HIRE CHARGES



Hire Charges for Machinery

 

Sl.

No.

 

Description

 

Unit

S.Rates for HireCharges for2019-20

 

Remarks

Machine

Activity

( Rupees)

1

2

3

4

6

7

1

Dozer( D 80 )

Spreading

 

Per Hour

 

As per I&CAD S.No 8

Cutting

Cleaning

2

Dozer( D 50 )

Spreading Cutting

Cleaning

Per Hour

1758.4

 

3

Mortor Grader

Clearing

 

Per Hour

 

3601.92

 

Spreading

GSB

WMM

4

Hydraulic Excavator

Soil Ordinary

 

Per Hour

 

As per I&CAD S.No.52

Soil Marshy

Soil unsuitable

5

Front end loader

Soil loading

Per Hour

1843.52

 

Aggregate loading

Per Hour

6

Tipper- 5.5 Cum

Transportation of soil, GSB,WMM, Hot mix etc

Per Hour

 

As per I&CAD

S.No.54

Per tonne

Km

8.00

 

7

Vibratory roller 8 tonne

Earth/Soil, GSB,

Per Hour

 

As per I&CAD

S.No.62

WMM

8

Smooth wheeled roller 8

tonne

Soil compaction ,BM

compaction

Per Hour

 

As per I&CAD

S.No.50

9

Water tanker 8 Kilolitre

Water transport

Per Hour

 

As per I&CAD

S.No.64

10

Water tanker 6 Kilolitre

Water transport

Per Hour

698.88

 

11

Tractor

Pulling

Per Hour

464.8

 

12

Tractor with rotavator

Scarifying

Per Hour

472.64

 

13

Tractor with ripper

attachment

Scarifying

Per Hour

568.232

 

14

Air Compressor

General purpose

Per Hour

 

As per I&CAD

S.No.2

15

Wet mix plant 60 TPH

Wet mix

Per Hour

1843.52

 

16

Mechanical broom Hydraulic

Surface cleaning

Per Hour

399.84

 

17

Bitumen Pressure Distributor

Applying bitumen tack

coat

Per Hour

1677.76

 

18

Emulsion Pressure

Distributor

Applying emulsion tack

coat

Per Hour

963.2

 

19

Hot mix Plant – 120 TPH

capacity

DBM/BM/SDC

Per Hour

31556

 

/Premix

20

Hot mix Plant – 100 TPH

capacity

DBM/BM/SDC

Per Hour

27071.52

 

/Premix

21

Hot mix Plant – 60 TPH

capacity

DBM/BM/SDC

Per Hour

24268.16

 

/Premix

22

Hot mix Plant – 40 to 60 TPH

capacity

DBM/BM/SDC

Per Hour

21414.4

 

/Premix

23

Paver Finisher Hydrostatic

with sensor control 100 TPH

DBM/BM/SDC

Per Hour

3426.6512

 

/Premix

24

PaverfinisherMechanical100

Paving of WMM, paving

of DLC

Per Hour

2518.88

 

25

Hydraulic Chip Spreader

Surface dressing

Per Hour

2875.04

 

26

Tandem Road roller

Rolling of Asphaltic

surface

Per Hour

1843.52

 

27

Pneumatic Road roller

Rolling of Asphaltic

surface

Per Hour

1436.96

 

28

Pot-Hole repair machine

Repair of pot-holes

Per Hour

946.4

 

29

Bitumen boiler oil fired

Bitumen Spraying

Per Hour

234.08

 

30

GSB Plant 50 Cum

Producing GSB

Per Hour

1280.16

 

31

Mastic Cooker

Mastic wearing coat

Per Hour

72.8

 

32

BatchingandMixingPlant(a)

30 Cum capacity

Concrete mixing

Per Hour

1379.728

As per I&CAD S.No.10

(b) 15 - 20 Cum capacity

Concrete mixing

Per Hour

 

33

Transit mixer

Transportation of

concrete mix

Per Hour

 

As per I&CAD

S.No.1

34

Concrete pump of 45 and 30

cum

Pumping of Concrete

Per Hour

899.36

 

35

Cranes

 

 

 

 

(a) 80 tonnes

Lifting purpose

Per Hour

1311.52

(b) 35 tonnes

885.92

(c) 3 tonnes

394.24

(d)Crane with grab bucket

0.75 cum

Well foundation

Per Hour

2419.2

(e)Crane with grab bucket 1

cum

Well foundation

Per Hour

3955.84

36

Concrete bucket

For pouring concrete

Per Hour

 

As per I&CAD

S.No.14

37

Kerb casting machine

Kerb making

Per Hour

348.32

 

38

Concrete mixer

Concrete mixing

Per Hour

 

As per I&CAD S.No.18

(a)0.28 cum

(b) 1.0 cum

Concrete mixing

Per Hour

726.88

39

Piling rig with bantonite

pump

0.75 m dia to 1.20 m dia

boring attachment

Per Hour

6132

 

40

Concrete paver finisher with

40 HP motor

Paving of concrete

surface

Per Hour

3248

 

41

Integrated stone crusher

Crushing of spalls 100

TPH

Per Hour

9757.44

 

Crushing of spalls 200

TPH

Per Hour

20573.28

42

Pre stressing jack with pump

and access

Stressing of steel wires/

stands

Per Hour

157.92

 

43

Generator

 

 

 

 

250 KVA

 

Generation of electric energy

Per Hour

2072

 

125 KVA

Per Hour

1478.4

 

100 KVA

Per Hour

1261.12

 

30 KVA

Per Hour

 

As per I&CAD

S.No.23

44

Pneumatic sinking of Plants

Pneumatic sinking of

wells

Per K.m.

62.72

 

45

Truck 5.5 cum per 10 tonnes

Material transport

Per Km.

 

As per I&CAD

S.No.58

46

Road marking machine

Road marking

Per Hour

124.32

 

47

Mobile slurry seal equipment

Mixing and laying slurry

seal

Per Hour

1261.12

 

48

Plate compacter

For compacting in

medians

Per Hour

53.76

 

49

Drilling equipment

For drilling

Per Hour

 

As per I&CAD

S.No.22

Note: The above hire charges of machinery & plant includes crew, oils, conveyance of machinery to site and all other incidentalcharges.

*****