

4.00

553.00

2212.00

 

TOTAL

 

 

 

24819.17

 

Add 12% GST (MF = 0.1405)

 

 

 

3487.09

 

TOTAL

 

 

 

28306.26

 

Add 15 % Over Head & Contractor Profit

 

 

 

4245.94

 

Cost for 30 Metre

 

 

 

32552.20

 

Rate per Metre

 

 

 

1085.07

 

Say

 

 

 

1085.00

4.6.9 375 mm width X 62.5 mm depth X 2.0 mm thickness Details of cost for 30 metres

MATERIAL

3709

Perforated cable tray Hot Dipped Galvanised Iron  375 X 62.5 X 2 mm = 30 + 1.5 (wastage @ 5%) = 31.5m

metre

31.50

680.00

21420.00

3725

Perforated cable trayConnector Hot Dipped Galvanised Iron   375 X 62.5 X 2 mm

each

9.00

38.00

342.00

3805

35 mm X 55 mm X 4 mm Galvannised slotted/ angle iron/ channel = 20x0.425m = 8.5m @ 2.09 kg/m = 17.77kg

kg

17.77

41.00

728.57

2856

Steel fastener 8 mm X 75 mm

each

40.00

7.30

292.00

3801

GI Suspender 6 mm dia 0.75m long

each

40.00

20.00

800.00

 

Total cost of materials

 

 

 

23582.57

 

Cartage @ 1 %

 

 

 

235.83

LABOUR

1005

Fitter, Grade 2

day

2.00

612.00

1224.00

1010

Mason, Grade 2

day

2.00

612.00

1224.00

1007

Khallasi

day

4.00

553.00

2212.00

 

TOTAL

 

 

 

28478.40

 

Add 12% GST (MF = 0.1405)

 

 

 

4001.21

 

TOTAL

 

 

 

32479.61

 

Add 15 % Over Head & Contractor Profit

 

 

 

4871.94

 

Cost for 30 Metre

 

 

 

37351.55

 

Rate per Metre

 

 

 

1245.05

 

Say

 

 

 

1245.00

4.6.10450 mm width X 62.5 mm depth X 2.0 mm thicknessICDDescriptionUnit Details of cost for 30 metres

MATERIAL

3710

Perforated cable tray Hot Dipped Galvanised Iron  450 X 62.5 X 2 mm = 30 + 1.5 (wastage @ 5%) = 31.5m

metre

31.50

782.00

24633.00

3726

Perforated cable trayConnector Hot Dipped Galvanised Iron  450 X 62.5 X 2 mm

each

9.00

38.00

342.00

3805

35 mm X 55 mm X 4 mm Galvannised slotted/ angle iron/ channel = 20x0.5m = 10.0m @ 2.09 kg/m = 20.09kg

kg

20.90

41.00

856.90

2855

Steel fastener 6 mm X 75 mm

each

40.00

5.50

220.00

3801

GI Suspender 6 mm dia 0.75m long

each

40.00

20.00

800.00

 

Total cost of materials

 

 

 

26851.90

 

Cartage @ 1 %

 

 

 

268.52

LABOUR

1005

Fitter, Grade 2

day

2.50

612.00

1530.00

1010

Mason, Grade 2

day

2.50

612.00

1530.00

1007

Khallasi 

day

5.00

553.00

2765.00

 

TOTAL

 

 

 

32945.42

 

Add 12% GST (MF = 0.1405)

 

 

 

4628.83

 

TOTAL

 

 

 

37574.25

 

Add 15 % Over Head & Contractor Profit

 

 

 

5636.14

 

Cost for 30 Metre

 

 

 

43210.39

 

Rate per Metre

 

 

 

1440.35

 

Say

 

 

 

1440.00

4.6.11 600 mm width X 62.5 mm depth X 2.0 mm thickness Details of cost for 30 metres

MATERIAL

3711

Perforated cable tray Hot Dipped Galvanised Iron 600 X 62.5 X 2 mm = 30 + 1.5 (wastage @ 5%) = 31.5

metre

31.50

989.00

31153.50

3727

Perforated cable trayConnector Hot Dipped 9.00 38.00 342.00 Galvanised Iron   600 X 62.5 X 2 mm

each

9.00

38.00

342.00

3805

35 mm X 55 mm X 4 mm Galvannised slotted/  angle iron/ channe

kg

27.17

41.00

1113.97

2856

Steel fastener 8 mm X 75 mm h

eac

40.00

7.30

292.00

3802

GI Suspender 8 mm dia 0.75m long

each

40.00

25.00

1000.00

 

Total cost of materials

 

 

 

33901.47

 

Cartage @ 1 %

 

 

 

339.01

LABOUR

1005

Fitter, Grade 2

day

2.50

612.00

1530.00

1010

Mason, Grade 2

day

2.50

612.00

1530.00

1007

Khallasi

day

5.00

553.00

2765.00

 

TOTAL

 

 

 

40065.48

 

Add 12% GST (MF = 0.1405)

 

 

 

5629.20

 

TOTAL

 

 

 

45694.69

 

Add 15 % Over Head & Contractor Profit

 

 

 

6854.20

 

Cost for 30 Metre

 

 

 

52548.89

 

Rate per Metre

 

 

 

1751.63

 

Say

 

 

 

1752.00

4.6.12750 mm width X 62.5 mm depth X 2.0 mm thickness Details of cost for 30 metres

MATERIAL

3712

Perforated cable tray Hot Dipped Galvanised Iron  750 X 62.5 X 2 mm = 30 + 1.5 (wastage @ 5%) = 31.5m

metre

31.50

1216.00

38304.00

3728

Perforated cable tray Connector Hot Dipped Galvanised Iron  750 X 62.5 X 2 mm

each

9.00

38.00

342.00

3805

35 mm X 55 mm X 4 mm Galvannised slotted/ angle iron/ channel = 20x0.8m = 16.0m @ 2.09 kg/m = 33.44kg

kg

33.44

41.00

1371.04

2856

Steel fastener 8 mm X 75 mm

each

40.00

7.30

292.00

3802

GI Suspender 8 mm dia 0.75m long

each

40.00

25.00

1000.00

 

Total cost of materials

 

 

 

41309.04

 

Cartage @ 1 %

 

 

 

413.09

LABOUR

1005

Fitter, Grade 2

day

2.50

612.00

1530.00

1010

Mason, Grade 2

day

2.50

612.00

1530.00

1007

Khallasi

day

 

 

 

 

TOTAL

 

 

 

47547.13

 

Add 12% GST (MF = 0.1405)

 

 

 

6680.37

 

TOTAL

 

 

 

54227.50

 

Add 15 % Over Head & Contractor Profit

 

 

 

8134.13

 

Cost for 30 Metre

 

 

 

62361.

 

Rate per Metre

 

 

 

2078.72

 

Say

 

 

 

2079.00

4.6.13900 mm width X 62.5 mm depth X 2.0 mm thickness Details of cost for 30 metres

MATERIAL

3713

Perforated cable tray Hot Dipped 0  Galvanised Iron 900 X 62.5 X 2 mm = 30 + 1.5 (wastage @ 5%) = 31.5m

metre

31.50

1424.00

44856.00

3729

Perforated cable trayConnector Hot Dipped Galvanised Iron  900 X 62.5 X 2 mm

each

9.00

38.00

342.00

3806

35mm X 35 mm X 5 mm Galvannised slotted/ angle iron/ channel = 20x0.95m = 19.0m @ 2.09 kg/m = 49.21 kg

kg

49.21

41.00

2017.61

2856

Steel fastener 8 mm X 75 mm

each

40.00

7.30

292.00

3803

GI Suspender 10 mm dia 0.75m long

each

40.00

30.00

1200.00

 

Total cost of materials

 

 

 

48707.61

 

Cartage @ 1 %

 

 

 

487.08

LABOUR

1005

Fitter, Grade 2

day

2.50

612.00

1530.00

1010

Mason, Grade 2

day

2.50

612.00

1530.00

1007

Khallasi

day

5.00

553.00

2765.00

 

TOTAL 

 

 

 

55019.69

 

Add 12% GST (MF = 0.1405)

 

 

 

7730.27

 

TOTAL

 

 

 

62749.95

 

Add 15 % Over Head & Contractor Profit

 

 

 

9412.49

 

Cost for 30 Metre

 

 

 

72162.44

 

Rate per Metre

 

 

 

2405.41

 

Say

 

 

 

2405.00

4.6.14600 mm width X 75 mm depth X 2.0 mm thickness Details of cost for 30 metres

MATERIAL

3714

Perforated cable tray Hot Dipped Galvanised Iron  600 X 75 X 2 mm = 30 + 1.5 (wastage @ 5%) = 31.5m

metre

31.50

1020.00

32130.00

3727

Perforated cable tray Connector Hot Dipped Galvanised Iron   600 X 62.5 X 2 mm

each

9.00

38.00

342.00

3805

35 mm X 35 mm X 4 mm Gaalvannised slotted/ angle iron/ channel = 20x0.65m = 13.0m @ 2.09 kg/m = 27.17 kg

kg

27.17

41.00

1113.97

2856

Steel fastener 8 mm X 75 mm

each

40.00

7.30

292.00

3802

GI Suspender 8 mm dia 0.75m long 

each

40.00

25.00

1000.00

 

Total cost of materials

 

 

 

34877.97

 

Cartage @ 1 %

 

 

 

348.78

LABOUR

1005

Fitter, Grade 2

day

2.50

612.00

1530.00

1010

Mason, Grade 2

day

2.50

612.00

1530.00

1007

Khallasi

day

5.00

553.00

2765.00

 

TOTAL 

 

 

 

41051.75

 

Add 12% GST (MF = 0.1405)

 

 

 

5767.77

 

TOTAL

 

 

 

46819.52

 

Add 15 % Over Head & Contractor Profit

 

 

 

7022.93

 

Cost for 30 Metre

 

 

 

53842.45

 

Rate per Metre

 

 

 

1794.75

 

Say

 

 

 

1795.00

4.6.15750 mm width X 75 mm depth X 2.0 mm thickness Details of cost for 30 metres

MATERIAL

3715

Perforated cable tray Hot Dipped   Galvanised Iron  750 X 75 X 2 mm = 30 + 1.5 (wastage @ 5%) = 31.5m

metre

31.50

1224.00

38556.00

3728

Perforated cable tray Connector Hot Dipped  Galvanised Iron  750 X 75X 2 mm

each

9.00

38.00

342.00

3805

35 mm X 55 mm X 4 mm Gaalvannised slotted/ angle iron/ channel = 20x0.8m = 16.0m @ 2.09 kg/m = 33.44kg

kg

33.44

41.00

1371.04

2856

Steel fastener 8 mm X 75 mm

each

40.00

7.30

292.00

3802

GI Suspender 8 mm dia 0.75m long

each

40.00

25.00

1000.00

 

Total cost of materials

 

 

 

41561.04

 

Cartage @ 1 %

 

 

 

415.61

LABOUR

1005

Fitter, Grade 2

day

2.50

612.00

1530.00

1010

Mason, Grade 2

day

2.50

612.00

1530.00

1007

Khallasi

day

5.00

553.00

2765.00

 

TOTAL

 

 

 

47801.65

 

Add 12% GST (MF = 0.1405)

 

 

 

6716.13

 

TOTAL

 

 

 

54517.78

 

Add 15 % Over Head & Contractor Profit

 

 

 

8177.67

 

Cost for 30 Metre

 

 

 

62695.45

 

Rate per Metre

 

 

 

2089.85

 

Say

 

 

 

2090.00

4.6.16900 mm width X 75 mm depth X 2.0 mm thickness Details of cost for 30 metres

MATERIAL

3716

Perforated cable tray Hot Dipped Galvanised Iron  900 X 75 X 2 mm = 30 + 1.5 (wastage @ 5%) = 31.5m

metre

31.50

1428.00

44982.00

3729

Perforated cable tray Connector Hot Dipped Galvanised Iron   900 X 75 X 2 mm

each

9.00

38.00

342.00

3806

35mm X 35 mm X 5 mm Galvannised slotted/ angle iron/ channel = 20x0.95m = 19.0m @ 2.59 kg/m = 49.21 kg

kg

49.21

41.00

2017.61

2856

Steel fastener 8 mm X 75 mm

each

40.00

7.30

292.00

3803

GI Suspender 10 mm dia 0.75m long  

each

40.00

30.00

1200.00

 

Total cost of materials

 

 

 

48833.61

 

Cartage @ 1 %

 

 

 

488.34

LABOUR

1005

Fitter, Grade 2

day

2.50

612.00

1530.00

1010

Mason, Grade 2

day

2.50

612.00

1530.00

1007

Khallasi

day

5.00

553.00

2765.00

 

TOTAL

 

 

 

55146.95

 

Add 12% GST (MF = 0.1405)

 

 

 

7748.15

 

TOTAL

 

 

 

62895.09

 

Add 15 % Over Head & Contractor Profit

 

 

 

9434.26

 

Cost for 30 Metre

 

 

 

72329.36

 

Rate per Metre

 

 

 

2410.98

 

Say

 

 

 

2411.00

4.7 Supplying and installing following size of perforated Hot Dipped Galvanised  Iron cable tray “bends “    ( galvanisation not less than 50 microns) with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with G.I. suspenders including G.I.  bolts & nuts, etc as required

4.7.1 100 mm width X 50 mm depth X 1.6 mm thickness Details of cost for 1 No

MATERIAL

3733

Hot Dipped G.I. Perforated cable tray Bend 100 X 50 X 1.6 mm

each

1.00

599.00

599.00

3717

Hot Dipped G.I. Perforated cable tray Connector 100 X 50 X 1.6 mm

each

1.00

30.00

30.00

3804

25 mm X 25 mm X 3 mm Galvannised slotted/  angle iron/ channel = 1x0.15m = 0.15m @ 1.11 kg/m = 0.17 kg

kg

0.17

41.00

6.97

2855

Steel fastener 6 mm X 75 mm

each

2.00

5.50

11.00

3801

GI Suspender 6 mm dia 0.75m long

each

2.00

20.00

40.00

 

Total cost of materials

 

 

 

686.97

 

Cartage @ 1 %

 

 

 

6.87

LABOUR

1005

Fitter, Grade 2

day

0.05

612.00

30.60

1010

Mason, Grade 2

day

0.05

612.00

30.60

1007

Khallasi

day

0.10

553.00

55.30

 

TOTAL

 

 

 

810.34

 

Add 12% GST (MF = 0.1405)

 

 

 

113.85

 

TOTAL

 

 

 

924.19

 

Add 15 % Over Head & Contractor Profit

 

 

 

138.63

 

TOTAL

 

 

 

1062.82

 

Rate for 1 No

 

 

 

1062.82

 

Say

 

 

 

1063.00

4.7.2 150 mm width X 50 mm depth X 1.6 mm thickness Details of cost for 1 No

MATERIAL

3734

Hot Dipped G.I. Perforated cable tray Bend 150 X 50 X 1.6 mm

each

1.00

670.00

670.00

3718

Hot Dipped G.I. Perforated cable tray Connector  150 X 50 X 1.6 mm

each

1.00

36.00

36.00

3804

25 mm X 25 mm X 3 mm Galvannised slotted/ angle iron/ channel = 1x0.2m = 0.20m @ 1.11 kg/m = 0.22 kg

kg

0.22

41.00

9.02

2855

Steel fastener 6 mm X 75 mm

each

2.00

5.50

11.00

3801

GI Suspender 6 mm dia 0.75m long

each

2.00

20.00

40.0

 

Total cost of materials

 

 

 

766.02

 

Cartage @ 1 %

 

 

 

7.66

 

LABOUR

 

 

 

 

1005

Fitter, Grade 2

day

0.05

612.00

30.60

1010

Mason, Grade 2

day

0.05

612.00

30.60

1007

Khallasi

day

0.10

553.00

55.30

 

TOTAL

 

 

 

890.18

 

Add 12% GST (MF = 0.1405)

 

 

 

125.07

 

TOTAL

 

 

 

1015.25

 

Add 15 % Over Head & Contractor Profit

 

 

 

152.29

 

TOTAL

 

 

 

1167.54

 

Rate for 1 No

 

 

 

1167.54

 

Say

 

 

 

1168.00

4.7.3 225 mm width X 50 mm depth X 1.6 mm thickness Details of cost for 1 No

MATERIAL

3735

Hot Dipped G.I. Perforated cable tray Bend 225 X 50 X 1.6 mm

each

1.00

965.25

965.25

3719

Hot Dipped G.I. Perforated cable tray Connector   225 X 50 X 1.6 mm 3804 25 mm X 25 mm X 3

each

1.00

38.00

38.00

3804

25 mm X 25 mm X 3 mm Galvannised slotted/  angle iron/ channel = 1x0.25m = 0.25m @ 1.11 kg/m = 0.28 kg

kg

0.28

41.00

11.48

2855

Steel fastener 6 mm X 75 mm

each

2.00

5.50

11.00

3801

GI Suspender 6 mm dia 0.75m long

each

2.00

20.00

40.00

 

Total cost of materials

 

 

 

1065.73

 

Cartage @ 1 %

 

 

 

10.66

LABOUR

1005

Fitter, Grade 2

day

0.05

612.00

30.60

1010

Mason, Grade 2

day

0.05

612.00

30.60

1007

Khallasi

day

0.10

553.00

55.30

 

TOTAL

 

 

 

1192.89

 

Add 12% GST (MF = 0.1405)

 

 

 

167.60

 

TOTAL

 

 

 

1360.49

 

Add 15 % Over Head & Contractor Profit

 

 

 

204.07

 

TOTAL

 

 

 

1564.56

 

Rate for 1 No

 

 

 

1564.56

 

Say

 

 

 

1565.00

4.7.4 300 mm width X 50 mm depth X 1.6 mm thickness Details of cost for 1 No

MATERIAL

3736

Hot Dipped G.I. Perforated cable tray Bend ed 300 X 50 X 1.6 mm

each

1.00

1072.50

1072.50

3720

Hot Dipped G.I. Perforated cable tray Connector 300 X 50 X 1.6 mm

each

1.00

38.00

38.00

3804

25 mm X 25 mm X 3 mm Galvannised slotted/ angle iron/ channel = 1x0.35m = 0.35m @ 1.11 kg/m = 0.39 kg

kg

0.39

41.00

15.99

2855

Steel fastener 6 mm X 75 mm

each

2.00

5.50

11.00

3801

GI Suspender 6 mm dia 0.75m long

each

2.00

20.00

40.00

 

Total cost of materials

 

 

 

1177.49

 

Cartage @ 1 %

 

 

 

11.77

LABOUR

1005

Fitter, Grade 2

day

0.05

612.00

30.60

1010

Mason, Grade 2

day

0.05

612.00

30.60

1007

Khallasi day

day

0.10

553.00

55.30

 

TOTAL

 

 

 

1305.76

 

Add 12% GST (MF = 0.1405)

 

 

 

183.46

 

TOTAL

 

 

 

1489.22

 

Add 15 % Over Head & Contractor Profit

 

 

 

223.38

 

TOTAL