DISMANTLING & DEMOLISHING



BASIC RATES (SH:15.0 DISMANTLING AND DEMOLISHING)
CodeNo. Description  Unit Rate
38 Tractor with ripper attachment day 1200
39 Tractor with trolley day 1350
40 Air compressor 250 cfm with two leads for pneumatic cutters / hammers day 1600
41 Joint cutting machine with 2-3 blades day 800
100 Bandhani day 617
101 Bhisti day 617
103 Blacksmith 2nd class day 679
112 Carpenter 2nd class day 679
114 Beldar day 558
115 Coolie day 558
116 Fitter (grade 1) day 738
117 Assistant Fitter or 2nd class Fitter day 679
123 Mason (brick layer) 1st class day 738
124 Mason (brick layer) 2nd class day 679
128 Mate day 617
130 Mistry day 738
139 Skilled Beldar (for floor rubbing etc.) day 617
761 Fuel wood quintal 500
771 Kerosene oil litre 50
2264 Carriage of Rubbish cum 104
9977 Carriage L.S. 2
9988 Carriage and sundries L.S. 2
9999 Sundries L.S. 2
15.0 DISMANTLING AND DEMOLISHING
Code no Description Unit  Rate
15.1 Demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineerin- charge. cum 607.5
15.2 Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.    
  15.2.1 Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) cum 1737
  15.2.2 Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) cum 1073
15.3 Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. cum 2535
15.4 Demolishing R.B. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- charge. cum 2267
15.5 Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the  cross sectional area of R.C.C. or R.B. work) as per direction of Engineerin- charge. sqm 863.4
15.6 Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work. kg 6.7
15.7 Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of  unserviceable material within 50 metres lead as per direction of Engineer-in-charge.    
  15.7.1 In mud mortar cum 503
  15.7.2 In lime mortar with old mughal bricks cum 1272
  15.7.3 In lime mortar cum 607.5
  15.7.4 In cement mortar cum 1470
15.8 Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured):    
  15.8.1 From brick work in mud mortar 1000 Nos 3355
  15.8.2 From brick work in lime mortar 1000 Nos 3886
  15.8.3 From brick work in cement mortar 1000 Nos 4881
15.9 Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :    
  15.9.1 In lime mortar cum 826.5
  15.9.2 In cement mortar cum 1754
15.1 Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :    
  15.10.1 In lime mortar cum 1045
  15.10.2 In cement mortar cum 2053
15.11 Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured):    
  15.11.1 In lime mortar cum 345.5
  15.11.2 In cement mortar cum 495.8
15.12 Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :    
  15.12.1 Of area 3 sq. metres and below each 274.5
  15.12.2 Of area beyond 3 sq. metres each 375.7
15.13 Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead :    
  15.13.1 Of area 3 sq. metres and below each 106.6
  15.13.2 Of area beyond 3 sq. metres each 140.7
15.14 Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead :    
  15.14.1 Of sectional area 40 square centimetres and above cum 3346
  15.14.2 Of sectional area below 40 square centimetres metre 13.4
15.15 Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional span of one metre or part thereof beyond 10 metres :    
  15.15.1 Of sectional area 40 square centimetres and above cum per metre span 441.5
  15.15.2 Of sectional area below 40 square centimetres metre per metre span 1.25
15.16 Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional height of one metre or part thereof beyond 5 metres :    
  15.16.1 Of sectional area 40 square centimetres and above cum per metre span 636.3
  15.16.2 Of sectional area below 40 square centimetres metre per metre span 2.5
15.17 Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: kg 4.15
  15.17.1 R.S. Joists kg 2.45
  15.17.2 Channels, angles, tees and flats kg 1.7
15.18 Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. kg 4.15
15.19 Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge. kg 2.75
15.2 Extra for dismantling trusses, rafters, purlins etc. of steel work for kg per every additional span of one metre or part thereof beyond 10 metres metre span 0.6
15.21 Extra for dismantling trusses, rafters, purlins etc. of steel work for kg per every additional height of one metre or part thereof beyond 5 metres. kg permetre height 0.6
15.22 Extra for marking of structural steel work required to be re-erected. kg 3.45
15.23 Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.    
  15.23.1 For thickness of tiles 10 mm to 25 mm sqm 54.85
  15.23.2 For thickness of tiles above 25 mm and up to 40 mm sqm  85.7
15.24 Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres lead : cum 940.5
15.25 Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. sqm 190.3
15.26 Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. sqm 79.6
15.27 Demolishing mud phaska in terracing and disposal of material within 50 metres lead. cum 652.3
15.28 Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of:    
  15.28.1 G.S. Sheet sqm 121.9
  15.28.2 Asbestos cement sheet sqm 56.9
15.29 Dismantling stone slab roofing over wooden karries or R.C.C. battens (dismantling karries and battens to be paid for  separately), including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. cum 1903
15.3 Dismantling jack arch roofing and floors including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. sqm 181.4
15.29 Dismantling stone slab roofing over wooden karries or R.C.C. battens (dismantling karries and battens to be paid for separately), including stacking of serviceable material and disposal of unserviceable  within 50 metres lead. cum 1903
15.3 Dismantling jack arch roofing and floors including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. sqm 181.4
15.31 Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. sqm 150
15.32 Demolishing thatch roofing including mats, bamboo, jaffari etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. sqm 41.3
15.33 Dismantling wooden ballies in posts and struts including stacking within 50metres lead. metre 14.95
15.34 Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of:    
  15.34.1 T’ or ‘L’ iron or pipe each 170.3
  15.34.2 R.C.C. each 182.6
15.35 Cutting ballies or wooden posts of fencing at the point of projection above the concrete or ground and stacking the same within 50 metres lead. each 11.15
15.36 Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead. kg 26.25 15.37 Dismantling wooden trellis work excluding frames but including stacking the serviceable material within 50 metres lead. sqm 47.15
15.37 Dismantling wooden trellis work excluding frames but including stacking the serviceable material within 50 metres lead. sqm 47.15
15.38 Dismantling expanded metal or I.R.C. fabrics with necessary battens and beading including stacking the serviceable material within 50 metres lead. sqm 55
15.39 Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead :    
  15.39.1 Up to 10 mm thick sqm 44.9
  15.39.2 Thickness above 10 mm up to 25 mm sqm 57.3
  15.39.3 Thickness above 25 mm up to 40 mm sqm 66.55
15.4 Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead :    
  15.40.1 Thickness up to 40 mm sqm 208.4
  15.40.2 Thickness above 40 mm up to 75 mm sqm 312.3
15.41 Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and  disposal of unserviceable materials within 50 metres lead. sqm 42
15.42 Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead :    
  15.42.1 75 to 80 mm dia pipe metre 54
  15.42.2 100 mm dia pipe metre 55.65
  15.42.3 150 mm dia pipe metre 57.3
15.43 Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :    
  15.43.1 Water bound macadam road sqm 156
  15.43.2 bituminous road sqm 306.7
15.44 Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge :    
  15.44.1 15 mm to 40 mm nominal bore metre 108.2
  15.44.2 Above 40 mm nominal bore metre 117.8
15.45 Dismantling C.I. pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer-in-charge:    
  15.45.1 Up to 150 mm diameter metre 299.1
  15.45.2 Above 150 mm dia up to 300 mm dia metre 395.1
  15.45.3 Above 300 mm diameter metre 515.5
15.46 Dismantling steel cylinder R.C. pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metres lead as per direction of Engineer-in-charge :    
  15.46.1 Up to 600 mm diameter metre 506.3
  15.46.2 Above 600 mm diameter metre 1282
15.47 Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually/ by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-charge :    
  15.47.1 Up to 150 mm diameter metre 236.9
  15.47.2 Above 150 mm diameter metre 287.5
15.48 Taking out C.I. cover with frame from R.C.C. top slab of manholes of various sizes including demolishing of R.C.C. work  manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-charge. each 500.4
15.49 Taking out C.I. cover with frame from R.C.C. top slab of inspection chambers of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-charge. each 292.3
15.5 Dismantling of R.C.C. spun vent shaft including excavating the cement concrete pit completely, taking out the shaft, refilling the excavated gap, stacking the useful materials near the site and disposal of unserviceable materials within 50 metres lead. each 3354
15.51 Dismantling of road gully chamber of various sizes including C.I. grating with frame including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead including refilling the excavated gap. each 686.7
15.52 Dismantling of flushing cistern of all types (C.I./PVC/Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead. each 668.15    
15.53 Dismantling of C.I. sluice valve including stacking of useful materials within a lead of 50 metres    
  15.53.1 Up to 150 mm diameter each 239.1
  15.53.2 Above 150 mm diameter each 878.7
15.54 Dismantling of spindle fire hydrant including stacking of useful materials within 50 metres lead. each 537.6
15.55 Dismantling of cement concrete platform along with curtain walls and base concrete etc. including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead :    
  15.55.1 120 x 120 cm (outside to outside) each 787.7
  15.55.2 210 x 120 cm (outside to outside) each 1208
  15.55.3 320 x 120 cm (outside to outside) each 1710
15.56 Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. sqm 39
15.57 Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge. sqm 42
15.58 Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. cum 2130
15.59 Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge. cum 321.3
15.6 Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved . cum 138.9

*****