CHAPTER 13 – HV OVER HEAD LINE WORK-2
13.13 |
Supplying and erection of three piece nonlinear resistor type lightning arrestorsuitable for 3 wire, 11 KV overhead lines with rated voltage 9 KV (rms) with a nominal discharge current rating of 5 KA and complete with galvanised clampingarrangement, G.I. bolts, nuts, washers etc. as required. |
||||
Details of cost for one No |
|||||
MATERIALS |
|||||
2650 |
3 piece lightning arrestor set for 11 KV O.H. lines complete with G.I. clamps bolts and nuts with washers |
set |
1.00 |
1620.00 |
1620.00 |
|
Total cost of materials |
|
|
|
1620.00 |
|
Cartage @ 1 % of A1 |
|
|
|
16.20 |
LABOUR |
|||||
1003 |
Lineman |
day |
0.25 |
673.00 |
168.25 |
1007 |
Khallasi |
day |
0.25 |
553.00 |
138.25 |
|
TOTAL |
|
|
|
1942.70 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
272.95 |
|
TOTAL |
|
|
|
2215.65 |
|
OVERHEADS & PROFIT @ 15 % |
|
|
|
332.35 |
|
TOTAL |
|
|
|
2548.00 |
|
Rate per Each |
|
|
|
2548.00 |
|
Say |
|
|
|
2548.00 |
13.14 |
Supplying and erection of galvanised stay set for 33 KV over head lines complete with 19/ 20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm thick, thimble, stay clamps, turn buckle ( 20 mm X 600 mm ), 7/ 4.00 mm dia G.I. stay wire and 33 KV strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required. |
||||
Details of cost for one No |
|||||
MATERIALS |
|||||
2601 |
Stay rod (1.8 M long, 19/20 mm dia.) with anchor plate 45 cm X 45 cm X 7.5 mm complete with thimble etc. |
set |
1.00 |
432.00 |
432.00 |
2602 |
Stay wire ( 7/4.00 mm dia.) = 8.40 + 0.25 (wastage @ 3%) = 8.65 kg |
kg |
8.65 |
37.00 |
320.05 |
|
2618 Stay clamp set 1.00 50.40 50.40 |
|
|
|
|
2604 |
Turn buckle ( 20 mm X 60 cm ) |
each |
1.00 |
158.00 |
158.00 |
2644 |
Strain insulator 33 KV |
each |
1.00 |
27.20 |
27.20 |
|
Total cost of materials |
|
|
|
987.65 |
|
Cartage @ 1 % of A1 |
|
|
|
9.88 |
|
LABOUR |
|
|
|
|
1003 |
Lineman |
day |
0.33 |
673.00 |
222.09 |
1007 |
Khallasi |
day |
1.33 |
553.00 |
735.49 |
|
TOTAL |
|
|
|
1955.11 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
274.69 |
|
TOTAL |
|
|
|
2229.80 |
|
OVERHEADS & PROFIT @ 15 % |
|
|
|
334.47 |
|
TOTAL |
|
|
|
2564.27 |
14.4 |
Excavation including refilling as required |
cum |
1.20 |
546.00 |
655.20 |
14.9 |
Cement concrete 1:3:6 (1 cement : 3 coarse sand :6 graded stone aggregate 40 mm nominal size ) |
cum |
0.28 |
6614.00 |
1851.92 |
|
TOTAL |
|
|
|
5071.39 |
|
Rate per Each |
|
|
|
5071.39 |
|
Say |
|
|
|
5071.00 |
13.15 |
Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) pole top bracket/ cross arm for single 33 KV over head line conductor complete with 50 mm X 6mm flat iron clamps, bolts and nuts including drilling holes for insulator pins, bolts, nuts, washers etc and painting with primer and finish paint as required. |
||||
Details of cost for one No |
|||||
MATERIALS |
|||||
2816 |
75 mm X 40 mm X 6 mm channel iron ( 7.14 kg/ mtr) = 1.15 mtr = 8.21kg + 0.16 (wastage @ 2%) kg 0.84 33.00 27.72 = 8.37 kg |
kg |
2.18 |
33.00 |
71.94 |
2813 |
50 mm X 6 mm flat iron = 0.82 + 0.02 (Wastage @ 2%) = 0.84kg |
||||
2867 |
16 mm X 50 mm bolts and nuts with washers |
set |
2.00 |
6.25 |
12.50 |
2936 |
Painting with primer and finish paint |
L.S. |
1.00 |
5.00 |
5.00 |
|
Total cost of materials |
|
|
|
117.16 |
|
Cartage @ 1 % of A1 |
|
|
|
1.17 |
LABOUR |
|||||
1005 |
Fitter, Grade 2 |
day |
0.12 |
612.00 |
73.44 |
1009 |
Blacksmith, Grade 2 |
day |
0.06 |
612.00 |
36.72 |
1084 |
Drilling holes |
each |
4.00 |
6.00 |
24.00 |
|
TOTAL |
|
|
|
352.03 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
49.46 |
|
TOTAL |
|
|
|
401.49 |
|
OVERHEADS & PROFIT @ 15 % |
|
|
|
60.22 |
|
TOTAL |
|
|
|
461.71 |
|
Rate per Each |
|
|
|
461.71 |
|
Say |
|
|
|
462.00 |
13.16 |
Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) cross arm for two 33 KV over head line conductors complete with 50 mm X 50 mm X 6 mm angle iron bracket welded to the channel iron and complete with 50 mm X 6mm M.S. flat iron clamps, bolts and nuts including drilling holes for insulator pins, bolts, nuts, washers etc and painting with primer and finish paint as required. |
||||
Details of cost for one No |
|||||
MATERIALS |
|||||
2816 |
75 mm X 40 mm X 6 mm channel iron ( 7.14 kg/ mtr) = 11.42 + 0.23 (Wastage @ 2%) = 11.65kg |
kg |
11.65 |
33.00 |
384.45 |
2807 |
50 mm X 50 mm X 6 mm angle iron = 11.75 + 0.24 (Wastage @ 2%) = 11.99kg |
kg |
11.99 |
33.00 |
395.67 |
2813 |
50 mm X 6 mm flat iron = 1.63 + 0.03 (Wastage @ 2%) = 1.66kg |
kg |
1.66 |
33.00 |
54.78 |
2867 |
16 mm X 50 mm bolts and nuts with washers |
set |
4.00 |
6.25 |
25.00 |
2936 |
Painting with primer and finish paint |
L.S. |
1.00 |
5.00 |
5.00 |
|
Total cost of materials |
|
|
|
864.90 |
|
Cartage @ 1 % of A1 |
|
|
|
8.65 |
LABOUR |
|||||
1005 |
Fitter, Grade 2 |
day |
0.25 |
612.00 |
153.00 |
1009 |
Blacksmith, Grade 2 |
day |
0.15 |
612.00 |
91.80 |
1007 |
Khallasi |
day |
0.40 |
553.00 |
221.20 |
1084 |
Drilling holes |
each |
8.00 |
6.00 |
48.00 |
1086 |
Welding charges |
mm |
200 |
0.50 |
100.00 |
|
TOTAL |
|
|
|
1487.55 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
209.00 |
|
TOTAL |
|
|
|
1696.55 |
|
OVERHEADS & PROFIT @ 15 % |
|
|
|
254.48 |
|
TOTAL |
|
|
|
1951.03 |
|
Rate per Each |
|
|
|
1951.03 |
|
Say |
|
|
|
1951.00 |
13.17 |
Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) V shape cross arm for two 33 KV over head line conductors complete with 50 mm X 6mm M.S. flatiron clamps, bolts and nuts including drilling holes for insulator pins, bolts and nuts etc and painting with primer and finish paint as required. |
||||
|
|||||
|
|||||
|
|||||
|
|||||
Details of cost for one No |
|||||
|
MATERIALS
|
|
|
|
|
2816 |
75 mm X 40 mm X 6 mm channel iron ( 7.14 kg/ mtr) = 13.26 + 0.27 (Wastage @ 2%) = 13.53kg |
kg |
13.53 |
33.00 |
446.49 |
2813 |
50 mm X 6 mm flat iron = 0.82 + 0.02 (Wastage @ 2%) = 0.84kg |
kg |
0.84 |
33.00 |
27.72 |
2867 |
16 mm X 50 mm bolts and nuts with washers |
set
|
2.00 |
6.25 |
12.50 |
2936 |
Painting with primer and finish paint |
L.S. |
1.00 |
5.00 |
5.00 |
|
Total cost of materials |
|
|
|
491.71 |
|
Cartage @ 1 % of A1 |
|
|
|
4.92 |
|
LABOUR |
|
|
|
|
1005 |
Fitter, Grade 2 |
day |
0.30 |
612.00 |
183.60 |
1009 |
Blacksmith, Grade 2 |
day |
0.20 |
612.00 |
122.40 |
1007 |
Khallasi |
day |
0.50 |
553.00 |
276.50 |
1086 |
Welding charges |
mm |
320 |
0.50 |
160.00 |
1084 |
Drilling holes |
each |
4.00 |
6.00 |
24.00 |
|
TOTAL |
|
|
|
1263.13 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
177.47 |
|
TOTAL |
|
|
|
1440.60 |
|
OVERHEADS & PROFIT @ 15 % |
|
|
|
216.09 |
|
TOTAL |
|
|
|
1656.69 |
|
Rate per Each |
|
|
|
1656.69 |
|
Say |
|
|
|
1657.00 |
13.18 |
Supplying of channel iron 100 mm X 50 mm X 6 mm (9.56 kg per metre), pole top bracket/ cross arm for single 33 KV over head line conductor complete with 50 mm X 6 mm M.S. flat iron clamps, bolts and nuts including drilling holes for insulator pins, bolts and nuts etc and painting with primer and finish paint as required. |
||||
Details of cost for one No |
|||||
MATERIALS |
|||||
2815 |
100 mm X 50 mm X 6 mm channel iron ( 9.56 kg/ mtr) = 2.87 + 0.06 (Wastage @ 2%) = 2.93kg |
kg |
2.93 |
33.00 |
96.69 |
2813 |
50 mm X 6 mm flat iron = 1.00 + 0.02 (Wastage @ 2%) = 1.02kg |
kg |
1.02 |
33.00 |
33.66 |
2867 |
16 mm X 50 mm bolts and nuts with washers |
set |
2.00 |
6.25 |
12.50 |
2936 |
Painting with primer and finish paint |
L.S. |
1.00 |
5.00 |
5.00 |
|
Total cost of materials |
|
|
|
147.85 |
|
Cartage @ 1 % of A1 |
|
|
|
1.48 |
|
LABOUR |
|
|
|
|
1005 |
Fitter, Grade 2 |
day |
0.15 |
612.00 |
91.80 |
1009 |
Blacksmith, Grade 2 |
day |
0.07 |
612.00 |
42.84 |
1007 |
Khallasi |
day |
0.22 |
553.00 |
121.66 |
1084 |
Drilling holes |
each |
4.00 |
6.00 |
24.00 |
|
TOTAL |
|
|
|
429.63 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
60.36 |
|
TOTAL |
|
|
|
489.99 |
|
OVERHEADS & PROFIT @ 15 % |
|
|
|
73.50 |
|
TOTAL |
|
|
|
563.49 |
|
Rate per Each |
|
|
|
563.49 |
|
Say |
|
|
|
563.00 |
13.19 |
Supplying of channel iron 100 mm X 50 mm X 6 mm (9.56 kg per metre) cross arm for two wire 33 KV over head line conductors complete with 50 mm X 50 mm X 6 mm angle iron bracket welded to the channel iron and complete with 50 mm X 6mm M.S. flat iron clamps, bolts and nuts including drilling holes for insulator pins/ fittings, bolts, nuts, washers etc and painting with primer and finish paint as required. |
||||
MATERIALS |
|||||
2815 |
100 mm X 50 mm X 6 mm channel iron ( 9.56 kg/ mtr) = 17.75 + 0.36 (Wastage @ 2%) = 18.11kg |
kg |
18.11 |
33.00 |
597.63 |
2807 |
50 mm X 50 mm X 6 mm angle iron = 11.75 + 0.24 (Wastage @ 2%) = 11.99kg |
kg |
11.99 |
33.00 |
395.67 |
2813 |
50 mm X 6 mm flat iron = 2.01 + 0.0402 (Wastage @ 2%) = 2.05kg |
kg |
2.05 |
33.00 |
67.65 |
2867 |
16 mm X 50 mm bolts and nuts with washers |
set |
4.00 |
6.25 |
25.00 |
2936 |
Painting with primer and finish paint |
L.S. |
1.00 |
5.00 |
5.00 |
|
Total cost of materials |
|
|
|
1090.95 |
|
Cartage @ 1 % of A1 |
|
|
|
10.91 |
LABOUR |
|||||
1005 |
Fitter, Grade 2 |
day |
0.35 |
612.00 |
214.20 |
1009 |
Blacksmith, Grade 2 |
day |
0.15 |
612.00 |
91.80 |
1007 |
Khallasi |
day |
0.50 |
553.00 |
276.50 |
1086 |
Welding charges |
mm |
200 |
0.50 |
100.00 |
1084 |
Drilling holes |
each |
8.00 |
6.00 |
48.00 |
|
TOTAL |
|
|
|
1832.36 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
257.45 |
|
TOTAL |
|
|
|
2089.81 |
|
OVERHEADS & PROFIT @ 15 % |
|
|
|
313.47 |
|
TOTAL |
|
|
|
2403.28 |
|
Rate per Each |
|
|
|
2403.28 |
|
Say |
|
|
|
2403.00 |
13.20 |
Supplying of channel iron 100 mm X 50 mm X 6 mm (9.56 kg per metre) V shape cross arm for two 33 KV over head line conductors complete with 50 mm X 6mm M.S. flat iron clamps, bolts and nuts including drilling holes for insulator pins, bolts, nuts, washers etc and painting with primer and finish paint as required. |
||||
Details of cost for one No |
|||||
MATERIALS |
|||||
2815 |
100 mm X 50 mm X 6 mm channel iron ( 9.56 kg/ mtr) = 17.75 + 0.36 (Wastage @ 2%) = 18.11kg |
kg |
18.11 |
33.00 |
597.63 |
2813 |
50 mm X 6 mm flat iron = 0.82 + 0.02 (Wastage @ 2%) = 0.84kg |
kg |
0.84 |
33.00 |
27.72 |
2867 |
16 mm X 50 mm bolts and nuts with washers |
set |
2.00 |
6.25 |
12.50 |
2936 |
Painting with primer and finish paint |
L.S. |
1.00 |
5.00 |
5.00 |
|
Total cost of materials |
|
|
|
642.85 |
|
Cartage @ 1 % of A1 |
|
|
|
6.43 |
LABOUR |
|||||
1005 |
Fitter, Grade 2 |
day |
0.30 |
612.00 |
183.60 |
1009 |
Blacksmith, Grade 2 |
day |
0.20 |
612.00 |
122.40 |
1007 |
Khallasi day 0.50 553.00 276.50 |
|
|
|
|
1086 |
Welding charges |
mm |
500 |
0.50 |
250.00 |
1084 |
Drilling holes |
each |
4.00 |
6.00 |
24.00 |
|
TOTAL |
|
|
|
1505.78 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
211.56 |
|
TOTAL |
|
|
|
1717.34 |
|
OVERHEADS & PROFIT @ 15 % |
|
|
|
257.60 |
|
TOTAL |
|
|
|
1974.94 |
|
Rate per Each |
|
|
|
1974.94 |
|
Say |
|
|
|
1975.00 |
13.21 |
Supplying of two lengths of channel iron 100 mm X 50 mm X 6 mm (9.56 kg per metre) double pole cross arm for three wire 33 KV over head line conductors complete with through bolts and nuts for clamping to the poles, 50 mm X 6 mm M.S. flats welded on one side to the channel iron and with bolts and nuts on the other side for tying the cross arms together, including drilling holes for insulator pins/ fittings, bolts, nuts, washers etc and painting with primer and finish paint as required. |
||||
Details of cost for one No |
|||||
MATERIALS |
|||||
2815 |
100 mm X 50 mm X 6 mm channel iron ( 9.56 kg/ mtr) = 43.98 + 0.8796 (Wastage @ 2%) = 44.86kg |
kg |
44.86 |
33.00 |
1480.38 |
2813 |
50 mm X 6 mm flat iron = 2.88 + 0.06 (Wastage @ 2%) = 2.94kg |
kg |
2.94 |
33.00 |
97.02 |
2870 |
16 mm X 150 mm bolts and nuts with washers |
set |
4.00 |
24.30 |
97.20 |
2868 |
16 mm X 40 mm bolts and nuts with washers
|
set |
12.00 |
6.30 |
75.60 |
2936 |
Painting with primer and finish paint |
L.S. |
1.00 |
5.00 |
5.00 |
|
Total cost of materials |
|
|
|
1755.20 |
|
Cartage @ 1 % of A1 |
|
|
|
17.55 |
LABOUR |
|||||
1005 |
Fitter, Grade 2 |
day |
0.60 |
612.00 |
367.20 |
1009 |
Blacksmith, Grade 2 |
day |
0.15 |
612.00 |
91.80 |
1007 |
Khallasi |
day |
2.70 |
553.00 |
1493.10 |
1084 |
Drilling holes |
each |
32.00 |
6.00 |
192.00 |
|
TOTAL |
|
|
|
3916.85 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
550.32 |
|
TOTAL |
|
|
|
4467.17 |
|
OVERHEADS & PROFIT @ 15 % |
|
|
|
670.08 |
|
TOTAL |
|
|
|
5137.25 |
|
Rate per Each |
|
|
|
5137.25 |
|
Say |
|
|
|
5137.00 |
|
|
|
|
|
|
13.22 |
Supplying and erection of a set of cross bracing frame work for 33 KV over head line double pole structure having four members fabricated out of 65 mm X 65 mm X 6 mm angle iron to form a rectangle of minimum size 2400 mm width X 2800 mm height complete with 50 mm X 6mm M.S. flat iron clamps, bolts and nuts including drilling holes for insulator pins, bolts, nuts, washers etc and painting with primer and finish paint as required. |
||||
Details of cost for one No |
|||||
MATERIALS |
|||||
2808 |
65 mm X 65 mm X 6 mm angle iron = 76.42 + 1.53 (Wastage @ 2%) = 77.95kg |
kg |
77.95 |
33.00 |
2572.35 |
2813 |
50 mm X 6 mm flat iron = 4.42 + 0.09 (Wastage @ 2%) = 4.51kg |
kg |
4.51 |
33.00 |
148.83 |
2867 |
16 mm X 50 mm bolts and nuts with washers |
set |
8.00 |
6.25 |
50.00 |
2868 |
16 mm X 40 mm bolts and nuts with washers |
set |
1.00 |
6.30 |
6.30 |
2936 |
Painting with primer and finish paint |
L.S |
1.00 |
5.00 |
5.00 |
|
Total cost of materials |
|
|
|
2782.48 |
|
Cartage @ 1 % of A1 |
|
|
|
27.82 |
|
LABOUR |
|
|
|
|
1003 |
Lineman |
day |
0.60 |
673.00 |
403.80 |
1005 |
Fitter, Grade 2 |
day |
0.50 |
612.00 |
306.00 |
1009 |
Blacksmith, Grade 2 |
day |
0.50 |
612.00 |
306.00 |
1007 |
Khallasi |
day |
3.40 |
553.00 |
1880.20 |
1084 |
Drilling holes |
each |
18.00 |
6.00 |
108.00 |
|
TOTAL |
|
|
|
5814.30 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
816.91 |
|
TOTAL |
|
|
|
6631.21 |
|
OVERHEADS & PROFIT @ 15 % |
|
|
|
994.68 |
|
TOTAL |
|
|
|
7625.89 |
|
Rate per Each |
|
|
|
7625.89 |
|
Say |
|
|
|
7626.00 |
13.23 |
Supplying and erection of 33 KV pin insulator complete with large steel head G.I. pin, nuts, washers etc. as required. |
||||
Details of cost for one No |
|||||
MATERIALS |
|||||
2648 |
33 KV pin insulator with pin washers |
set |
1.00 |
404.80 |
404.80 |
|
Total cost of materials |
|
|
|
404.80 |
|
Cartage @ 1 % of A1 |
|
|
|
4.05 |
LABOUR |
|||||
1003 |
Lineman |
day |
0.15 |
673.00 |
100.95 |
1007 |
Khallasi |
day |
0.15 |
553.00 |
82.95 |
|
TOTAL |
|
|
|
592.75 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
83.28 |
|
TOTAL |
|
|
|
676.03 |
|
OVERHEADS & PROFIT @ 15 % |
|
|
|
101.40 |
|
TOTAL |
|
|
|
777.43 |
|
Rate per Each |
|
|
|
777.43 |
|
Say |
|
|
|
777.00 |
13.24 |
Supplying and erection of a set of three 11 KV disc insulator for 33 KV over head lines with galvanised insulator fittings, ball and socket type and complete with galvanised strain clamps, bolts, nuts, washers etc. as required. |
||||
Details of cost for one No |
|||||
|
MATERIALS |
|
|
|
|
2646 |
11 KV disc insulator |
set |
3.00 |
404.80 |
1214.40 |
2649 |
Galvanised insulator hardware fitting ball and socket type with strain clamps, bolts, nuts and washers for 3 Nos 11 KV disk insulator |
set |
1.00 |
347.00 |
347.00 |
|
Total cost of materials |
|
|
|
1561.40 |
|
Cartage @ 1 % of A1 |
|
|
|
15.61 |
LABOUR |
|||||
1003 |
Lineman |
day |
0.25 |
673.00 |
168.25 |
1005 |
Fitter, Grade 2 |
day |
0.15 |
612.00 |
91.80 |
1007 |
Khallasi |
day |
0.40 |
553.00 |
221.20 |
|
TOTAL |
|
|
|
2058.26 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
289.19 |
|
TOTAL |
|
|
|
2347.45 |
|
OVERHEADS & PROFIT @ 15 % |
|
|
|
352.12 |
|
TOTAL |
|
|
|
2699.57 |
|
Rate per Each |
|
|
|
2699.57 |
|
Say |
|
|
|
2700.00 |
13.25 |
Supplying and erection of single piece nonlinear resistor type lightning arrestor suitable for 3 wire, 33 KV overhead lines with rated voltage 30 KV (rms) with a nominal discharge current rating of 10 KA (station class) and complete with galvanised clamping arrangement, G.I. bolts, nuts, washers etc. as required. |
||||
|
|||||
|
|||||
|
|||||
|
|||||
|
|||||
Details of cost for one No |
|||||
MATERIALS |
|||||
2651 |
Single piece lightning arrestor set for 33 KV O.H. lines complete with G.I. clamps bolts and nuts with washers |
set |
1.00 |
17173.00 |
12600.00 |
|
Total cost of materials |
|
|
|
12600.00 |
|
Cartage @ 1 % of A1 |
|
|
|
126.00 |
LABOUR |
|||||
1003 |
Lineman |
day |
0.30 |
673.00 |
201.90 |
1007 |
Khallasi |
day |
0.30 |
553.00 |
165.90 |
|
TOTAL |
|
|
|
13093.80 |
|
Add 12% GST (MF = 0.1405) |
|
|
|
1839.68 |
|
TOTAL |
|
|
|
14933.48 |
|
OVERHEADS & PROFIT @ 15 % |
|
|
|
2240.02 |
|
TOTAL |
|
|
|
17173.50 |
|
Rate per Each |
|
|
|
17173.50 |
|
Say |
|
|
|
17174.00 |
****