FIRE DETECTION AND ALARM SYSTEM (CHAPTER 17)
ICD |
Description |
Unit |
Qty |
Rate |
Amount |
No |
|
|
|
|
(Rs.) |
A |
Materials |
|
|
|
|
4101 |
Heat Detectors of electronic Rate of Rise cum |
each |
1.00 |
750.00 |
750.00 |
|
fixed tempreature (Dual Thermistor) type with |
|
|
|
|
|
mounting base complete with all connection etc. |
|
|
|
|
|
Cartage @1% of A |
|
|
|
7.50 |
|
Total |
|
|
|
757.50 |
B |
Labour |
|
|
|
|
1019 |
Electrician |
day |
0.04 |
673.00 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553.00 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
806.54 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
113.32 |
|
Total |
|
|
|
919.86 |
C |
Overhead & Profit @ 15% |
|
|
|
137.98 |
|
Total |
|
|
|
1057.84 |
|
Rate of Each |
|
|
|
1057.84 |
|
Say |
|
|
|
1058.00 |
17.1.2 | Supplying, installation, testing & commissioning of smoke detector with builtin LED and mounting base complete with all connections etc. as required | ||||
A |
Materials |
|
|
|
|
4103 |
Manual call boxes of MS Type in |
each |
1.00 |
300.00 |
300.00 |
|
surface/recess |
|
|
|
|
|
with stainless steel chain & hammer assembly |
|
|
|
|
|
complete with glass and push button etc. |
|
|
|
|
|
Cartage @1% of A |
|
|
|
3.00 |
|
Total |
|
|
|
303.00 |
B |
Labour |
|
|
|
|
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553.00 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
352.04 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
49.46 |
|
Total |
|
|
|
401.50 |
C |
Overhead & Profit @ 15% |
|
|
|
60.23 |
|
Total |
|
|
|
461.73 |
|
Rate of Each |
|
|
|
461.73 |
|
Say |
|
|
|
462.00 |
17.1.3 |
Supplying, installation, testing & commissioning of manual call boxes of MS construction in surface/recess with stainless steel chain & hammer assembly complete with glass and push button etc. as required. |
||||
A |
Materials |
|
|
|
|
4105 |
Response indicator on surface/recessed MS |
each |
1.00 |
90.00 |
90.00 |
|
Box having two LED’s metallic covers complete |
|
|
|
|
|
with all connections etc. |
|
|
|
|
|
Cartage @1% of A |
|
|
|
0.90 |
|
Total |
|
|
|
90.90 |
B |
Labour |
|
|
|
|
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
B |
Labour |
|
|||
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553.00 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
869.67 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
122.19 |
|
Total |
|
|
|
991.85 |
C |
Overhead & Profit @ 15% |
|
|
|
148.78 |
|
Total |
|
|
|
1140.63 |
|
Rate of Each |
|
|
|
1140.63 |
|
Say |
|
|
|
1141.00 |
17.1.5 |
Supplying, installation, testing & commissioning response indicator on surface/ recess MS box having two LEDs metallic cover complete with all connections etc. as required.COST FOR 1 POINT |
||||
A |
Materials |
|
|
|
|
4104 |
Manual call boxes of ABS Type in |
each |
1.00 |
250.00 |
250.00 |
|
surface/recess |
|
|
|
|
|
with stainless steel chain & hammer assembly |
|
|
|
|
|
complete with glass and push button etc. |
|
|
|
|
|
Cartage @1% of A |
|
|
|
2.50 |
|
Total |
|
|
|
252.50 |
B |
Labour |
|
|
|
|
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553.00 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
301.54 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
42.37 |
|
Total |
|
|
|
343.91 |
C |
Overhead & Profit @ 15% |
|
|
|
51.59 |
|
Total |
|
|
|
395.49 |
|
Rate of Each |
|
|
|
395.49 |
|
Say |
|
|
|
395.00 |
Supplying, installation, testing & commissioning of manual call box of ABS type in surface/recess with stainless steel chain & hammer assembly complete with glass and push button etc. as required COST FOR 1 POINT |
|||||
A |
Materials |
|
|
|
|
4106 |
Fire alarm sounders (electronic) with facility to |
each |
1.00 |
362.50 |
362.50 |
|
make announcement, mounted in M.S. Box |
|
|
|
|
|
(16 SWG) with hinged cover plate & suitable for |
|
|
|
|
|
operation with amplifier i/c line matching |
|
|
|
|
|
ttransformer etc. |
|
|
|
|
|
Cartage @1% of A |
|
|
|
3.63 |
|
Total |
|
|
|
366.13 |
B |
Labour |
|
|
|
|
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553.00 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
415.17 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
58.33 |
|
Total |
|
|
|
473.50 |
C |
Overhead & Profit @ 15% |
|
|
|
71.02 |
|
Total |
|
|
|
544.52 |
|
Rate of Each |
|
|
|
544.52 |
|
Say |
|
|
|
545.00 |
17.1.6 |
Supplying, installation, testing & commissioning fire alarm sounder with facility to make announcement, mounted in M.S. box (16 SWG) with hinged cover plate & suitable for operation with amplifier i/c line matching transformer etc. complete as required. COST FOR 1 POINT
|
||||
A |
Materials |
|
|
|
|
4107 |
Fire alarm sounders (electronic) with facility to |
each |
1.00 |
312.50 |
312.50 |
|
make announcement, mounted in A.B.S. Box with hinged cover plate & suitable for operation with amplifier i/c line matching ttransformer etc. Cartage @1% of A |
|
|
|
3.13 |
B |
Total Labour |
|
|
|
315.63 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553.00 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
364.67 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
51.24 |
|
Total |
|
|
|
415.90 |
C |
Overhead & Profit @ 15% |
|
|
|
62.39 |
|
Total |
|
|
|
478.29 |
|
Rate of Each |
|
|
|
478.29 |
|
Say |
|
|
|
478.00 |
17.1.8 |
Supplying, installation, testing & commissioning fire alarm sounder with facility to make announcement, mounted in A.B.S. box with hinged cover plate & suitable for operation with amplifier i/c line matching transformer etc. complete as required.COST FOR 1 POINT |
||||
A |
Materials |
|
|
|
|
4109 |
4 Zone fire alarm control panel as per |
each |
1.00 |
4875.00 |
4875.00 |
|
IS: 2189 with backlit LCD Display |
|
|
|
|
|
Cartage @1% of A |
|
|
|
48.75 |
|
Total |
|
|
|
4923.75 |
B |
Labour |
|
|
|
|
1019 |
Electrician |
day |
1.25 |
673 |
841.25 |
1007 |
Khallasi |
day |
1.25 |
553.00 |
691.25 |
|
Total |
|
|
|
1532.50 |
|
Total of A+B Rs. |
|
|
|
6456.25 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
907.10 |
|
Total |
|
|
|
7363.35 |
C |
Overhead & Profit @ 15% |
|
|
|
1104.50 |
|
Total |
|
|
|
8467.86 |
|
Rate of Each |
|
|
|
8467.86 |
|
Say |
|
|
|
8468.00 |
17.1.9 |
???????Supplying, installation, testing & commissioning sector panel suitable for following zones, complete with visual indications for short circuit fault, open circuit fault, fire condition and all other standard facilities as per IS:2189 with mimic diagram for all area/zone covered, complete with all connections, interconnections as required. |
||||
A |
Materials |
|
|
|
|
4111 |
10 Zone fire alarm control panel as per IS: 2189 |
each |
1.00 |
9750.00 |
9750.00 |
|
with backlit LCD Display |
|
|
|
|
|
Cartage @1% of A |
|
|
|
97.50 |
|
Total |
|
|
|
9847.50 |
B |
Labour |
|
|
|
|
1019 |
Electrician |
day |
1.75 |
673 |
1177.75 |
1007 |
Khallasi |
day |
1.75 |
553.00 |
967.75 |
|
Total |
|
|
|
2145.50 |
|
Total of A+B Rs. |
|
|
|
11993.00 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
1685.02 |
|
Total |
|
|
|
13678.02 |
B |
Labour |
|
|||
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553.00 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
680.29 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
95.58 |
|
Total |
|
|
|
775.87 |
C |
Overhead & Profit @ 15% |
|
|
|
116.38 |
|
Total |
|
|
|
892.25 |
|
Rate of Each |
|
|
|
892.25 |
|
Say |
|
|
|
892.00 |
17.1.9.3 |
???????10 ZoneCOST FOR 1 POINT |
||||
A |
Materials |
|
|
|
|
4110 |
6 Zone fire alarm control panel as per IS: 2189 |
each |
1.00 |
7375.00 |
7375.00 |
|
with backlit LCD Display |
|
|
|
|
|
Cartage @1% of A |
|
|
|
73.75 |
|
Total |
|
|
|
7448.75 |
B |
Labour |
|
|
|
|
1019 |
Electrician |
day |
1.25 |
673 |
841.25 |
1007 |
Khallasi |
day |
1.25 |
553.00 |
691.25 |
|
Total |
|
|
|
1532.50 |
|
Total of A+B Rs. |
|
|
|
8981.25 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
1261.87 |
|
Total |
|
|
|
10243.12 |
C |
Overhead & Profit @ 15% |
|
|
|
1536.47 |
|
Total |
|
|
|
11779.58 |
|
Rate of Each |
|
|
|
11779.58 |
|
Say |
|
|
|
11780.00 |
17.1.11 |
???????Supplying, installation, testing & commissioning of main control and indicating panel made out of 16 SWG MS sheet to accommodate the following items duly powder coated in approved colour with louvers for ventilation, locking arrangement, audio and visual indication for fire alarm and public address system, monitoring system including connections, interconnections etc complete as required. |
||||
A 4112 |
Materials 10 zone control panel for fire alarm system with |
each |
1 |
47177.00 |
47177.00 |
|
following:- Total |
|
|
|
47177.00 |
|
Cartage @1% of A |
|
|
|
471.77 |
B |
Total Labour |
|
|
|
47648.77 |
1020 |
Electronic Technician |
day |
2 |
673 |
1346.00 |
1019 |
Electrician |
day |
3 |
673 |
2019.00 |
1007 |
Khallasi |
day |
3 |
553.00 |
1659.00 |
|
Total |
|
|
|
5024.00 |
|
Total of A+B Rs. |
|
|
|
52672.77 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
7400.52 |
|
Total |
|
|
|
60073.29 |
C |
Overhead & Profit @ 15% |
|
|
|
9010.99 |
|
Total |
|
|
|
69084.29 |
|
Rate of Each |
|
|
|
69084.29 |
|
Say |
|
|
|
69084.00 |
17.2.1 |
Supplying, installation, testing and commissioning of micro processor based intelligent addressable main fire alarm panel, central processing unit with the following loop modules and capable of supporting not less than 240 devices (including detectors) and minimum 120 detectors per loop and loop length up to 2 km, network communication card, minimum 320 character graphics/ LCD display with touch screen or other keypad and minimum 4000 events history log in the non volatile memory (EPROM), power supply unit (230 ± 5 % V, 50 hz), 48 hrs back-up with 24 volt sealed maintenance free batteries with automatic charger. The panel shall have facility to connect printer to printout log and facility to have seamless integration with analog/digital voice evacuation system ( which is part of the schedule of work under SH: PA System) and shall be complete with all accessories . The panel shall be compatible for IBMS system with open protocol Bacnet/ Modbus over IP complete as per specifications. |
||||
A |
Materials |
|
|
|
|
4113 |
6 zone control panel for fire alarm |
each |
1 |
32272.00 |
32272.00 |
|
system with following:- |
|
|
|
|
|
Total |
|
|
|
32272.00 |
|
Cartage @1% of A |
|
|
|
322.72 |
|
Total |
|
|
|
32594.72 |
B |
Labour |
|
|
|
|
1020 |
Electronic Technician |
day |
2 |
673.00 |
1346.00 |
1019 |
Electrician |
day |
2 |
673.00 |
1346.00 |
1007 |
Khallasi |
day |
2 |
553.00 |
1106.00 |
|
Total |
|
|
|
3798.00 |
|
Total of A+B Rs. |
|
|
|
36392.72 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
5113.18 |
|
Total |
|
|
|
41505.90 |
C |
Overhead & Profit @ 15% |
|
|
|
6225.88 |
|
Total |
|
|
|
47731.78 |
|
Rate of Each |
|
|
|
47731.78 |
|
Say |
|
|
|
47732.00 |
17.2.1.1 |
Two Loop Panel. |
||||
A |
Materials |
|
|
|
|
4114 |
10 Loop Control Panel having CPU with 640 |
each |
1.00 |
338000.00 |
338000.00 |
|
character display including backlite LCD display |
|
|
|
|
|
qwerty programming and operating manuals, |
|
|
|
|
|
supporting 1 to 10 signaling line circuits |
|
|
|
|
|
(upto 5 extendable cards & supporting 103 |
|
|
|
|
|
network modes) complete as required. |
|
|
|
|
|
Total |
|
|
|
338000.00 |
|
Cartage @1% of A |
|
|
|
3380.00 |
|
Total |
|
|
|
341380.00 |
B |
Labour |
|
|
|
|
1017 |
Engineer |
day |
2.00 |
1500.00 |
3000.00 |
1021 |
Technician |
day |
2.00 |
673.00 |
1346.00 |
1007 |
Khallasi |
day |
2.00 |
553.00 |
1106.00 |
|
Total |
|
|
|
5452.00 |
|
Total of A+B Rs. |
|
|
|
346832.00 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
48729.90 |
|
Total |
|
|
|
395561.90 |
C |
Overhead & Profit @ 15% |
|
|
|
59334.28 |
|
Total |
|
|
|
454896.18 |
|
Rate of Each |
|
|
|
454896.18 |
|
Say |
|
|
|
454896.00 |
17.2.2 |
Supplying, installation, testing & commissioning of central graphical fire alarm management system to centrally monitor and operate the fire alarm system complete as required.Details of cost for one each |
||||
A |
Materials |
|
|
|
|
4118 |
Intelligent photothermal detector |
each |
1.00 |
2099.50 |
2099.50 |
|
Total |
|
|
|
2099.50 |
|
Cartage @1% of A |
|
|
|
21.00 |
|
Total |
|
|
|
2120.50 |
B |
Labour |
|
|
|
|
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553.00 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
2169.54 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
304.82 |
|
Cartage @1% of A |
|
|
|
1776.50 |
|
Total |
|
|
|
179426.50 |
B |
Labour |
|
|
|
|
1017 |
Engineer |
day |
1.00 |
1500.00 |
1500.00 |
1021 |
Technician |
day |
1.00 |
673 |
673.00 |
1007 |
Khallasi |
day |
1.00 |
553.00 |
553.00 |
|
Total |
|
|
|
2726.00 |
|
Total of A+B Rs. |
|
|
|
182152.50 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
25592.43 |
|
Total |
|
|
|
207744.93 |
C |
Overhead & Profit @ 15% |
|
|
|
31161.74 |
|
Total |
|
|
|
238906.67 |
|
Rate of Each |
|
|
|
238906.67 |
|
Say |
|
|
|
238907.00 |
Supplying, installation, testing & commissioning of intelligent analog addressable photothermal detector complete with mounting base complete as required. Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4117 |
320 character LCD display repeater panel. |
each |
1.00 |
81000.00 |
81000.00 |
|
Total |
|
|
|
81000.00 |
|
Cartage @1% of A |
|
|
|
810.00 |
|
Total |
|
|
|
81810.00 |
B |
Labour |
|
|
|
|
1022 |
Software Engineer |
day |
0.25 |
2100 |
525.00 |
1021 |
Technician |
day |
0.25 |
673 |
168.25 |
1007 |
Khallasi |
day |
0.50 |
553.00 |
276.50 |
|
Total |
|
|
|
969.75 |
|
Total of A+B Rs. |
|
|
|
82779.75 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
11630.55 |
|
Total |
|
|
|
94410.30 |
C |
Overhead & Profit @ 15% |
|
|
|
14161.55 |
|
Total |
|
|
|
108571.85 |
|
Rate of Each |
|
|
|
108571.85 |
|
Say |
|
|
|
108572.00 |
???????Supplying, installation, testing & commisssioning of intelligent addressable programmable sounder complete as required. |
|||||
A |
Materials |
|
|
|
|
4119 |
Response indicator on surface/recessed |
each |
1.00 |
150.00 |
150.00 |
|
MS Box having two LED’s metallic covers |
|
|
|
|
|
complete with all connections etc. |
|
|
|
|
|
Total |
|
|
|
150.00 |
|
Cartage @1% of A |
|
|
|
1.50 |
|
Total |
|
|
|
151.50 |
B |
Labour |
|
|
|
|
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553.00 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
200.54 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
28.18 |
|
Total |
|
|
|
228.72 |
C |
Overhead & Profit @ 15% |
|
|
|
34.31 |
|
Total |
|
|
|
263.02 |
|
Rate of Each |
|
|
|
263.02 |
|
Say |
|
|
|
263.00 |
???????Supplying, installation, testing & commissioning of response indicator on surface/ recessed MS Box having two LED, metallic cover complete with all connections etc as required.Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4121 |
Cost of fault isolator complete with base |
each |
1.00 |
2291.40 |
2291.40 |
|
Total |
|
|
|
2291.40 |
|
Cartage @1% of A |
|
|
|
22.91 |
|
Total |
|
|
|
2314.31 |
B |
Labour |
|
|
|
|
1017 |
Engineer |
day |
0.08 |
1500.00 |
120.00 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553.00 |
22.12 |
|
Total |
|
|
|
169.04 |
|
Total of A+B Rs. |
|
|
|
2483.35 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
348.91 |
|
Total |
|
|
|
2832.27 |
C |
Overhead & Profit @ 15% |
|
|
|
424.84 |
|
Total |
|
|
|
3257.11 |
|
Rate of Each |
|
|
|
3257.11 |
|
Say |
|
|
|
3257.00 |
17.2.7 |
Supplying, installation, testing & commissioning of fault isolator complete with base as required.Details of cost for one each |
||||
A |
Materials |
|
|
|
|
4123 |
Cost of intelligent addressable thermal detector |
each |
1.00 |
1881.00 |
1881.00 |
|
Total |
|
|
|
1881.00 |
|
Cartage @1% of A |
|
|
|
18.81 |
|
Total |
|
|
|
1899.81 |
B |
Labour |
|
|
|
|
1017 |
Engineer |
day |
0.08 |
1500 |
120.00 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
169.04 |
B |
Total Labour |
|
|
|
1842.24 |
1017 |
Engineer |
day |
0.08 |
1500.00 |
120.00 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553.00 |
22.12 |
|
Total |
|
|
|
169.04 |
|
Total of A+B Rs. |
|
|
|
2011.28 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
282.58 |
|
Total |
|
|
|
2293.86 |
C |
Overhead & Profit @ 15% |
|
|
|
344.08 |
|
Total |
|
|
|
2637.94 |
|
Rate of Each |
|
|
|
2637.94 |
|
Say |
|
|
|
2638.00 |
installation, testing & commissioning of intelligent aspiration detector for area coverage of minimum 5000 sq. ft. complete as required. Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4122 |
Cost of intelligent aspiration detector |
each |
1.00 |
220000.00 |
220000.00 |
|
Total |
|
|
|
220000.00 |
|
Cartage @1% of A |
|
|
|
2200.00 |
|
Total |
|
|
|
222200.00 |
B |
Labour |
|
|
|
|
1017 |
Engineer |
day |
1.00 |
1500 |
1500.00 |
1019 |
Electrician |
day |
1.00 |
673 |
673.00 |
1007 |
Khallasi |
day |
1.00 |
553 |
553.00 |
|
Total |
|
|
|
2726.00 |
|
Total of A+B Rs. |
|
|
|
224926.00 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
31602.10 |
|
Total |
|
|
|
256528.10 |
C |
Overhead & Profit @ 15% |
|
|
|
38479.22 |
|
Total |
|
|
|
295007.32 |
|
Rate of Each |
|
|
|
295007.32 |
|
Say |
|
|
|
295007.00 |
installation, testing & commissioning of intelligent addressable thermal detector with rate of rise cum fixed tempreature thermistor complete with base as required. Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4123 |
Cost of intelligent addressable thermal detector |
each |
1.00 |
1881.00 |
1881.00 |
|
Total |
|
|
|
1881.00 |
|
Cartage @1% of A |
|
|
|
18.81 |
|
Total |
|
|
|
1899.81 |
B |
Labour |
|
|
|
|
1017 |
Engineer |
day |
0.08 |
1500 |
120.00 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total of A+B Rs. |
2068.85 |
|||
Add 12% GST (MF = 0.1405) |
290.67 |
||||
Total |
2359.52 |
||||
C |
Overhead & Profit @ 15% |
353.93 |
|||
|
Total |
2713.45 |
|||
|
Rate of Each |
2713.45 |
|||
|
Say |
2713.00 |
|||
installation, testing & commissioning of addressable fire control module complete as required. Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4124 |
Cost of control module |
each |
1.00 |
2090.00 |
2090.00 |
|
Total |
|
|
|
2090.00 |
|
Cartage @1% of A |
|
|
|
20.90 |
|
Total |
|
|
|
2110.90 |
B |
Labour |
|
|
|
|
1017 |
Engineer |
day |
0.08 |
1500 |
120.00 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
169.04 |
|
Total of A+B Rs. |
|
|
|
2279.94 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
320.33 |
|
Total |
|
|
|
2600.27 |
C |
Overhead & Profit @ 15% |
|
|
|
390.04 |
|
Total |
|
|
|
2990.31 |
|
Rate of Each |
|
|
|
2990.31 |
|
Say |
|
|
|
2990.00 |
Supplying installation, testing & commissioning of addressable phone control module complete as required.
|
|||||
4125 |
Cost of addressable fire phone control module Cartage @1% of A |
each | 1.00 | 2289.50 | 2289.50 |
B |
Total Labour |
|
|
|
2312.40 |
1017 |
Engineer |
day |
0.08 |
1500 |
120.00 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
169.04 |
|
Total of A+B Rs. |
|
|
|
2481.44 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
348.64 |
|
Total |
|
|
|
2830.08 |
C |
Overhead & Profit @ 15% |
|
|
|
424.51 |
|
Total |
|
|
|
3254.59 |
|
Rate of Each |
|
|
|
3254.59 |
|
Say |
|
|
|
3255.00 |
17.2.12Supplying, installation, testing & commissioning of addressable beam detector with short circuit isolator (inbuilt or seperate) complete with emitter and receiver including connections with remote test features etc complete as required. Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4126 |
Cost of addressable beam detector with |
each |
1.00 |
55100.00 |
55100.00 |
|
remote test features |
|
|
|
|
|
Cartage @1% of A |
|
|
|
551.00 |
|
Total |
|
|
|
55651.00 |
B |
Labour |
|
|
|
|
1017 |
Engineer |
day |
0.5 |
1500 |
750.00 |
1019 |
Electrician |
day |
0.5 |
673 |
336.50 |
1007 |
Khallasi |
day |
0.5 |
553 |
276.50 |
|
Total |
|
|
|
1363.00 |
|
Total of A+B Rs. |
|
|
|
57014.00 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
8010.47 |
|
Total |
|
|
|
65024.47 |
C |
Overhead & Profit @ 15% |
|
|
|
9753.67 |
|
Total |
|
|
|
74778.14 |
|
Rate of Each |
|
|
|
74778.14 |
|
Say |
|
|
|
74778.00 |
A |
Materials |
|
|
|
|
4127 |
Cost of intelligent duct detector unit with |
each |
1.00 |
5721.85 |
5721.85 |
|
photothermal detector complete with base |
|
|
|
|
|
Total |
|
|
|
5721.85 |
|
Cartage @1% of A |
|
|
|
57.22 |
|
Total |
|
|
|
5779.07 |
B |
Labour |
|
|
|
|
1017 |
Engineer |
day |
0.08 |
1500 |
120.00 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
169.04 |
|
Total of A+B Rs. |
|
|
|
5948.11 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
835.71 |
|
Total |
|
|
|
6783.82 |
C |
Overhead & Profit @ 15% |
|
|
|
1017.57 |
|
Total |
|
|
|
7801.39 |
|
Rate of Each |
|
|
|
7801.39 |
|
Say |
|
|
|
7801.00 |
installation, testing & commissioning of addressable manual call point complete as required. Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4128 |
Cost of manual call point |
each |
1.00 |
2745.50 |
2745.50 |
|
Cartage @1% of A |
|
|
|
27.46 |
|
Total |
|
|
|
2772.96 |
B |
Labour |
|
|
|
|
1017 |
Engineer |
day |
0.08 |
1500 |
120.00 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
169.04 |
|
Total of A+B Rs. |
2942.00 |
|||
Add 12% GST (MF = 0.1405) |
413.35 |
||||
Total |
3355.35 |
||||
C |
Overhead & Profit @ 15% |
503.30 |
|||
|
Total |
3858.65 |
|||
|
Rate of Each |
3858.65 |
|||
|
Say |
3859.00 |
|||
installation, testing & commissioning of addressable horn cum strobe complete as required. Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4129 |
Cost of Horn cum strobe |
each |
1.00 |
2470.00 |
2470.00 |
|
Cartage @1% of A |
|
|
|
24.70 |
|
Total |
|
|
|
2494.70 |
B |
Labour |
|
|
|
|
1017 |
Engineer |
day |
0.08 |
1500 |
120.00 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
169.04 |
|
Total of A+B Rs. |
|
|
|
2663.74 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
374.26 |
|
Total |
|
|
|
3038.00 |
C |
Overhead & Profit @ 15% |
|
|
|
455.70 |
|
Total |
|
|
|
3493.69 |
|
Rate of Each |
|
|
|
3493.69 |
|
Say |
|
|
|
3494.00 |
installation, testing & commissioning of addressable strobe complete as required. Details of cost for one each |
|||||
A 4130 |
Materials Cost of Strobe |
each |
1.00 |
2364.55 |
2364.55 |
|
Cartage @1% of A |
|
|
|
23.65 |
|
Total |
|
|
|
2388.20 |
B |
Labour |
|
|||
1017 |
Engineer |
day |
0.08 |
1500 |
120.00 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
169.04 |
|
Total of A+B Rs. |
|
|
|
2557.24 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
359.29 |
|
Total |
|
|
|
2916.53 |
C |
Overhead & Profit @ 15% |
|
|
|
437.48 |
|
Total |
|
|
|
3354.01 |
|
Rate of Each |
|
|
|
3354.01 |
|
Say |
|
|
|
3354.00 |
installation, testing & commissioning of fire fighter telephone handset complete as required. Details of cost for one each |
|||||
A 4131 |
Materials Cost of fire fighter telephone handset |
each |
1.00 |
4275.00 |
4275.00 |
|
Cartage @1% of A |
|
|
|
42.75 |
B |
Total Labour |
|
|
|
4317.75 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
4366.79 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
613.53 |
|
Total |
|
|
|
4980.32 |
C |
Overhead & Profit @ 15% |
|
|
|
747.05 |
|
Total |
|
|
|
5727.37 |
|
Rate of Each |
|
|
|
5727.37 |
|
Say |
|
|
|
5727.00 |
Supplying, installation, testing & commissioning of intelligent interface unit BACnet/ Modbus protocol i.e. supplying communication links between building management system and fire alarm control panel complete as required | |||||
A |
Materials |
|
|
|
|
4132 |
Intelligent interface unit BACnet protocol for |
each |
1.00 |
141550.00 |
141550.00 |
|
communication link between building |
|
|
|
|
|
management system and fire alarm |
|
|
|
|
|
control panel. |
|
|
|
|
|
Cartage @1% of A |
|
|
|
1415.50 |
|
Total |
|
|
|
142965.50 |
B |
Labour |
|
|
|
|
1017 |
Engineer |
day |
0.08 |
1500 |
120.00 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
169.04 |
|
Total of A+B Rs. |
|
|
|
143134.54 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
20110.40 |
|
Total |
|
|
|
163244.94 |
C |
Overhead & Profit @ 15% |
|
|
|
24486.74 |
|
Total |
|
|
|
187731.68 |
|
Rate of Each |
|
|
|
187731.68 |
|
Say |
|
|
|
187732.00 |
17.2.19Supplying, installation, testing & commissioning of fire fighter phone jack complete as required. Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4133 |
Cost of fire fighter phone jack |
each |
1.00 |
1149.50 |
1149.50 |
|
Cartage @1% of A |
|
|
|
11.50 |
B |
Total Labour |
|
|
|
1161.00 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
1210.04 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
170.01 |
C | Overhead & Profit @ 15% | 207.01 | |||
Total | 1587.05 | ||||
Rate of Each | 1587.05 | ||||
Say | 1587.00 | ||||
|
|||||
A |
Materials |
|
|
|
|
4134 |
Cost of 6 Zone, voice alarm controller with USB |
each |
1.00 |
95250.00 |
95250.00 |
|
Cartage @1% of A |
|
|
|
952.50 |
|
Total |
|
|
|
96202.50 |
B |
Labour |
|
|
|
|
1017 |
Engineer |
day |
0.08 |
1500 |
120.00 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
169.04 |
|
Total of A+B Rs. |
|
|
|
96371.54 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
13540.20 |
|
Total |
|
|
|
109911.74 |
C |
Overhead & Profit @ 15% |
|
|
|
16486.76 |
|
Total |
|
|
|
126398.50 |
|
Rate of Each |
|
|
|
126398.50 |
|
Say |
|
|
|
126399.00 |
installation, testing & commissioning of 1.5/3/6W ceiling speaker complete as required. Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4135 |
Cost of 1.5/3/6W Ceiling Speaker |
each |
1.00 |
670.00 |
670.00 |
|
Cartage @1% of A |
|
|
|
6.70 |
|
Total |
|
|
|
676.70 |
B |
Labour |
|
|
|
|
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
725.74 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
101.97 |
|
Total |
|
|
|
827.71 |
|
C Overhead & Profit @ 15% |
|
|
|
124.16 |
|
Total |
|
|
|
951.86 |
|
Rate of Each |
|
|
|
951.86 |
|
Say |
|
|
|
952.00 |
|
installation, testing & commissioning of 1.5/3/6W metal box ceiling/wall speakers complete as required. Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4136 |
Cost of 1.5/3/6W Metal Ceiling Speakers |
each |
1.00 |
1295.00 |
1295.00 |
|
Cartage @1% of A |
|
|
|
12.95 |
|
Total |
|
|
|
1307.95 |
B |
Labour |
|
|
|
|
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
1356.99 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
190.66 |
|
Total |
|
|
|
1547.65 |
C |
Overhead & Profit @ 15% |
|
|
|
232.15 |
|
Total |
|
|
|
1779.79 |
|
Rate of Each |
|
|
|
1779.79 |
|
Say |
|
|
|
1780.00 |
|
Materials | ||||
4137 | Cost of wall mounted loud speaker, 3/1.5 Watt in ABS enclosure | each 1.00 | 1775.00 | 1775.00 | |
B |
Total Labour |
|
|
|
1792.75 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
1841.79 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
258.77 |
|
Total |
|
|
|
2100.56 |
C |
Overhead & Profit @ 15% |
|
|
|
315.08 |
|
Total |
|
|
|
2415.65 |
|
Rate of Each |
|
|
|
2415.65 |
|
Say |
|
|
|
2416.00 |
17.3.5 Supplying, installation, testing & commissioning of 6 inches dia, 2 watts, 70/100 volts ceiling speaker complete as required. Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4138 |
Cost of 2 Watt, 70 Volts Ceiling Speaker |
each |
1.00 |
1330.00 |
1330.00 |
|
Cartage @1% of A |
|
|
|
13.30 |
B |
Total Labour |
|
|
|
1343.30 |
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
1392.34 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
195.62 |
|
Total |
|
|
|
1587.96 |
C |
Overhead & Profit @ 15% |
|
|
|
238.19 |
|
Total |
|
|
|
1826.16 |
|
Rate of Each |
|
|
|
1826.16 |
|
Say |
|
|
|
1826.00 |
installation, testing & commissioning of digital audio amplifier 50 Watt, 25V rms operating at 240 volt AC supply complete as required. Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4139 |
Cost of Digital audio amplifier 50 Watt |
each |
1.00 |
73000.00 |
73000.00 |
|
25VRMS operating of 240 Volt AC Supply. |
|
|
|
|
|
Cartage @1% of A |
|
|
|
730.00 |
|
Total |
|
|
|
73730.00 |
B |
Labour |
|
|
|
|
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
73779.04 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
10365.96 |
|
Total |
|
|
|
84145.00 |
C |
Overhead & Profit @ 15% |
|
|
|
12621.75 |
|
Total |
|
|
|
96766.74 |
|
Rate of Each |
|
|
|
96766.74 |
|
Say |
|
|
|
96767.00 |
???????installation, testing & commissioning of digital audio amplifier 75 Watt, 25V rms operating at 240 Volt AC Supply complete as required. Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4140 |
Cost of Digital audio amplifier 75 Watt |
each |
1.00 |
110000.00 |
110000.00 |
|
25VRMS operating of 240 Volt AC Supply. |
|
|
|
|
|
Cartage @1% of A |
|
|
|
1100.00 |
|
Total |
|
|
|
111100.00 |
B |
Labour |
|
|
|
|
1019 |
Electrician |
day |
0.04 |
673 |
26.92 |
1007 |
Khallasi |
day |
0.04 |
553 |
22.12 |
|
Total |
|
|
|
49.04 |
|
Total of A+B Rs. |
|
|
|
111149.04 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
15616.44 |
???????installation, testing & commissioning of exit point directional sound speaker with voice and integral audio amplifier with selectable sound pulse patterns complete as required. Details of cost for one each |
|||||
A |
Materials |
|
|
|
|
4141 |
Cost of Exit point directional sound speaker |
each |
1.00 |
7600.00 |
7600.00 |
|
with voice and integral audio amplifier with |
|
|
|
|
|
selectable sound pulse patterns |
|
|
|
|
|
|