Materials and Labour



MATERIALS AND LABOUR (SECTION II)

1. Building (A) Materials delivered and stacked at site

 

tem No.

Description of Items

 

Rate (Rs)

Unit

Kolkata/ 24 Pgs (N & S)/Area of Kalyani Sub Div

Purba Bardhaman

Paschim Bardhaman

Purulia

Birbhum

Howrah/ Hoogly

Purba Medinipur

Paschim Medinipur/Jhargram

Bankura

Nadia excluding area of Kalyani Sub Div

Murshidabad

Malda

Darjeeling, Kalimpong except plains of Siliguri Sub Divn.

Jalpaiguri,Alipurduar, plains of Siliguri Sub Divn. & Area of Haldibari PS

Coochbehar excluding the area of Haldibari PS

Uttar/ Dakshin Dinajpur Dist.

REMARKS

1

(a)

1st Class Brick

(kiln burnt)

100

Nos

8095

7381

6190

6190

8095

8095

8095

6762

7381

7381

7381

10000

7381

7381

7381

 

1.

(b)

2nd Class Bricks (kiln burnt)

1000

Nos

5762

5143

4048

4048

5762

5476

5476

4571

5333

5333

5238

7190

5143

5238

5333

 

2

(a)

1st Class Picked Jhama Bricks

1000

Nos

8000

7286

5762

5762

8048

7905

7905

6571

7286

7286

7286

9810

7286

7286

7286

 

 

(b)

Flyash Bricks(Modular)

1000

Nos

5524

5238

5238

5524

5429

5429

5238

5429

5238

5238

 

 

 

 

 

 

 

(c)

1 st Class Modular Bricks

1000

Nos

5037

 

 

 

5037

 

 

 

 

 

 

 

 

 

 

 

3

(a)

Jhama Bats

1

M3

1211

897

 

813

1211

1058

1058

 

897

897

897

 

897

847

847

 

 

(b)

Jhama metal (kiln burnt) 50mm. to 65mm.

1

M3

1667

1162

 

1162

1667

1429

1429

 

1162

1162

1429

 

1429

1429

1429

 

4

 

1st class bats

1

M3

1162

952

827

857

1162

1114

1095

857

952

952

1000

2219

1000

1000

1000

 

5.

 

Ordinary bats

1

M3

720

593

593

593

720

720

677

593

635

618

635

1524

635

635

635

 

6

(a)

Sand coarse (Finenses moduls)

1

M3

1095

524

429

429

857

638

571

429

762

762

667

1324

619

619

619

 

 

(b)

Medium Sand (Fineses Moduls 1.8 to 2)

1

M3

905

381

333

333

667

524

381

333

667

619

571

1238

524

524

667

 

 

(c)

Fine Sand

1

M3

762

333

286

286

524

476

305

300

524

476

476

1095

410

410

381

 

 

(d)

Sliver Sand

1

M3

667

317

 

 

476

333

190

190

429

381

238

 

314

238

286

 

7

1

1st Class Raniganj pattern Tiles

1

Each

12

11

9

13

12

12

12

12

9

8

8

14

88

8

8

 

8

 

Surki

1

M3

1211

1024

885

885

1211

1117

1310

1058

1058

1016

978

1397

1058

1016

1016

 

9

 

Lime

1

M3

4279

3755

3755

3755

4279

3755

3755

3755

3755

3755

3755

4803

3755

3755

3755

 

10

 

Trap stone

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(a)

Boulder

1

M3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(b)

40 mm size

1

M3

 

 

 

 

 

 

 

 

 

 

832

 

 

 

 

 

 

©

25 mm size

1

M3

 

 

 

 

 

 

 

 

 

 

884

 

 

 

 

 

 

(d)

20 mm Size

1

M3

 

 

 

 

 

 

 

 

 

 

933

 

 

 

 

 

 

(e)

12 mm Size

1

`M3

 

 

 

 

 

 

 

 

 

 

884

 

 

 

 

 

 

(f)

10 mm Size

1

M3

 

 

 

 

 

 

 

 

 

 

832

 

 

 

 

 

 

(g)

6 mm Size

1

 M3

 

 

 

 

 

 

 

 

 

 

808

 

 

 

 

 

11

 

TrapStone Panchani Variety

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(a)

Boulder

1

M3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(b)

40 mm size

1

M3

 

 

1357

 

 

 

 

 

 

 

 

 

 

 

 

 

 

©

25 mm size

1

M3

 

 

1312

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(d)

20 mm Size

1

M3

 

 

1387

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(e)

12 mm Size

1

`M3

 

 

1033

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(f)

10 mm Size

1

M3

 

 

1069

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(g)

6 mm Size

1

 M3

 

 

952

 

 

 

 

 

 

 

 

 

 

 

 

 

12

 

Trap stone Chandil Variety

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(a)

Boulder

1

`M3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(b)

40 mm size

1

`M3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

©

25 mm size

1

`M3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(d)

20 mm Size

1

`M3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(e)

12 mm Size

1

M3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(f)

10 mm Size

1

M3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(g)

6 mm Size

1

M3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

13

 

Local Hard Black Stone (Crusher Broken) Midnapore  E, Midnapore W, Bankura)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(a)

40 mm size

1

M3

 

 

 

 

1010

960

889

 

 

 

 

 

 

 

 

 

 

 

(b)

25 mm size

1

M3

 

 

 

 

1061

1010

960

 

 

 

 

 

 

 

 

 

 

 

©

20 mm Size

1

M3

 

 

 

 

1162

1110

1040

 

 

 

 

 

 

 

 

 

 

 

(d)

12 mm Size

1

`M3

 

 

 

 

1034

985

909

 

 

 

 

 

 

 

 

 

 

 

(e)

10 mm Size

1

M3

 

 

 

 

832

731

707

 

 

 

 

 

 

 

 

 

 

 

(f)

6 mm Size

1

 M3

 

 

 

 

656

606

520

 

 

 

 

 

 

 

 

 

 

14

 

32 mm down graded gravel (Midnapore E, midnapore W, Bankuran)

 

 

 

 

 

 

707

606

556

 

 

 

 

 

 

 

 

 

 

15

 

Damodarpur Gravel (Bankuran)

1

 M3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16

 

Stone metal 30 mm down of N. Bengal variety

1

 M3

 

 

 

 

 

 

 

 

 

 

 

1644

902

902

1008

 

 

17

 

Stone ballst 40 mm down of N. Bengal variety

1

M3

 

 

 

 

 

 

 

 

 

 

 

1590

848

848

954

 

 

18

 

Stone Boulder 150 mm of N. Bengal variety

1

M3

 

 

 

 

 

 

 

 

 

 

 

1272

584

584

848

 

 

19

 

30 mm down graded Shingles of N. Bengal variety

1

M3

 

 

 

 

 

 

 

 

 

 

 

1241

551

551

796

 

 

20

 

Bazree (N. Bengal variety)

1

M3

 

 

 

 

 

 

 

 

 

 

 

1484

626

690

902

 

 

21

 

Grit ( N. Bengal variety)

1

M3

 

 

 

 

 

 

 

 

 

 

 

1326

530

530

742

 

 

22

 

Fly Ash Bricks(Traditional)

1000

No

6500

6000

6000

6000

6000

6000

6000

6500

6500

6000

6000

 

 

 

 

 

 

23

 

Laterite Boulder (at Quarry)

Cum

 

 

 

 

 

 

 

255

255

 

 

 

 

 

 

 

 

 

24

 

Moorum (ar Quarry)

Cum

 

 

 

117

117

 

 

117

117

 

 

 

 

 

 

 

 

 

Note:

1. The above rates are inclusive of all charges such as Royalty, Supervision Charges, etc. and also include allowance for sinkage, as applicable, and/or shrinkage and 10% Contractor’s Profit but exclusive of GST.

2. Rates for Sand and Brick/ Jhama/ Bats items are complete rates at site and no other costs need to be considered. For other items, necessary loading-unloading & carriage charges are admissible

3. 3. Laterrite Boulder &Moorum are available in the districts as mentioned in Sl. No. – 23 & 24 respectively, remaining districts may add necessary carriage cost as applicable.

tem No.

Description of Items

Rate (Rs)

Unit

Kolkata / 24 Pgs (N & S) /Area of Kalyani Sub Div

Purba Bardhaman

Paschim Bardhaman

Purulia

Birbhum

Howrah/ Hoogly

Purba Medinipur

Paschim Medinipur/Jhargram

Bankura

Nadia excluding area of Kalyani Sub Div

Murshidabad

Malda

Darjeeling, Kalimpong except plains of Siliguri Sub Divn.

Jalpaiguri,Alipurduar, plains of Siliguri Sub Divn. & Area of Haldibari PS

Coochbehar excluding the area of Haldibari PS

Uttar/ Dakshin Dinajpur Dist.

REMARKS

 

ZONE

 

(A)

(A)

(B)

(B)

(A)

(A)

(A)

(B)

(B)

(B)

(B)

(A)

(A)

(B)

(B)

 

1)

Mason (Head)

Each

326

326

326

326

326

326

326

326

326

326

326

326

326

326

326

 

2)

Mason (Ordinary)

Each

296

296

296

296

296

296

296

296

296

296

296

296

296

296

296

 

3)

Mazdoor(male)

Each

245

245

245

245

245

245

245

245

245

245

245

245

245

245

245

 

4)

Mazdoor (Female)

Each

245

245

245

245

245

245

245

245

245

245

245

245

245

245

245

 

5)

Carpenter (Head)

Each

326

326

326

326

326

326

326

326

326

326

326

326

326

326

326

 

6)

Carpenter (Ordinary)

Each

296

296

296

296

296

296

296

296

296

296

296

296

296

296

296

 

7)

Carpenter (Helper)

Each

270

270

270

270

270

270

270

270

270

270

270

270

270

270

270

 

8)

Beater Women

Each

270

270

270

270

270

270

270

270

270

270

270

270

270

270

270

 

9)

Gharamee (Head)

Each

326

326

326

326

326

326

326

326

326

326

326

326

326

326

326

 

10)

Gharamee (Ordinary)

Each

296

296

296

296

296

296

296

296

296

296

296

296

296

296

296

 

11)

Bhistee

Each

270

270

270

270

270

270

270

270

270

270

270

270

270

270

270

 

12)

Stone Cutter

Each

326

326

326

326

326

326

326

326

326

326

326

326

326

326

326

 

13)

Santras

Each

326

326

326

326

326

326

326

326

326

326

326

326

326

326

326

 

14)

Blacksmith (Head)

Each

326

326

326

326

326

326

326

326

326

326

326

326

326

326

326

 

15)

Blacksmith (Ordinary)

Each

296

296

296

296

296

296

296

296

296

296

296

296

296

296

296

 

16)

Blacksmith (Helper)

Each

270

270

270

270

270

270

270

270

270

270

270

270

270

270

270

 

17)

Fitter Mechanic

Each

326

326

326

326

326

326

326

326

326

326

326

326

326

326

326

 

18)

Fitter Mechanic (Helper)

Each

270

270

270

270

270

270

270

270

270

270

270

270

270

270

270

 

19)

Hammer Man

Each

270

270

270

270

270

270

270

270

270

270

270

270

270

270

270

 

20)

Khalasi

Each

245

245

245

245

245

245

245

245

245

245

245

245

245

245

245

 

21)

Tarman

Each

296

296

296

296

296

296

296

296

296

296

296

296

296

296

296

 

22)

Painter

Each

326

326

326

326

326

326

326

326

326

326

326

326

326

326

326

 

23)

Spray Painter

Each

326

326

326

326

326

326

326

326

326

326

326

326

326

326

326

 

24)

Welder

Each

326

326

326

326

326

326

326

326

326

326

326

326

326

326

326

 

25)

Welder (Helper)

Each

296

296

296

296

296

296

296

296

296

296

296

296

296

296

296

 

26)

Rod Binder (Head)

Each

326

326

326

326

326

326

326

326

326

326

326

326

326

326

326

 

27)

Rod Binder (Ordinary)

Each

296

296

296

296

296

296

296

296

296

296

296

296

296

296

296

 

28)

Rod Binder (Helper)

Each

245

245

245

245

245

245

245

245

245

245

245

245

245

245

245

 

29)

Mosaic Mistry

Each

326

326

326

326

326

326

326

326

326

326

326

326

326

326

326

 

ANNEXURE-I

Table-1.1- ISSUE RATE OF CEMENT & STEEL MATERIALS

Item No

Description

of Item

Unit

Issue Rate(Rs)

(Supplied by Department)

Basic price (Rs)

(Supllied by Contractor)

Remarks

South bengal

North Bengal

South Bengal

North Bengal

1

2

3

4

5

6

7

8

1)

Cement :

PPC /PSC/

OPC (33 Grade)

MT

6289

6460

5717

5873

1) Rates furnished in column-4 of item 1 & 2 are the issue rates of materials at Departmental Stackyard/Godown.

 

Cement:

OPC(43 Grade)

MT

6289

6460

5717

5873

2)The rate of items involving use of

cement supplied by the Contractor shall be evaluated as per Format -A of Annexure-I

 

Cement:

OPC(53 Grade)

MT

6460

6662

5873

6056

 

2)

Steel Materials

i) Mild Steel Rods

(Fe 250)

(SAIL/TATA/RINL)

MT

41300

43000

36530

38060

3) For sub Items of Item 2 ,The Basic

Prices exclusive of Contractors Profit & GST are given in Column-5.To arrive at complete rate in case of Steel supplied by Contractor.Format B of Annexure -I is reffered.

 

ii) Tor Steel Rods/

HYSD/Fe 415/Fe

500/Fe 500 D

(SAIL/TATA/RINL)

MT

41300

43000

36530

38060

 

Steel Materials

i) Mild Steel Rods

(Fe 250)

(Other than

SAIL/TATA/RINL)

MT

39300

40900

34630

36160

* The catagory of ''Steel Producers'', has been incoporated as per order no: 1825 Ein- C/2015, Dt:05/10/2015

 

ii) Tor Steel Rods/

HYSD/Fe 415/Fe

500/Fe 500 D

(Other than S

AIL/TATA/RINL)

MT

39300

40900

34630

36160

 

3)

Structural Steel

MT

 

 

 

 

 

 

(a)Up to 200mm size

 

 

 

37165

38011

 

 

(b) Above 200mm

& upto 400mm size

 

 

 

38625

39112

 

 

(c) Above 400mm size

 

 

 

40043

40889

 

4)

G.C.I Sheet(0.6 mm

-5.15 kg/sq.m; 0.63

mm - 5.34 kg/sq.m;

0.8 mm - 6.69 kg/

sq.m)

Mt

 

51911

 

 

 

Note:

The above rates are exclusive of GST, Overhead Charges &Contractor’s Profit.

Construction Wing is to add the cost of Cement and Steel to the concerned item to arrive at the complete Rate of the item according to calculation shown in Annexure – I and Annexure - II Cement and Steel as the case may be.

ANNEXURE – I

FORMAT – A

(Format for analysis of rate of items involving use of Cement supplied by Contractor)

Step1 

Rate of  Item as per relevant section of this Schedule     

Rs.A
Step2

Deduct cost of cement = (Quantity of cement) X (Issue rate of cement vide Item No. 1, Column - 4, Table - 1 - 1 of Annexure - I)

Note: The quantity of cement shall be as per Chart for Consumption of Materials.

RS.B
Step 3

Add cost of cement supplied by Contractor including 10% Profit = 1.1 X (Quantity of cement) X (Basic price of cement vide Item No. 1, Column - 5, Table - 1 - 1 of Annexure-I) Note: The quantity of cement shall be same as Step - 2.

RS.C

Final Rate of Item = Rs. A - Rs.B + Rs. C = Rs. D

ANNEXURE – I

FORMAT – B

(Format for Analysis of Rate of reinforcing Steel supplied by Contractor)

Step – 1 Rate of  Item as per relevant section of this Schedule      Rs.A
Step -2 Deduct Issue rate ( Per MT) of respective Quality Steel X 1.05 RS.B
Step – 3 Add Basic Price at outlet of Steel of respective quality X 1.05 RS.C
Step - 4 Add Contractor's Profit @ 10% on cost of Steel only (Sl. No. 3) Rs. D
Step - 5 Add cost of Carriage from outlet to site with necessary loading, unloading and stacking charges for 1.05 MT Steel Rs.E

Final Rate of Item = [Rs. A - Rs.B + Rs.C + Rs.D + Rs.E] = Rs.

ANNEXURE – II

FORMAT – A

(Format for Rate Analysis of Cement Concrete items)

Step - 1 Rate of item as per relevant section of this Schedule

Rs. A

Step - 2

Add cost of stone aggregate of different grading as per consumption required for one cum of concrete.   

20mm Nominal Size:                                                  

10mm Nominal Size:    Rs. B
(As per table:T-1)
Step -3

Add cost of carriage of stone aggregate as per consumption required for one cum of concrete.             

20mm Nominal Size:                                                  

10mm Nominal Size:    Rs. C

( As per table:T-2)
Step - 4

Add cost for loading and unloading of stone aggregate  Rs. D                                          

  ( As per table:T-3)

Final Rate of Item = [Rs. A +Rs.B + Rs.C + Rs.D] = Rs.

 

Note:

Cost of stone aggregate of different grading to be obtained from Table T-1 by considering rate of the nearest

Cost of carriage of stone aggregate to be obtained from Table: T-2 by considering the actual distance from the

Cost for loading and unloading of stone aggregate to be obtained from Table:T-3

ANNEXURE – II is applicable for It. No. 5(a), 6(a)(i) to 6(e)(i), 7(a), 9(A)(a) to 9(A)(e) & 9(B)(a) to 9(B)(e) of Chaper-C only.

(TABLE :T-1)

RATES OF PAKUR VARIETY STONE AGGREGATES AT DIFFERENT RAILWAY YARDS

Name of Railway  Yards

Unit

30/45 Kg    Boulder

Hand Broken Aggreagates

Stone Aggregate

Machine made Stone Chips

Stone grit

Stone dust

Stone Screening

Graded Aggregates

Grade –I aggregate

Grade –I aggregate

37.5 mm

26.5mm

22.4mm

13.2 mm

11.2 mm

5.6 mm

Type-A

Type-B

40 mm

20 mm

10 mm

(63.45mm)

(53 – 22.4 mm)

 

 

 

Nominal Size

Nominal Size

Nominal Size

Adra jn.

Cum

1146

1344

1366

1362

1421

1436

1459

1320

1067

960

989

1149

955

1384

1375

1244

Andal

Cum

927

1125

1147

1143

1202

1217

1240

1101

848

744

762

930

736

1165

1156

1025

Asansol

Cum

983

1181

1203

1199

1258

1273

1296

1157

904

800

820

986

792

1221

1212

1081

Ballyganj

 

1201

1389

1411

1407

1466

1481

1504

1365

1112

1008

1046

1194

1000

1429

1420

1289

Bankura Jn.

Cum

1253

1451

1473

1469

1528

1543

1566

1427

1174

1070

1100

1256

1062

1491

1482

1351

Bandel Jn.

Cum

1090

1288

1310

1306

1365

1380

1403

1264

1011

907

931

1093

899

1328

1319

1188

Barasat

Cum

1201

1399

1421

1417

1476

1491

1514

1375

1122

1018

1046

1204

1010

1439

1430

1299

Barrackpur

Cum

1146

1344

1366

1362

1421

1436

1459

1320

1067

963

989

1149

955

1384

1375

1244

Baripur jn.

Cum

1253

1451

1473

1469

1528

1543

1566

1427

1174

1070

1100

1256

1062

1491

1482

1351

Berhampur Court

Cum

1416

1614

1636

1632

1691

1706

1729

1590

1337

1233

1269

1419

1225

1654

1645

1514

Bishnupur

Cum

1307

1724

1746

1742

1801

1816

1839

1700

1447

1343

1383

1529

1335

1764

1755

1624

Bongaon

Cum

1253

1451

1473

1469

1528

1543

1566

1427

1174

1070

1100

1256

1062

1491

1482

1351

Burdwan In.

Cum

927

1125

1147

1143

1202

1217

1240

1101

848

744

762

930

736

1165

1156

1025

Chandrakona Road

Cum

1526

1724

1746

1742

1801

1816

1839

1700

1447

1343

1383

1529

1335

1764

1755

1624

Dalkhola

Cum

1526

1724

1746

1742

1801

1716

1839

1700

1447

1343

1383

1529

1335

1764

1755

1624

Dankuni

Cum

983

1181

1203

1199

1258

1273

1293

1157

904

800

820

986

792

1221

1212

1081

Dhupguri

Cum

1090

1288

1310

1306

1365

1380

1403

1264

1011

907

931

1093

899

1328

1319

1188

Durgapur

Cum

1361

1559

1581

1577

1636

1651

1674

1535

1282

1178

1212

1364

1170

1599

1590

1459

Falakata

Cum

927

1125

1147

1143

1202

1217

1240

1101

848

744

762

930

736

1165

1156

1025

Haldia

Cum

1416

1614

1636

1632

1691

1706

1729

1590

1337

1233

1269

1419

1225

1654

1645

1514

Jhargram

Cum

1526

1724

1746

1742

1801

1816

1839

1700

1447

1343

1383

1529

1335

1764

1755

1624

Kalyani

Cum

1146

1344

1366

1362

1421

1436

1459

1320

1067

9860

989

1149

955

1384

1375

1244

Kharagpur Jn.

Cum

1416

1614

1636

1632

1691

1706

1729

1590

1337

1233

1269

1419

1225

1654

1645

1514

Krishnanagar City

Cum

1253

1451

1473

1469

1528

1543

1566

1427

1174

1070

1100

1256

1062

1491

1482

1351

Maldah Town

Cum

762

960

982

978

1037

1052

1075

936

686

579

591

765

571

100

991

860

Midnapore

Cum

1471

1669

1691

1687

1746

1761

1784

1645

1392

1288

1326

1474

1280

1709

1700

1569

New Farakka

Cum

762

960

982

978

1037

1052

1075

936

686

579

591

765

571

1000

991

860

New Alipore

Cum

1201

1399

1421

1417

1476

1491

1514

1375

1122

1018

1046

1204

1010

1439

1430

1299

New

Cum

1526

1724

1746

1742

1801

1816

1839

1700

1447

1343

1383

1529

1335

1764

1755

1624

New Coochbehar

Cum

1526

1724

1746

1742

1801

1816

1839

1700

1447

1343

1383

1529

1335

1764

1755

1624

New Jalpaiguri

Cum

1253

1451

1473

1469

1528

1543

1566

1427

1174

1070

1100

1256

1062

1491

1482

1351

Panskura

Cum

1307

1505

1527

1523

1582

1597

1620

1481

1228

1124

1156

1310

1116

1545

1536

1405

Purulia

Cum

1035

1233

1255

1251

1310

1325

1348

1209

956

852

874

1038

8414

1273

1264

1133

Raniganj

Cum

927

1125

1147

1143

1202

1217

1240

1209

848

744

762

930

736

1165

1156

1025

Sainthia

Cum

762

960

982

978

1037

1052

1075

1101

683

579

591

765

571

1000

991

860

Salimar

Cum

1201

1399

1421

1417

1476

1491

1514

1375

1122

1018

1046

1204

1010

1439

1430

1299

Sealdah

Cum

1201

1399

1421

1417

1476

1491

1514

1375

1122

1018

1046

1204

1010

1439

1430

1299

Serampore

Cum

1146

1344

1366

1362

1421

1436

1459

1320

1067

963

989

1149

955

1384

1375

1244

Suri

Cum

762

960

982

978

1037

1052

1075

936

683

583

569

765

571

1000

991

860

Tarakeswar

Cum

1090

1288

1310

1306

1365

1380

1403

1264

1011

1182

897

1093

899

1328

1319

1188

Tamluk

Cum

1361

1559

1581

1577

1636

1651

1674

1535

1282

911

1168

1364

1170

1599

1590

1459

1. The above rates are inclusive of all charges such as Royalty, Supervision Charges, etc. and also include allowance for sinkage and/or shrinkage but excluding GST, Overhead Charges and Contractor's profit

2. Payment will be made on the basis of net volume.

(TABLE :T-2)

Road Transportation & Carriage Works

Item No

Description of Item

Unit

Zone

Any Distance Up to 5 km

Above

5 km

up to

10 km

(per km)

Above

10 km

up to

20 km

(per km)

Above

20 km

up to

50 km

(per km)

Above

50 km

up to

100 km

(per km)

Above

100 km

(per km)

All District except hill area of Darjeeling

124.00

10.90

10.10

9.50

8.40

7.90

1.

Carriage of Stone Aggregate

Cum

Hill area of Darjeeling

185.00

16.40

15.20

14.30

12.60

11.90

(TABLE :T-3)

Rate for loading & unloading of Stone Aggregate

Item No

Description of Item unit

Unit

All Districts of West Bengal and Darjeeling Plain of Siliguri Sub – Division

Darjeeling Hill Area

Remarks

1

Loading & unloading by Manual means Loading into trucks at the lifting point, unloading at destination, stacking properly in go downs or yard etc. as directed including carriage by head load up to a lead of 50.00 m at each of the two points.

 

 

 

 

(a)

Stone Aggregate below 40 mm nominal size

Cum

58.00

58.00

(b)

Stone Aggregate above 40 mm nominal size

Cum

62.00

62.00

*****