IRRIGATION WORK ITEMS



BASIC DATA FOR IRRIGATION WORK ITEMS FOR THE YEAR 2019-20

STATEMENT OF RATES FOR MATERIALS

General Guide Lines for Revising Rates of Materials

    1. Average of the pevailing market rates, ignoring freak rates, is the criteria for fixing market rates formaterials
    2. The rates for materials is exclusive of Seignorage charges whereverapplicable
    3. The rates for materials, except those for which lead charges are admissible as per the statement of lead charges, shall be for allleads.
    4. The rates provided for useful rubble/stone chips from excavation shall be at dump yard

 

SI.

No.

 

Description

 

Unit

Scheduled Rates for the Year 2019-20

(Rs)

1

Acetylene gas

cum

350

2

Asphalt 80/100 Grade

Kg

42

3

Binding wire

Kg

55

4

Burnt stone slab 10 cm thick

sqm

250

5(a)

Ordinary Portland Cement (43/53 GRADE)

*(Note: As per Monthly rate fixed by SubCommittee)

tonne

5300

5(b)

Portland Pozzolona cement

*(Note as per monthly rate fixed by committee)

tonne

5100

5(c)

Portland Slag Cement

*(Note as per monthly rate fixed by sub-committee

tonne

4800

6

Chequered plate

Kg

53

7

Coarse aggregate 10-4.75 mm(excluding Seigniorage charges)

cum

760

8

Coarse aggregate 20-10 mm(excluding Seigniorage charges)

cum

990

9

Coarse aggregate 40-20 mm(excluding Seigniorage charges)

cum

890

10

Coarse aggregate 80-40 mm(excluding Seigniorage charges)

cum

510

11

Coir brush

Each

45

12

Copper sheet 16 SWG

kg

625

13

Coursed rubble stone 30 x 30 x 45 cm(excluding Seigniorage charges)

 

Each

24

14

Coursed rubble stone 30 x 30 x 60 cm(excluding Seigniorage charges)

Each

30

15

Curing Compound

Ltr

119

16

D - cord

Rm

9

17

Delay - noiseless trunk

Each

18

18

Detonating fuse coil

Rm

7

19

Detonating shock tube / Cord relays

Rm

32

20

Detonator delay type

Each

16

21

Detonator electric

Each

10

22

Detonator ordinary

Each

8

23

Empty cement bag

Each

6

24

Explosive ANFO

kg

58

25

Explosive ANFO high strength booster

kg

70

26

Explosive small dia ( Kelvex-220 or equivalent)

kg

75

27

Fine aggregate/ sand(un- screened) for Concrete, Filtering items,Filling & Blindage) (excluding Seigniorage charges)

 

cum

 

570

27(a)

Fine aggregate/Sand(unscreened) for filling(excluding Seigniorage charges)

 

cum

 

570

28

Fine aggregate /Sand (Screened) for Mortar,Plastering items and Sand blasting items(excluding Seigniorage charges)

 

cum

 

760

29

Geo-textile ( filter fabric ) 160 gsm

sqm

36

30

Geo-textile ( filter fabric ) 200 gsm

sqm

45

31

Geo-textile ( filter fabric ) 250 gsm

sqm

54

32

G I Pipe 100 mm dia B Class

Rm

710

33

G I Pipe 15 mm dia A class

Rm

85

34

G I pipe 25 mm dia A class

Rm

140

35

G I pipe 40 mm dia B class

Rm

225

36

G I pipe 50 mm dia A class

Rm

250

37

G I Pipe 80 mm dia B Class

Rm

460

38

G.I Bolts / Nuts and Washers

kg

90

39(a)

G.I sheet ( plain )

tonne

56000

39(b)

G.I Sheet corrugated

tonne

58000

40

Hariyala turfing sods

sqm

35

41

Hectometer stone one line dressed

Each

300

42

Hemp yarn

kg

75

43

Honne wood planks

cum

62000

44

Hume pipe with collar 150 mm dia (NP2) PH Rate

Rm

300

45

Hume pipe with collar 300 mm dia (NP2) PH Rate

Rm

530

46

J- Bolts 30 cm long

Each

38

47

Jungle wood planks

cum

26000

48

Khandki stone 15 to 20 cm height

Each

13

49

Khandki stone 20 to 25 cm height

Each

16

50

Khandki stone 25 to 30 cm height

Each

18

51

Kilometer stone one line dressed

Each

490

52

LDPE sheet ( Geo membrane ) 500 micron thick

sqm

90

53

LDPE sheet ( Geo membrane ) 750 micron thick

sqm

125

54

LDPE sheet ( Geo membrane ) 1000 micron thick

sqm

176

55

M S Bolts / Nuts / Washers

kg

75

56

Murum(including loading charges but excluding Seigniorage charges )

cum

225

57

Oxalic acid

Ltr

85

58

Oxygen gas

cum

46

59

PVC sealing strip

Rm

45

60

PVC water stopper 310 mm wide

Rm

415

61

PVC pipe of 100 mm dia

Rm

160

62

Reinforcement steel (HYSD/TMT ) from primary steel producers like TATA,SAIL,VSP,JSW, Shyam Steel and GOEL TMT *(Note: As per Monthly rate fixed by Sub- Committee)

 

tonne

 

44000

63

Resin bond Cement capsule

Each

50

64

Rough stone 20 x 20 x 75 cm ( Including Loading charges but excluding Seigniorage Charges)

Each

35

65(a)

Shahabad stone slab polished (including loading charges but excluding Seigniorage charges)

sqm

240

65(b)

Shahabad stone slab non-polished (including loading charges but excluding Seigniorage charges)

sqm

225

66

Stone chips (at dump yard/Spoil)(including loading charges but excluding Seigniorage charges)

cum

200

67

Stone chips ( at quarry )(including loading charges but excluding Seigniorage and Blasting charges)

cum

485

68

Structural steel angle / channel / beam / bars

Note: As per Monthly rate fixed by Sub-Committee

tonne

45000

69

Structural steel plate/flats (Including Loaing Charges)

Note: As per Monthly rate fixed by Sub-Committee

 

tonne

 

46000

70

Super Plasticizer (Conplast RP-264 or equivalent )

kg

58

71

Synthetic Enamel paint 1st quality

Ltr

200

72

Synthetic adhesive ( Resin + Hardener )

Kg

285

73

Tar felt joint filler board 12 mm thick

sqm

379

74

Tar felt joint filler board 20 mm thick

sqm

580

75

Through stones 20 x 20 x 30 to 45 cm (including loading charges but excluding Seigniorage charges)

Each

26

76

Through stones 25 x 25 x 45 to 60 cm long (including loading charges but excluding Seigniorage charges)

 

Each

 

45

77

Through stones 30 x 30 x 65 to 75 cm long (including loading charges but excluding Seigniorage charges)

 

Each

 

65

78

Un-coursed rubble stones ( at dump yard /Spoil) (including loading charges but excluding Seigniorage charges)

 

cum

 

180

79

Un-coursed rubble stones ( at quarry )( including loading charges but excluding Seigniorage charges)

cum

350

80

Water proofing compound

kg

95

81

Welding electrodes 4 mm dia

Each

11

82

Wire brush

Each

38

83

Wire mesh 20 gauge

sqm

220

84

Zinc chromate red Oxide primer paint (as per BIS)

Ltr

160

85

Inorganic zinc silicate

Ltr

480

86

Solvent less coal tar Epoxy Paint

Ltr

206

87

Zinc phosphate primer (as per BIS)

Ltr

170

88

Allkyd based iron oxide paint (as per BIS)

Ltr

151

89

a) Cost of HDPE (80mm dia)

Rm

170

89

b)Light black MS casing pipe 80mm dia (4mm thick)

Rm

574

90

Welded steel wire fabric 100X100X5 mm size

Kg

155

91

Protective Mastic

Ltr

401

92

Solventless coal tar epoxy (brown)

Ltr

206

93

Excavation of drain with Excavator

cum

40

94

Crushed stone sand/Rock sand 4.75mm to 2.36 mm as per IS 383 (1970) (excluding Seigniorage charges)

Cum

570

95

Fly ash conforming to IS: 3812 ( Part II & I)

Cum

72

96

Benching old embankment slopes 0.45 X 0.45 M

RM

6

97

Laying of Sand Bags in the stipulated places including cost of empty cement bag, sand, thread, stitching charges and labour charges etc., with 13.615% overhead charges and contractors profit.

 

per bag

 

30

98

Rough stone for revetment 225mm thick ( including Loading charges but excluding Seigniorage charges)

cum

210

99

Eradication of Weed growth from Drains, Canals by spraying Chemicals

sqm

3

100

Thinner

Ltr

75

101

Credit for excavated rock found suitable for use

Cum

210

102

Earth Cost or compensation for earth taken from private land (Excluding Seigniorage Charges)

Cum

65

 

MATERIALS FOR GATES & HOISTS

FOR THE YEAR 2019-20

 

GUIDELINES :

 

  1. For Cast steel/ Alloy steel/Forged Steel/Bronze, aluminium alloy components the rates shall be inclusive of cost of basic metal for these components, casting/forgingcharges, machining charges and applicable excise duty on finished alloycomponent
  2. For other materials the rates shall be prevailing marketrate

 

SI.

No.

 

Description

 

Unit

Scheduled Rates for the Year 2019-20

(Rs)

1

Alloy steel ( IS : 1570-carbon steel ) shafts

Kg

220

2

Alloy steel ( IS : 1570-stainless steel ) pins

Kg

380

3

Bolt / Nut / Washer ( hot dipped galvanized )

Kg

110

4

Bolt / Nut / Washer ( stainless steel )

Kg

312

5(a)

Bronze (IS:305)bearings/bushes

Kg

844

5(b)

Aluminium (IS:305)bearings/bushes

Kg

375

6

Cast iron blocks

Kg

72

7

Cast steel drums / gears

Kg

213

8

Cast steel pinions

Kg

200

9

Cast steel wheels / pulleys / hubs / rollers / retainers

Kg

160

10

Chemical for de-greasing/ derusting/phosphate coating

Ltr

135

11

Coal tar epoxy paint

Ltr

211

12

Forged steel hooks / shackles

Kg

235

13

MS pipe 200 / 300 mm dia

Kg

150

14

MS pipe 32 mm dia

Rm

174

15

MS pipe 25 mm dia

Rm

144

16(a)

Rubber bottom seal ( IS : 11855 ) 120 X 16 mm

Rm

700

16(b)

Rubber bottom seal ( IS : 11855 ) 120 X 20 mm

Rm

835

17(a)

Rubber side seal ( music note type Teflon claded ) ( IS : 11855

) 36Ø 113 X 14 mm

Rm

1350

17(b)

Rubber side seal ( music note type Teflon claded ) ( IS : 11855

) 50Ø 125 X 16 mm

Rm

2050

18(a)

Rubber side seal ( music note type uncladed ) ( IS : 11855 ) 36Ø 113 X 14 mm

Rm

1175

18(b)

Rubber side seal ( music note type uncladed ) ( IS : 11855 ) 50Ø 125 X 16 mm

Rm

1780

19

Rubber side seal Z-type ( IS : 11855 )

Rm

1700

20(a)

Rubber corner seal ( Teflon claded ) ( IS : 11855 ) 36Ø 113 X 14 mm

Each

2750

20(b)

Rubber corner seal ( Teflon claded ) ( IS : 11855 ) 50Ø 125 X 16 mm

Each

3600

21(a)

Rubber corner seal ( un claded ) ( IS : 11855 ) 36Ø 113 X 14 mm

Each

2532

21(b)

Rubber corner seal ( un claded ) ( IS : 11855 ) 50Ø 125 X 16 mm

Each

3376

22

Stainless steel plates / flats

Kg

260

23

Welding electrode 4 mm dia x 450 mm ( radiographic low hydrogen )

Each

17

24

Welding electrode 4 mm dia x 450 mm ( stainless steel )

Each

23

25

Wire rope 6x37 constn ( IS : 2266 )

Kg

203

26

Zinc

Kg

175

27

Zinc rich ( zinc content : 90 % ) epoxy primer

Ltr

587

 

DETAILS OF CAPITAL COST OF MACHINERY / EQUIPMENT

FOR THE YEAR 2019-20

GUIDELINES FOR FIXING CAPITAL COST OF MACHINERY/EQUIPMENT

The Capital cost of Machinery/Equipment shall be prevailing market rates. 2.The cost of transport vehicles/ equipment shall be exclusive of cost of tyres and tubes.The cost of drill rods/ drill bits/ air hose/ water hose/ road tax/ insurance charges and other consumable accesories shall not be included in the capitalcost

In cases where the capital cost of machinery/ equipment could not be collected through enquiries, the capital cost considered for previous year may be updated on the basis of average percentage increase/ decrease in the index for machinery published in the RBIBulletin

 

SI.

No.

 

Description

 

Unit

Scheduled Rates for the Year 2019-20

(Rs)

1

Agitator car / Transit mixer 2 cum ( excluding tyres )

Each

2260000

 

Tyres and tubes 6 sets

 

92500

2

Air compressor 5 cmm electric

Each

715000

3

Air compressor 7 cmm diesel

Each

960500

4

Air compressor 7 cmm electric

Each

870000

5

Air compressor 8.5 cmm diesel

Each

1088500

6

Air compressor 8.5 cmm electric

Each

1125000

7

Air compressor 15 cmm electric

Each

1375500

8

Angle Dozer 90 hp

Each

5500000

9

Batching plant 0.5 cum with accessories

Each

1245000

10

Batching plant 2 x 1.00 cum with accessories

Each

4290000

11

Batching plant 2 x 1.50 cum with accessories

Each

5650000

12

Bending machine

Each

555500

13

Clamp shell and hoisting ropes

Each

30500

14

Concrete bucket 1.5 cum

Each

56000

15

Concrete hand mixer 45/30 ltr

Each

16250

16

Concrete mixer 300/200 ltr(diesel)

Each

155000

17

Concrete mixer 300/200 ltr ( electric )

Each

149000

18

Concrete mixer 600/400 ltr(diesel)

Each

265500

19

Concrete mixer 600/400 ltr ( electric )

Each

260000

20

Concrete paver 100 Sqm / hr

Each

2400000

21

Convey mucker ( excluding tyres )

Each

3885000

21(a)

Tyres and tubes 6 sets

 

91500

22

Core drilling machine

Each

1152000

23

Diesel generating set 30 KVA

Each

535000

24

Diesel generating set 50 KVA

Each

750000

25

Diesel Loco 45 hp

Each

2135000

26

Dewatering pump 5 hp diesel

Each

34000

27

Dewatering pump 5 hp electric

Each

25200

28

Dewatering pump 10 hp diesel

Each

63000

29

Dewatering pump 10 hp electric

Each

57000

30

Dewatering pump 20 hp diesel

Each

205000

31

Dewatering pump 20 hp electric

Each

105000

32

Drifter

Each

1105000

33

Drilling jumbo ( excluding tyres )

Each

1350000

33(a)

Tyres and tubes 6 sets

 

92000

34

Dumper 4.5 cum ( excluding tyres )

Each

1550000

34(a)

Tyres and tubes 6 sets

 

93000

35

Geophysical Ele.resistivity meter

Each

505000

36

Grouting pump

Each

152000

37

Guniting / sand blasting equipment

Each

290000

38

Ice plant with accessories 30 t / day

Each

2400000

39

Jack hammer

Each

73000

40

Needle vibrator 40 mm petrol

Each

15000

41

Needle vibrator 40 mm electric

Each

14000

42

Needle vibrator 60 mm petrol

Each

16750

43

Needle vibrator 60 mm electric

Each

15500

44

Planing machine 4 m stroke

Each

785000

45

Plate shearing machine up to 12 mm

Each

455000

46

Pneumatic placer 0.5 cum

Each

593000

47

Pneumatic tamper

Each

86500

48

Pug cutting machine

Each

17500

49

Pusher leg

Each

52500

50

Road roller diesel 10 t

Each

930000

51

Shovel 0.50 cum 75 hp

Each

3800000

52

Shovel 0.85 cum 110 hp

Each

6400000

53

Stationery derrick crane 5 t

Each

655000

54

Tipper 5 cum ( excluding tyres )

Each

1650000

54(a)

Tyres and tubes 6 sets

 

92000

55

Tipping tub 1.5 cum

Each

262000

56

Tower crane 5 tonne

Each

7750000

57

Transformer 250 KVA

Each

450000

58

Truck 10 t ( excluding tyres )

Each

1500000

58(a)

Tyres and tubes 6 sets

 

92000

59

Truck mounted derrick crane 5 t ( excluding tyres )

Each

2260000

59(a)

Tyres and tubes 6 sets

 

93000

60

Upright drilling machine

Each

58000

61

Ventilation fan 20 hp

Each

265000

62

Vibratory pad foot roller 8 t

Each

2965000

63

Wagon drill

Each

652000

64

Water tanker 8000 ltr ( excluding tyres )

Each

1445000

64(a)

Tyres and tubes 6 sets

 

93000

65

Welding set

Each

48000

66

Winch 35 HP Electric

Each

380000

67

Hydraulic Truck Crane 30T

Each

15000000

67(a)

Tyres and tubes 6 sets

 

193000

68

Hydraulic Truck Crane 16T

Each

10200000

68(a)

Tyres and tubes 6 sets

 

195000

69

Heavy Duty Airless Spray Painting Equipment

Each

492000

ACCESSORIES TO MACHINERY / EQUIPMENT

FOR THE YEAR 2019-20

 

SI.

No.

 

Description

 

Unit

Scheduled Rates for the Year 2019-20

(Rs)

1

Casing shoe bit

Each

9100

2

Diamond core bit BX size

Each

9750

3

Diamond core bit NX size

Each

11250

4

Double tube core barrel

Each

12150

5

Extension drill rod with coupling sleeve

Rm

2215

6

Jack hammer drill rod 1.5 m

Each

4750

7

Jack hammer drill rod 2.5 m

Each

5900

8

Nozzle for Guniting / sand blasting gun

Each

710

9

Paving Cylinder

Each

24500

10

Rails 30R ( 30 kg / m )

tonne

47750

11

Reamer shell

Each

5100

12

T.C. Cross bit 50 mm dia

Each

4430

13

T.C. Cross bit 75 mm dia

Each

10350

14

T.C. Cross bit 100 mm dia

Each

12164

15

Tyres and Tubes for truck

Set

15700

16

Wire rope 16 mm dia

Rm

230

OTHER COSTS ON MATERIAL / MACHINERY / EQUIPMENT FOR THE YEAR 2019-20

  1. The rate provided for 'Sundries' (Lump sum provision for unquantified inputs in the data rates) shall be updated on the basis of general percentage crease/ decrease in the market rates or on the basis of R.B.I 'All Commodity'index
  2. The rate for Structural steel fabrication shall include cost of all materials (except Structural steel), machinery, labour and one coat of primerpainting
  3. Demand charges and electric power charges shall be as per prevailing TSCPDCL tariff
  4. Rate of interest on capital cost shall be as approved by Govt or other competent authority

 

SI.

No.

 

Description

 

Unit

Scheduled Rates for the Year 2019-20

(Rs)

1

Air hose 25 mm dia

Rm

155

2

Air hose 50 mm dia

Rm

230

3

Demand charges (HT-I : General-11 KVA category) on power supply

KVA/

month

390

4

Diesel

Ltr

72.33

5

Electric power (HT-VIII Category) including tax (1.5 times of the Tariff of HT-I(A): General-11 KVA category)

 

Kwhr

 

10

6

Excise duty on Gates / Hoist supplies

%

0

7

Insurance charges on machinery

% / annum

0

8

Interest on capital cost

% / annum

9

9

Lubricants

Ltr

240

10

Petrol

Ltr

76.08

11

Rivets

Kg

90

12

Road tax on transport vehicles

Rs./ annum

R.T.A

13

Shalimastic sealing compound

Kg

94

14

Shutter oil

Ltr

32

15

Structural steel fabrication

Kg

26

16

Sundries ( Lump sum for un quantified inputs )

LS

22

17

Water hose ( pressure ) 20 mm dia

Rm

150

18

Steel wedges

LS

17

19

Elbows / Nipple / Plugs etc.

LS

18

20

Soldering materials

LS

17

21

Steam circulation arrangement

LS

18

22

Fuel charges ( gas for heating )

LS

17

23

Vulcanizing materials

LS

18

24

Gas cutting set ( 2 Nos 15 m hose and nozzle unit )

Each

14800

25

Grease

Kg

240

26

Welding holder set ( cable / holder / gloves / mask etc )

Each

8200

27

Use rate of ropes

LS

150

 

OTHER COSTS ON MATERIAL / MACHINERY / EQUIPMENT

FOR THE YEAR 2019-20

 

SI.

No.

 

Description

 

Unit

Scheduled Rates for the Year 2019-20

(Rs)

1

Worm reducers

Each

195000

2

Electric motor 20 hp(Double Shaft)

Each

108000

3

Electric motor 17.5 hp(Double Shaft)

Each

75000

4

Electric motor 12.5 hp(Double Shaft)

Each

64500

5

Electric motor 5 hp(Double Shaft)

Each

30500

6

Electric motor 3 hp (Double Shaft)

Each

21000

7

Electric motor 2 hp (Double Shaft)

Each

11000

8

Floating shaft 300 mm dia

Kg

175

9

Manual operating system

Each

27500

10

Gate position indicator

Each

210000

11

Ele-magnetic brake

Each

33000

12

Electric cable / switch / control panel etc

LS

57500

13

Wire rope sockets

Each

4750

*****