PROCEEDINGS OF THE DIRECTOR GENERAL
HIGHWAYS, GUINDY, CHENNAI-600025
PRESENT: THIRU .G. GOTHANDARAMAN M.E.
Proceedings No.2744 /TC/DG/2020 Dated 20.4.2020
Sub: Highway Department – Schedule of Rates with Basic Rates for the year 2020 -2021 for adoption in the preparation of estimates with effect from 20.4.2020 –Approved –Communicated –Regarding.
Ref: Engineer-in-chief ,WRD & Chief Engineer(General),PWD,Chennai-5, Proceedings No. HDO /Sr.DO-2 /SSR 2020-21 /20021/2020-1,dated 20.4.2020.
********
The committee for the Schedule of Rates has been approved the schedule of Rates with Basic rates(exclusive of all taxes and GST)for the year 2020-21 for highways department as below with effect from 20.04.2020.
Rates of Labour:
The Basic rates of labour pertaining to Highways Department for the year 2020-21 are increased in the range of 12% to 18% over that of the Schedule of rates with Basic rates of the year 2019-20 approved by the Highways Department for the categories of Bitumen Heat Master operator, Bitumen Raker man, Mini Hot mix Plant Operator, Bitumen Sprayer Man, Guniting Gun operator, Head Mazdoor, Guniting plant operator, Mazdoor-1 and Mazdoor-II as shown in Annexure-1
Rates of IRC Metals:
The basic rates of IRC metals pertaining to Highways Department for the year 2020-21are increased in the range of 2.29% to 2.50% over that of the Schedule of rates with Basic Rates for the year 2019-20 approved by Highways Department as Shown in Annexure-II.
Conveyance Charges:
The conveyance charges approached by the public works department are being adopted every year and the same conveyance table approved by the
Public works Department for the year 2020-21 has to be followed by Highways Department also.
General Conditions:
The general note applicable to highways department has been appended and the general note in Public works department Schedule of Rates for the year 2020-21 has also to be followed.
The present schedule of Rates consisting of basic rates of labour and IRC metals exclusively for Highways as in annexure and conveyance Table will come into force with effect from 20.04.2020.
The schedule of rates with basic Rates (exclusively of all taxes and GST)for the year 2020-21 for Highways Department approved by the committee is herewith forwarded to all Chief Engineers, Superintending Engineers and Divisional Engineers. They are requested to communicate the same to their sub-ordinate officers for adoption.
The receipt of this proceeding along with enclosures shall be acknowledged.
Encl: Schedule of Rates with basic rates for the year 2020-21.
Sd/-R.GOTHANDA RAMAN,
DG, HIGHWAYS
HIGHWAYS DEPARTMENT
Schedule of Rates for the year 2020-21
Annexure-I: Rates for labour
sr no | Description | Unit | Basic Rates Approved for the year 2020- 21(exclusive of all taxes and GST) (w.e.f.20.04.2020 |
I | Skilled Category | ||
1 | Bitumen Heat Master operator |
Day | 656.00 |
2. | Bitumen Raker Man | Day | 656.00 |
3. | Mini Hot Mix Plant operator | Day | 656.00 |
4. | Bitumen Sprayer man | Day | 630.00 |
5. | Guniting gun operator | Day | 598.00 |
II | Semi-skilled category | ||
6. | Head Mazdoor | Day | 584.00 |
7. | Guniting Plant operator | Day | 573.00 |
8. | Mazdoor I | Day | 567.00 |
III | Un-Skilled Category | ||
9 | Mazdoor II | Day | 460.00 |
HIGHWAYS DEPARTMENT
Schedule of rates for the year 2020-21
Annexure-II: Rates of Materials
Hard broken stone IRC Standard : Hand broken/ Machine Crushed
S.no | Description | Unit | Basic Rates approved for the year 2020- 21(exclusive of all taxes and GST) (w.e.f.20.04.2020) |
1 | 90mm,Size | One cum | 433.00 |
2 | 70mm,Size | One cum | 483.00 |
3 | 63mm,Size | One cum | 626.00 |
4 | 53 mm,Size | One cum | 762.00 |
5 | 46.50 mm,Size | One cum | 1025.00 |
6 | 45 mm,Size | One cum | 1025.00 |
7 | 37.50 mm,Size | One cum | 1046.00 |
8 | 26.50 mm,Size | One cum | 987.00 |
9 | 25 mm,Size | One cum | 987.00 |
10 | 22.40 mm,Size | One cum | 1435.00 |
11 | 13.20 mm,Size | One cum | 1330.00 |
12 | 11.20 mm,Size | One cum | 902.00 |
13 | 6.7/6/5.6 mm,Size | One cum | 669.00 |
14 | 4.75 mm,Size | One cum | 592.00 |
GENERAL CONDITIONS
(Note: This extra 15% for labour rates is applicable to only items of works which could necessarily be carried out during night with appropriate clause incorporated in the tender document).
sd/-R.GOTHANDARAMAN.,
DG, HIGHWAYS.
*****