EARTH WORK



BASIC RATES (SH: 2.0  EARTH WORK)
Code Description Unit Rate
No.      
0003 Hire charges of Diesel Road Roller - 8 to 10 tonne day 3000.00
0017 Hire and running charges of tipper day 1700.00
0018 Hire and running charges of loader day 5000.00
0020 Hydraulic Excavator (3D) with driver and fuel day 7000.00
0101 Bhisti day 617.00
0103 Blacksmith 2nd class day 679.00
0112 Carpenter 2nd class day 679.00
0113 Chowkidar day 558.00
0114 Beldar day 558.00
0115 Coolie day 558.00
0124 Mason (brick layer) 2nd class day 679.00
0128 Mate day 617.00
0132 Rock Excavator day 558.00
0133 Rock Breaker day 558.00
0134 Rock Hole Driller day 558.00
0135 Stone Chiseller day 617.00
0302 Safeda ballies 125 mm diameter metre 40.00
0325 Blasting powder kg 40.00
0326 Blasting fuse (fuse wire) each 15.00
0771 Kerosene oil litre 50.00
1197 Second class kail wood in scantling 10 cudm 260.00
1198 Second class kail wood in planks 10 cudm 260.00
1235 Diesel litre 73.50
1980 Fly ash cum 10.00
2204 Carriage of Timber cum 118.59
2262 Carriage of Flyash cum 103.77
2335 Carriage of sand cum 103.77
2342 Carriage of Solvent / Diesel. quintal 10.38
6501 Sand zone V (Jamuna) cum 1225.00
7022 Chlorpyriphos 20% E.C. / Lindane 20% E.C. litre 150.00
9999 Sundries L.S. 2.00
 

*****