FIRE DECTECTION



FIRE DETECTION AND ALARM SYSTEM (CHAPTER 17)

ICD

Description

Unit

Qty

Rate

Amount

No

 

 

 

 

(Rs.)

A

Materials

 

 

 

 

4101

Heat Detectors of electronic Rate of Rise cum

each

1.00

750.00

750.00

 

fixed tempreature (Dual Thermistor) type with

 

 

 

 

 

mounting base complete with all connection etc.

 

 

 

 

 

Cartage @1% of A

 

 

 

7.50

 

Total

 

 

 

757.50

B

Labour

 

 

 

 

1019

Electrician

day

0.04

673.00

26.92

1007

Khallasi

day

0.04

553.00

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

806.54

 

Add 12% GST (MF = 0.1405)

 

 

 

113.32

 

Total

 

 

 

919.86

C

Overhead & Profit @ 15%

 

 

 

137.98

 

Total

 

 

 

1057.84

 

Rate of Each

 

 

 

1057.84

 

Say

 

 

 

1058.00

17.1.2 Supplying, installation, testing & commissioning of smoke detector with builtin LED and mounting base complete with all connections etc. as required        

A

Materials

 

 

 

 

4103

Manual call boxes of MS Type in

each

1.00

300.00

300.00

 

surface/recess

 

 

 

 

 

with stainless steel chain & hammer assembly

 

 

 

 

 

complete with glass and push button etc.

 

 

 

 

 

Cartage @1% of A

 

 

 

3.00

 

Total

 

 

 

303.00

B

Labour

 

 

 

 

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553.00

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

352.04

 

Add 12% GST (MF = 0.1405)

 

 

 

49.46

 

Total

 

 

 

401.50

C

Overhead & Profit @ 15%

 

 

 

60.23

 

Total

 

 

 

461.73

 

Rate of Each

 

 

 

461.73

 

Say

 

 

 

462.00

17.1.3

Supplying, installation, testing & commissioning of manual call boxes of MS construction in surface/recess with stainless steel chain & hammer assembly complete with glass and push button etc. as required.

       

A

Materials

 

 

 

 

4105

Response indicator on surface/recessed MS

each

1.00

90.00

90.00

 

Box having two LED’s metallic covers complete

 

 

 

 

 

with all connections etc.

 

 

 

 

 

Cartage @1% of A

 

 

 

0.90

 

Total

 

 

 

90.90

B

Labour

 

 

 

 

1019

Electrician

day

0.04

673

26.92

B

Labour

 

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553.00

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

869.67

 

Add 12% GST (MF = 0.1405)

 

 

 

122.19

 

Total

 

 

 

991.85

C

Overhead & Profit @ 15%

 

 

 

148.78

 

Total

 

 

 

1140.63

 

Rate of Each

 

 

 

1140.63

 

Say

 

 

 

1141.00

17.1.5

Supplying, installation, testing & commissioning response indicator on surface/ recess MS box having two LEDs metallic cover complete with all connections etc. as required.COST FOR 1 POINT

       

A

Materials

 

 

 

 

4104

Manual call boxes of ABS Type in

each

1.00

250.00

250.00

 

surface/recess

 

 

 

 

 

with stainless steel chain & hammer assembly

 

 

 

 

 

complete with glass and push button etc.

 

 

 

 

 

Cartage @1% of A

 

 

 

2.50

 

Total

 

 

 

252.50

B

Labour

 

 

 

 

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553.00

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

301.54

 

Add 12% GST (MF = 0.1405)

 

 

 

42.37

 

Total

 

 

 

343.91

C

Overhead & Profit @ 15%

 

 

 

51.59

 

Total

 

 

 

395.49

 

Rate of Each

 

 

 

395.49

 

Say

 

 

 

395.00

 

Supplying, installation, testing & commissioning of manual call box of ABS type in surface/recess with stainless steel chain & hammer assembly complete with glass and push button etc. as required COST FOR 1 POINT

       

A

Materials

 

 

 

 

4106

Fire alarm sounders (electronic) with facility to

each

1.00

362.50

362.50

 

make announcement, mounted in M.S. Box

 

 

 

 

 

(16 SWG) with hinged cover plate & suitable for

 

 

 

 

 

operation with amplifier i/c line matching

 

 

 

 

 

ttransformer etc.

 

 

 

 

 

Cartage @1% of A

 

 

 

3.63

 

Total

 

 

 

366.13

B

Labour

 

 

 

 

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553.00

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

415.17

 

Add 12% GST (MF = 0.1405)

 

 

 

58.33

 

Total

 

 

 

473.50

C

Overhead & Profit @ 15%

 

 

 

71.02

 

Total

 

 

 

544.52

 

Rate of Each

 

 

 

544.52

 

Say

 

 

 

545.00

17.1.6

Supplying, installation, testing & commissioning fire alarm sounder with facility to make announcement, mounted in M.S. box (16 SWG) with hinged cover plate & suitable for operation with amplifier i/c line matching transformer etc. complete as required. COST FOR 1 POINT

 

       

A

Materials

 

 

 

 

4107

Fire alarm sounders (electronic) with facility to

each

1.00

312.50

312.50

 

make announcement, mounted in A.B.S. Box with hinged cover plate & suitable for operation with amplifier i/c line matching ttransformer etc.

Cartage @1% of A

 

 

 

 

 

 

3.13

 

B

Total

Labour

 

 

 

315.63

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553.00

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

364.67

 

Add 12% GST (MF = 0.1405)

 

 

 

51.24

 

Total

 

 

 

415.90

C

Overhead & Profit @ 15%

 

 

 

62.39

 

Total

 

 

 

478.29

 

Rate of Each

 

 

 

478.29

 

Say

 

 

 

478.00

17.1.8

Supplying, installation, testing & commissioning fire alarm sounder with facility to make announcement, mounted in A.B.S. box with hinged cover plate & suitable for operation with amplifier i/c line matching transformer etc. complete as required.COST FOR 1 POINT

       

A

Materials

 

 

 

 

4109

4 Zone fire alarm control panel as per

each

1.00

4875.00

4875.00

 

IS: 2189 with backlit LCD Display

 

 

 

 

 

Cartage @1% of A

 

 

 

48.75

 

Total

 

 

 

4923.75

B

Labour

 

 

 

 

1019

Electrician

day

1.25

673

841.25

1007

Khallasi

day

1.25

553.00

691.25

 

Total

 

 

 

1532.50

 

Total of A+B Rs.

 

 

 

6456.25

 

Add 12% GST (MF = 0.1405)

 

 

 

907.10

 

Total

 

 

 

7363.35

C

Overhead & Profit @ 15%

 

 

 

1104.50

 

Total

 

 

 

8467.86

 

Rate of Each

 

 

 

8467.86

 

Say

 

 

 

8468.00

17.1.9

???????Supplying, installation, testing & commissioning sector panel suitable for following zones, complete with visual indications for short circuit fault, open circuit fault, fire condition and all other standard facilities as per IS:2189 with mimic diagram for all area/zone covered, complete with all connections, interconnections as required.

       

A

Materials

 

 

 

 

4111

10 Zone fire alarm control panel as per IS: 2189

each

1.00

9750.00

9750.00

 

with backlit LCD Display

 

 

 

 

 

Cartage @1% of A

 

 

 

97.50

 

Total

 

 

 

9847.50

B

Labour

 

 

 

 

1019

Electrician

day

1.75

673

1177.75

1007

Khallasi

day

1.75

553.00

967.75

 

Total

 

 

 

2145.50

 

Total of A+B Rs.

 

 

 

11993.00

 

Add 12% GST (MF = 0.1405)

 

 

 

1685.02

 

Total

 

 

 

13678.02

B

Labour

 

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553.00

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

680.29

 

Add 12% GST (MF = 0.1405)

 

 

 

95.58

 

Total

 

 

 

775.87

C

Overhead & Profit @ 15%

 

 

 

116.38

 

Total

 

 

 

892.25

 

Rate of Each

 

 

 

892.25

 

Say

 

 

 

892.00

17.1.9.3

???????10 ZoneCOST FOR 1 POINT

       

A

Materials

 

 

 

 

4110

6 Zone fire alarm control panel as per IS: 2189

each

1.00

7375.00

7375.00

 

with backlit LCD Display

 

 

 

 

 

Cartage @1% of A

 

 

 

73.75

 

Total

 

 

 

7448.75

B

Labour

 

 

 

 

1019

Electrician

day

1.25

673

841.25

1007

Khallasi

day

1.25

553.00

691.25

 

Total

 

 

 

1532.50

 

Total of A+B Rs.

 

 

 

8981.25

 

Add 12% GST (MF = 0.1405)

 

 

 

1261.87

 

Total

 

 

 

10243.12

C

Overhead & Profit @ 15%

 

 

 

1536.47

 

Total

 

 

 

11779.58

 

Rate of Each

 

 

 

11779.58

 

Say

 

 

 

11780.00

17.1.11

???????Supplying, installation, testing & commissioning of main control and indicating panel made out of 16 SWG MS sheet to accommodate the following items duly powder coated in approved colour with louvers for ventilation, locking arrangement, audio and visual indication for fire alarm and public address system, monitoring system including connections, interconnections etc complete as required.

       

A

4112

Materials

10 zone control panel for fire alarm system with

 

each

 

1

 

47177.00

 

47177.00

 

following:-

Total

 

 

 

 

47177.00

 

Cartage @1% of A

 

 

 

471.77

 

B

Total

Labour

 

 

 

47648.77

1020

Electronic Technician

day

2

673

1346.00

1019

Electrician

day

3

673

2019.00

1007

Khallasi

day

3

553.00

1659.00

 

Total

 

 

 

5024.00

 

Total of A+B Rs.

 

 

 

52672.77

 

Add 12% GST (MF = 0.1405)

 

 

 

7400.52

 

Total

 

 

 

60073.29

C

Overhead & Profit @ 15%

 

 

 

9010.99

 

Total

 

 

 

69084.29

 

Rate of Each

 

 

 

69084.29

 

Say

 

 

 

69084.00

17.2.1

Supplying, installation, testing and commissioning of micro processor based intelligent addressable main fire alarm panel, central processing unit with the following loop modules and capable of supporting not less than 240 devices (including detectors) and minimum 120 detectors per loop and loop length up to 2 km, network communication card, minimum 320 character graphics/ LCD display with touch screen or other keypad and minimum 4000 events history log in the non volatile memory (EPROM), power supply unit (230 ± 5 % V, 50 hz), 48 hrs back-up with 24 volt sealed maintenance free batteries with automatic charger. The panel shall have facility to connect printer to printout log and facility to have seamless integration with analog/digital voice evacuation system ( which is part of the schedule of work under SH: PA System) and shall be complete with all accessories . The panel shall be compatible for IBMS system with open protocol Bacnet/ Modbus over IP complete as per specifications.

       

A

Materials

 

 

 

 

4113

6 zone control panel for fire alarm

each

1

32272.00

32272.00

 

system with following:-

 

 

 

 

 

Total

 

 

 

32272.00

 

Cartage @1% of A

 

 

 

322.72

 

Total

 

 

 

32594.72

B

Labour

 

 

 

 

1020

Electronic Technician

day

2

673.00

1346.00

1019

Electrician

day

2

673.00

1346.00

1007

Khallasi

day

2

553.00

1106.00

 

Total

 

 

 

3798.00

 

Total of A+B Rs.

 

 

 

36392.72

 

Add 12% GST (MF = 0.1405)

 

 

 

5113.18

 

Total

 

 

 

41505.90

C

Overhead & Profit @ 15%

 

 

 

6225.88

 

Total

 

 

 

47731.78

 

Rate of Each

 

 

 

47731.78

 

Say

 

 

 

47732.00

17.2.1.1

Two Loop Panel.

       

A

Materials

 

 

 

 

4114

10 Loop Control Panel having CPU with 640

each

1.00

338000.00

338000.00

 

character display including backlite LCD display

 

 

 

 

 

qwerty programming and operating manuals,

 

 

 

 

 

supporting 1 to 10 signaling line circuits

 

 

 

 

 

(upto 5 extendable cards & supporting 103

 

 

 

 

 

network modes) complete as required.

 

 

 

 

 

Total

 

 

 

338000.00

 

Cartage @1% of A

 

 

 

3380.00

 

Total

 

 

 

341380.00

B

Labour

 

 

 

 

1017

Engineer

day

2.00

1500.00

3000.00

1021

Technician

day

2.00

673.00

1346.00

1007

Khallasi

day

2.00

553.00

1106.00

 

Total

 

 

 

5452.00

 

Total of A+B Rs.

 

 

 

346832.00

 

Add 12% GST (MF = 0.1405)

 

 

 

48729.90

 

Total

 

 

 

395561.90

C

Overhead & Profit @ 15%

 

 

 

59334.28

 

Total

 

 

 

454896.18

 

Rate of Each

 

 

 

454896.18

 

Say

 

 

 

454896.00

17.2.2

Supplying, installation, testing & commissioning of central graphical fire alarm management system to centrally monitor and operate the fire alarm system complete as required.Details of cost for one each

       

A

Materials

 

 

 

 

4118

Intelligent photothermal detector

each

1.00

2099.50

2099.50

 

Total

 

 

 

2099.50

 

Cartage @1% of A

 

 

 

21.00

 

Total

 

 

 

2120.50

B

Labour

 

 

 

 

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553.00

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

2169.54

 

Add 12% GST (MF = 0.1405)

 

 

 

304.82

 

Cartage @1% of A

 

 

 

1776.50

 

Total

 

 

 

179426.50

B

Labour

 

 

 

 

1017

Engineer

day

1.00

1500.00

1500.00

1021

Technician

day

1.00

673

673.00

1007

Khallasi

day

1.00

553.00

553.00

 

Total

 

 

 

2726.00

 

Total of A+B Rs.

 

 

 

182152.50

 

Add 12% GST (MF = 0.1405)

 

 

 

25592.43

 

Total

 

 

 

207744.93

C

Overhead & Profit @ 15%

 

 

 

31161.74

 

Total

 

 

 

238906.67

 

Rate of Each

 

 

 

238906.67

 

Say

 

 

 

238907.00

 

Supplying, installation, testing & commissioning of intelligent analog addressable photothermal detector complete with mounting base complete as required. Details of cost for one each

       

A

Materials

 

 

 

 

4117

320 character LCD display repeater panel.

each

1.00

81000.00

81000.00

 

Total

 

 

 

81000.00

 

Cartage @1% of A

 

 

 

810.00

 

Total

 

 

 

81810.00

B

Labour

 

 

 

 

1022

Software Engineer

day

0.25

2100

525.00

1021

Technician

day

0.25

673

168.25

1007

Khallasi

day

0.50

553.00

276.50

 

Total

 

 

 

969.75

 

Total of A+B Rs.

 

 

 

82779.75

 

Add 12% GST (MF = 0.1405)

 

 

 

11630.55

 

Total

 

 

 

94410.30

C

Overhead & Profit @ 15%

 

 

 

14161.55

 

Total

 

 

 

108571.85

 

Rate of Each

 

 

 

108571.85

 

Say

 

 

 

108572.00

 

???????Supplying, installation, testing & commisssioning of intelligent addressable programmable sounder complete as required.

       

A

Materials

 

 

 

 

4119

Response indicator on surface/recessed

each

1.00

150.00

150.00

 

MS Box having two LED’s metallic covers

 

 

 

 

 

complete with all connections etc.

 

 

 

 

 

Total

 

 

 

150.00

 

Cartage @1% of A

 

 

 

1.50

 

Total

 

 

 

151.50

B

Labour

 

 

 

 

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553.00

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

200.54

 

Add 12% GST (MF = 0.1405)

 

 

 

28.18

 

Total

 

 

 

228.72

C

Overhead & Profit @ 15%

 

 

 

34.31

 

Total

 

 

 

263.02

 

Rate of Each

 

 

 

263.02

 

Say

 

 

 

263.00

 

???????Supplying, installation, testing & commissioning of response indicator on surface/ recessed MS Box having two LED, metallic cover complete with all connections etc as required.Details of cost for one each

       

A

Materials

 

 

 

 

4121

Cost of fault isolator complete with base

each

1.00

2291.40

2291.40

 

Total

 

 

 

2291.40

 

Cartage @1% of A

 

 

 

22.91

 

Total

 

 

 

2314.31

B

Labour

 

 

 

 

1017

Engineer

day

0.08

1500.00

120.00

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553.00

22.12

 

Total

 

 

 

169.04

 

Total of A+B Rs.

 

 

 

2483.35

 

Add 12% GST (MF = 0.1405)

 

 

 

348.91

 

Total

 

 

 

2832.27

C

Overhead & Profit @ 15%

 

 

 

424.84

 

Total

 

 

 

3257.11

 

Rate of Each

 

 

 

3257.11

 

Say

 

 

 

3257.00

17.2.7

Supplying, installation, testing & commissioning of fault isolator complete with base as required.Details of cost for one each

       

A

Materials

 

 

 

 

4123

Cost of intelligent addressable thermal detector

each

1.00

1881.00

1881.00

 

Total

 

 

 

1881.00

 

Cartage @1% of A

 

 

 

18.81

 

Total

 

 

 

1899.81

B

Labour

 

 

 

 

1017

Engineer

day

0.08

1500

120.00

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

169.04

 

B

Total

Labour

 

 

 

1842.24

1017

Engineer

day

0.08

1500.00

120.00

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553.00

22.12

 

Total

 

 

 

169.04

 

Total of A+B Rs.

 

 

 

2011.28

 

Add 12% GST (MF = 0.1405)

 

 

 

282.58

 

Total

 

 

 

2293.86

C

Overhead & Profit @ 15%

 

 

 

344.08

 

Total

 

 

 

2637.94

 

Rate of Each

 

 

 

2637.94

 

Say

 

 

 

2638.00

installation, testing & commissioning of intelligent aspiration detector for area coverage of minimum 5000 sq. ft. complete as required.

Details of cost for one each

A

Materials

 

 

 

 

4122

Cost of intelligent aspiration detector

each

1.00

220000.00

220000.00

 

Total

 

 

 

220000.00

 

Cartage @1% of A

 

 

 

2200.00

 

Total

 

 

 

222200.00

B

Labour

 

 

 

 

1017

Engineer

day

1.00

1500

1500.00

1019

Electrician

day

1.00

673

673.00

1007

Khallasi

day

1.00

553

553.00

 

Total

 

 

 

2726.00

 

Total of A+B Rs.

 

 

 

224926.00

 

Add 12% GST (MF = 0.1405)

 

 

 

31602.10

 

Total

 

 

 

256528.10

C

Overhead & Profit @ 15%

 

 

 

38479.22

 

Total

 

 

 

295007.32

 

Rate of Each

 

 

 

295007.32

 

Say

 

 

 

295007.00

installation, testing & commissioning of intelligent addressable thermal detector with rate of rise cum fixed tempreature thermistor complete with base as required.

Details of cost for one each

A

Materials

 

 

 

 

4123

Cost of intelligent addressable thermal detector

each

1.00

1881.00

1881.00

 

Total

 

 

 

1881.00

 

Cartage @1% of A

 

 

 

18.81

 

Total

 

 

 

1899.81

B

Labour

 

 

 

 

1017

Engineer

day

0.08

1500

120.00

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total of A+B Rs.

2068.85

     

Add 12% GST (MF = 0.1405)

290.67

     

Total

2359.52

     

C

Overhead & Profit @ 15%

353.93

     

 

Total

2713.45

     

 

Rate of Each

2713.45

     

 

Say

2713.00

     

installation, testing & commissioning of addressable fire control module complete as required.

Details of cost for one each

A

Materials

 

 

 

 

4124

Cost of control module

each

1.00

2090.00

2090.00

 

Total

 

 

 

2090.00

 

Cartage @1% of A

 

 

 

20.90

 

Total

 

 

 

2110.90

B

Labour

 

 

 

 

1017

Engineer

day

0.08

1500

120.00

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

169.04

 

Total of A+B Rs.

 

 

 

2279.94

 

Add 12% GST (MF = 0.1405)

 

 

 

320.33

 

Total

 

 

 

2600.27

C

Overhead & Profit @ 15%

 

 

 

390.04

 

Total

 

 

 

2990.31

 

Rate of Each

 

 

 

2990.31

 

Say

 

 

 

2990.00

Supplying installation, testing & commissioning of addressable phone control module complete as required.

 

4125

Cost of addressable fire phone control module

Cartage @1% of A
  each      1.00     2289.50  2289.50

 

B

Total

Labour

 

 

 

2312.40

1017

Engineer

day

0.08

1500

120.00

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

169.04

 

Total of A+B Rs.

 

 

 

2481.44

 

Add 12% GST (MF = 0.1405)

 

 

 

348.64

 

Total

 

 

 

2830.08

C

Overhead & Profit @ 15%

 

 

 

424.51

 

Total

 

 

 

3254.59

 

Rate of Each

 

 

 

3254.59

 

Say

 

 

 

3255.00

17.2.12Supplying, installation, testing & commissioning of addressable beam detector with short circuit isolator (inbuilt or seperate) complete with emitter and receiver including connections with remote test features etc complete as required.

Details of cost for one each

A

Materials

 

 

 

 

4126

Cost of addressable beam detector with

each

1.00

55100.00

55100.00

 

remote test features

 

 

 

 

 

Cartage @1% of A

 

 

 

551.00

 

Total

 

 

 

55651.00

B

Labour

 

 

 

 

1017

Engineer

day

0.5

1500

750.00

1019

Electrician

day

0.5

673

336.50

1007

Khallasi

day

0.5

553

276.50

 

Total

 

 

 

1363.00

 

Total of A+B Rs.

 

 

 

57014.00

 

Add 12% GST (MF = 0.1405)

 

 

 

8010.47

 

Total

 

 

 

65024.47

C

Overhead & Profit @ 15%

 

 

 

9753.67

 

Total

 

 

 

74778.14

 

Rate of Each

 

 

 

74778.14

 

Say

 

 

 

74778.00

A

Materials

 

 

 

 

4127

Cost of intelligent duct detector unit with

each

1.00

5721.85

5721.85

 

photothermal detector complete with base

 

 

 

 

 

Total

 

 

 

5721.85

 

Cartage @1% of A

 

 

 

57.22

 

Total

 

 

 

5779.07

B

Labour

 

 

 

 

1017

Engineer

day

0.08

1500

120.00

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

169.04

 

Total of A+B Rs.

 

 

 

5948.11

 

Add 12% GST (MF = 0.1405)

 

 

 

835.71

 

Total

 

 

 

6783.82

C

Overhead & Profit @ 15%

 

 

 

1017.57

 

Total

 

 

 

7801.39

 

Rate of Each

 

 

 

7801.39

 

Say

 

 

 

7801.00

installation, testing & commissioning of addressable manual call point complete as required.

Details of cost for one each

A

Materials

 

 

 

 

4128

Cost of manual call point

each

1.00

2745.50

2745.50

 

Cartage @1% of A

 

 

 

27.46

 

Total

 

 

 

2772.96

B

Labour

 

 

 

 

1017

Engineer

day

0.08

1500

120.00

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

169.04

 

Total of A+B Rs.

2942.00

     

Add 12% GST (MF = 0.1405)

413.35

     

Total

3355.35

     

C

Overhead & Profit @ 15%

503.30

     

 

Total

3858.65

     

 

Rate of Each

3858.65

     

 

Say

3859.00

     

installation, testing & commissioning of addressable horn cum strobe complete as required.

Details of cost for one each

A

Materials

 

 

 

 

4129

Cost of Horn cum strobe

each

1.00

2470.00

2470.00

 

Cartage @1% of A

 

 

 

24.70

 

Total

 

 

 

2494.70

B

Labour

 

 

 

 

1017

Engineer

day

0.08

1500

120.00

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

169.04

 

Total of A+B Rs.

 

 

 

2663.74

 

Add 12% GST (MF = 0.1405)

 

 

 

374.26

 

Total

 

 

 

3038.00

C

Overhead & Profit @ 15%

 

 

 

455.70

 

Total

 

 

 

3493.69

 

Rate of Each

 

 

 

3493.69

 

Say

 

 

 

3494.00

installation, testing & commissioning of addressable strobe complete as required.

Details of cost for one each

A

4130

Materials

Cost of Strobe

 

each

 

1.00

 

2364.55

 

2364.55

 

Cartage @1% of A

 

 

 

23.65

 

Total

 

 

 

2388.20

B

Labour

 

1017

Engineer

day

0.08

1500

120.00

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

169.04

 

Total of A+B Rs.

 

 

 

2557.24

 

Add 12% GST (MF = 0.1405)

 

 

 

359.29

 

Total

 

 

 

2916.53

C

Overhead & Profit @ 15%

 

 

 

437.48

 

Total

 

 

 

3354.01

 

Rate of Each

 

 

 

3354.01

 

Say

 

 

 

3354.00

installation, testing & commissioning of fire fighter telephone handset complete as required.

Details of cost for one each

A

4131

Materials

Cost of fire fighter telephone handset

 

each

 

1.00

 

4275.00

 

4275.00

 

Cartage @1% of A

 

 

 

42.75

 

B

Total

Labour

 

 

 

4317.75

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

4366.79

 

Add 12% GST (MF = 0.1405)

 

 

 

613.53

 

Total

 

 

 

4980.32

C

Overhead & Profit @ 15%

 

 

 

747.05

 

Total

 

 

 

5727.37

 

Rate of Each

 

 

 

5727.37

 

Say

 

 

 

5727.00

Supplying, installation, testing & commissioning of intelligent interface unit BACnet/ Modbus protocol i.e. supplying communication links between building management system and fire alarm control panel complete as required

A

Materials

 

 

 

 

4132

Intelligent interface unit BACnet protocol for

each

1.00

141550.00

141550.00

 

communication link between building

 

 

 

 

 

management system and fire alarm

 

 

 

 

 

control panel.

 

 

 

 

 

Cartage @1% of A

 

 

 

1415.50

 

Total

 

 

 

142965.50

B

Labour

 

 

 

 

1017

Engineer

day

0.08

1500

120.00

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

169.04

 

Total of A+B Rs.

 

 

 

143134.54

 

Add 12% GST (MF = 0.1405)

 

 

 

20110.40

 

Total

 

 

 

163244.94

C

Overhead & Profit @ 15%

 

 

 

24486.74

 

Total

 

 

 

187731.68

 

Rate of Each

 

 

 

187731.68

 

Say

 

 

 

187732.00

17.2.19Supplying, installation, testing & commissioning of fire fighter phone jack complete as required.

Details of cost for one each

A

Materials

 

 

 

 

4133

Cost of fire fighter phone jack

each

1.00

1149.50

1149.50

 

Cartage @1% of A

 

 

 

11.50

 

B

Total

Labour

 

 

 

1161.00

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

1210.04

 

Add 12% GST (MF = 0.1405)

 

 

 

170.01

C Overhead & Profit @ 15%       207.01
  Total       1587.05
  Rate of Each       1587.05
  Say       1587.00
  1. ADDRESS SYSTEM installation, testing & commissioning of 6 zone, voice alarm controller with USB, MP3 player (including 6 zone button paging station) with seamless integration facility with main fire alarm panel for voice evacuation complete as required.

 

A

Materials

 

 

 

 

4134

Cost of 6 Zone, voice alarm controller with USB

each

1.00

95250.00

95250.00

 

Cartage @1% of A

 

 

 

952.50

 

Total

 

 

 

96202.50

B

Labour

 

 

 

 

1017

Engineer

day

0.08

1500

120.00

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

169.04

 

Total of A+B Rs.

 

 

 

96371.54

 

Add 12% GST (MF = 0.1405)

 

 

 

13540.20

 

Total

 

 

 

109911.74

C

Overhead & Profit @ 15%

 

 

 

16486.76

 

Total

 

 

 

126398.50

 

Rate of Each

 

 

 

126398.50

 

Say

 

 

 

126399.00

installation, testing & commissioning of 1.5/3/6W ceiling speaker complete as required.

Details of cost for one each

A

Materials

 

 

 

 

4135

Cost of 1.5/3/6W Ceiling Speaker

each

1.00

670.00

670.00

 

Cartage @1% of A

 

 

 

6.70

 

Total

 

 

 

676.70

B

Labour

 

 

 

 

1019

Electrician

day

0.04

673

26.92

1007 Khallasi

day

0.04

553

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

725.74

 

Add 12% GST (MF = 0.1405)

 

 

 

101.97

 

Total

 

 

 

827.71

 

C        Overhead & Profit @ 15%

 

 

 

124.16

 

Total

 

 

 

951.86

 

Rate of Each

 

 

 

951.86

 

Say

 

 

 

952.00

 

installation, testing & commissioning of 1.5/3/6W metal box ceiling/wall speakers complete as required.

Details of cost for one each

A

Materials

 

 

 

 

4136

Cost of 1.5/3/6W Metal Ceiling Speakers

each

1.00

1295.00

1295.00

 

Cartage @1% of A

 

 

 

12.95

 

Total

 

 

 

1307.95

B

Labour

 

 

 

 

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

1356.99

 

Add 12% GST (MF = 0.1405)

 

 

 

190.66

 

Total

 

 

 

1547.65

C

Overhead & Profit @ 15%

 

 

 

232.15

 

Total

 

 

 

1779.79

 

Rate of Each

 

 

 

1779.79

 

Say

 

 

 

1780.00

A       

Materials        
4137 Cost of wall mounted loud speaker, 3/1.5             Watt in ABS enclosure each   1.00   1775.00   1775.00

 

B

Total

Labour

 

 

 

1792.75

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

1841.79

 

Add 12% GST (MF = 0.1405)

 

 

 

258.77

 

Total

 

 

 

2100.56

C

Overhead & Profit @ 15%

 

 

 

315.08

 

Total

 

 

 

2415.65

 

Rate of Each

 

 

 

2415.65

 

Say

 

 

 

2416.00

17.3.5 Supplying, installation, testing & commissioning of 6 inches dia, 2 watts, 70/100 volts ceiling speaker complete as required.

Details of cost for one each

A

Materials

 

 

 

 

4138

Cost of 2 Watt, 70 Volts Ceiling Speaker

each

1.00

1330.00

1330.00

 

Cartage @1% of A

 

 

 

13.30

 

B

Total

Labour

 

 

 

1343.30

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

1392.34

 

Add 12% GST (MF = 0.1405)

 

 

 

195.62

 

Total

 

 

 

1587.96

C

Overhead & Profit @ 15%

 

 

 

238.19

 

Total

 

 

 

1826.16

 

Rate of Each

 

 

 

1826.16

 

Say

 

 

 

1826.00

installation, testing & commissioning of digital audio amplifier 50 Watt, 25V rms operating at 240 volt AC supply complete as required.

Details of cost for one each

A

Materials

 

 

 

 

4139

Cost of Digital audio amplifier 50 Watt

each

1.00

73000.00

73000.00

 

25VRMS operating of 240 Volt AC Supply.

 

 

 

 

 

Cartage @1% of A

 

 

 

730.00

 

Total

 

 

 

73730.00

B

Labour

 

 

 

 

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

73779.04

 

Add 12% GST (MF = 0.1405)

 

 

 

10365.96

 

Total

 

 

 

84145.00

C

Overhead & Profit @ 15%

 

 

 

12621.75

 

Total

 

 

 

96766.74

 

Rate of Each

 

 

 

96766.74

 

Say

 

 

 

96767.00

???????installation, testing & commissioning of digital audio amplifier 75 Watt, 25V rms operating at 240 Volt AC Supply complete as required.

Details of cost for one each

A

Materials

 

 

 

 

4140

Cost of Digital audio amplifier 75 Watt

each

1.00

110000.00

110000.00

 

25VRMS operating of 240 Volt AC Supply.

 

 

 

 

 

Cartage @1% of A

 

 

 

1100.00

 

Total

 

 

 

111100.00

B

Labour

 

 

 

 

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

111149.04

 

Add 12% GST (MF = 0.1405)

 

 

 

15616.44

???????installation, testing & commissioning of exit point directional sound speaker with voice and integral audio amplifier with selectable sound pulse patterns complete as required.

Details of cost for one each

A

Materials

 

 

 

 

4141

Cost of Exit point directional sound speaker

each

1.00

7600.00

7600.00

 

with voice and integral audio amplifier with

 

 

 

 

 

selectable sound pulse patterns

 

 

 

 

 

Cartage @1% of A

 

 

 

76.00

 

Total

 

 

 

7676.00

B

Labour

 

 

 

 

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

7725.04

 

Add 12% GST (MF = 0.1405)

 

 

 

1085.37

 

Total

 

 

 

8810.41

C

Overhead & Profit @ 15%

 

 

 

1321.56

 

Total

 

 

 

10131.97

 

Rate of Each

 

 

 

10131.97

 

Say

 

 

 

10132.00

???????installation, testing & commissioning of Voice command keypad 6 zone, with microphone assembly complete as required.

Details of cost for one each

A

Materials

 

 

 

 

4142

Cost of Digital voice command keypad

each

1.00

37082.50

37082.50

4143

Micro phone assembly

each

1.00

24576.50

24576.50

 

Total

 

 

 

61659.00

 

Cartage @1% of A

 

 

 

616.59

 

B

Total

Labour

 

 

 

62275.59

1019

Electrician

day

0.04

673

26.92

1007

Khallasi

day

0.04

553

22.12

 

Total

 

 

 

49.04

 

Total of A+B Rs.

 

 

 

62324.63

 

Add 12% GST (MF = 0.1405)

 

 

 

8756.61

 

Total

 

 

 

71081.24

C

Overhead & Profit @ 15%

 

 

 

10662.19

 

Total

 

 

 

81743.43

 

Rate of Each

 

 

 

81743.43

 

Say

 

 

 

81743.00

 

17.4

 

ASPIRATION DETECTOR ACCESSORIES

 

 

 

 

17.4.1 Supply, installation, testing and commissioning of 25 mm Outer dia CPVC PIPE with end caps including making air sampling opening of appropriate dia on appropriate interval and all accessories as required,(rate for area protected in sqm).

Details of cost for 464.52 sqm

A