RISING MAIN-2



 RISING MAINS-2

3.11.5

630 A 50KA ISC for 1 sec Details of cost for one each

 

 

 

 

 

MATERIALS

 

 

 

 

1571

630 amps. TPN, End Feed Unit for compact rising mains including all accessories

each

1.00

6847.00

6847.00

 

Total cost of materials

 

 

 

6847.00

 

Cartage @ 1 % of A1

 

 

 

68.47

 

LABOUR

 

 

 

 

1001

Wireman

day

0.17

673.00

114.41

1007

Khallasi

day

0.17

553.00

94.01

 

TOTAL

 

 

 

7123.89

 

Add 12% GST (MF = 0.1405)

 

 

 

1000.91

 

TOTAL

 

 

 

8124.80

 

OVERHEADS & PROFIT @ 15 %

 

 

 

1218.72

 

TOTAL

 

 

 

9343.52

 

Rate per Each

 

 

 

9343.52

 

Say

 

 

 

9344.00

3.11.6

800 A 50KA ISC for 1 sec Details of cost for one each

 

 

 

 

 

MATERIALS

 

 

 

 

1572

800 A TPN, End Feed Unit for compact rising mains including all accessories

each

1.00

8110.00

8110.00

 

Total cost of materials

 

 

 

8110.00

 

Cartage @ 1 % of A1

 

 

 

81.10

 

LABOUR

 

 

 

 

1001

Wireman

day

0.17

673.00

114.41

1007

Khallasi

day

0.17

553.00

94.01

 

TOTAL

 

 

 

8399.52

 

Add 12% GST (MF = 0.1405)

 

 

 

1180.13

 

TOTAL

 

 

 

9579.65

 

OVERHEADS & PROFIT @ 15 %

 

 

 

1436.95

 

TOTAL

 

 

 

11016.60

 

Rate per Each

 

 

 

11016.60

 

Say

 

 

 

11017.00

3.11.7

1000 A 50KA ISC for 1 sec Details of cost for one each

 

 

 

 

 

MATERIALS

 

 

 

 

1573

1000 A TPN, End Feed Unit for compact rising mains including all accessories

each

1.00

9100.00

9100.00

 

Total cost of materials

 

 

 

9100.00

 

Cartage @ 1 % of A1

 

 

 

91.00

 

LABOUR

 

 

 

 

1001

Wireman

day

0.17

673.00

114.41

1007

Khallasi

day

0.17

553.00

94.01

 

TOTAL

 

 

 

9399.42

 

Add 12% GST (MF = 0.1405)

 

 

 

1320.62

 

TOTAL

 

 

 

10720.04

 

OVERHEADS & PROFIT @ 15 %

 

 

 

1608.01

 

TOTAL

 

 

 

12328.05

 

Rate per Each

 

 

 

12328.05

 

Say

 

 

 

12328.00

3.11.8

1200 A 50KA ISC for 1 sec Details of cost for one each

 

 

 

 

 

MATERIALS

 

 

 

 

1574

1250 A TPN, End Feed Unit for compact rising mains including all accessories

each

1.00

9611.00

9611.00

 

Total cost of materials

 

 

 

9611.00

 

Cartage @ 1 % of A1

 

 

 

96.11

 

LABOUR

 

 

 

 

1001

Wireman

day

0.17

673.00

114.41

1007

Khallasi

day

0.17

553.00

94.01

 

TOTAL

 

 

 

9915.53

 

Add 12% GST (MF = 0.1405)

 

 

 

1393.13

 

TOTAL

 

 

 

11308.66

 

OVERHEADS & PROFIT @ 15 %

 

 

 

1696.30

 

TOTAL

 

 

 

13004.96

 

Rate per Each

 

 

 

13004.96

 

Say

 

 

 

13005.00

3.12

Supplying, installation, testing & commisioning  of following capacity Plug In/ tap off box  on the existing Air Insulated Compact Type bus trunking/ rising mains for use on 3 phase 4 wire 415 V, 50Hz A.C. supply made with 1.6mm thick  sheet steel enclosure (IP54) duly powder coated with provision of MCCB (but without MCCB) complete  etc. as required

 

 

 

 

3.12.1

125 A 15KA ISC for 1 sec Details of cost for one each

 

 

 

 

 

MATERIALS

 

 

 

 

1575

125 A TPN, TAP OFF Box for compact rising mains including all accessories

each

1.00

4678.00

4678.00

 

Total cost of materials

 

 

 

4678.00

 

Cartage @ 1 % of A1

 

 

 

46.78

 

LABOUR

 

 

 

 

1001

Wireman

day

0.10

673.00

67.30

1007

Khallasi

day

0.10

553.00

55.30

 

TOTAL

 

 

 

4847.38

 

Add 12% GST (MF = 0.1405)

 

 

 

681.06

 

TOTAL

 

 

 

5528.44

 

OVERHEADS & PROFIT @ 15 %

 

 

 

829.27

 

TOTAL

 

 

 

6357.71

 

Rate per Each

 

 

 

6357.71

 

Say

 

 

 

6358.00

3.12.2

200 A 25KA ISC for 1 sec Details of cost for one each

 

 

 

 

 

MATERIALS

 

 

 

 

1576

200 A. TPN, TAP OFF Box for compact rising mains including all accessories

each

1.00

5954.00

5954.00

 

Total cost of materials

 

 

 

5954.00

 

Cartage @ 1 % of A1

 

 

 

59.54

 

LABOUR

 

 

 

 

1001

Wireman

day

0.10

673.00

67.30

1007

Khallasi

day

0.10

553.00

55.30

 

TOTAL

 

 

 

6136.14

 

Add 12% GST (MF = 0.1405)

 

 

 

862.13

 

TOTAL

 

 

 

6998.27

 

OVERHEADS & PROFIT @ 15 %

 

 

 

1049.74

 

TOTAL

 

 

 

8048.01

 

Rate per Each

 

 

 

8048.01

 

Say

 

 

 

8048.00

3.12.3

250 A 30KA ISC for 1 sec Details of cost for one each

 

 

 

 

 

MATERIALS

 

 

 

 

1577

315 A TPN, TAP OFF Box for compact rising mains including all accessories

each

1.00

7655.00

7655.00

 

Total cost of materials

 

 

 

7655.00

 

Cartage @ 1 % of A1

 

 

 

76.55

 

LABOUR

 

 

 

 

1001

Wireman

day

0.13

673.00

87.49

1007

Khallasi

day

0.13

553.00

71.89

 

TOTAL

 

 

 

7890.93

 

Add 12% GST (MF = 0.1405)

 

 

 

1108.68

 

TOTAL

 

 

 

8999.61

 

OVERHEADS & PROFIT @ 15 %

 

 

 

1349.94

 

TOTAL

 

 

 

10349.55

 

Rate per Each

 

 

 

10349.55

 

Say

 

 

 

10350.00

3.12.4

400 A 35KA ISC for 1 sec Details of cost for one each

 

 

 

 

 

MATERIALS

 

 

 

 

1578

400 A TPN, TAP OFF Box for compact rising mains including all accessories

each

1.00

7655.00

7655.00

 

Total cost of materials

 

 

 

7655.00

 

Cartage @ 1 % of A1

 

 

 

76.55

 

LABOUR

 

 

 

 

1001

Wireman

day

0.13

673.00

87.49

1007

Khallasi

day

0.13

553.00

71.89

 

TOTAL

 

 

 

7890.93

 

Add 12% GST (MF = 0.1405)

 

 

 

1108.68

 

TOTAL

 

 

 

8999.61

 

OVERHEADS & PROFIT @ 15 %

 

 

 

1349.94

 

TOTAL

 

 

 

10349.55

 

Rate per Each

 

 

 

10349.55

 

Say

 

 

 

10350.00

 

 

 

 

 

 

3.12.5

500 A 50KA ISC for 1 sec Details of cost for one each

 

 

 

 

 

MATERIALS

 

 

 

 

 

1579 500 A TPN, TAP OFF Box for compact rising mains including all accessories

each

1.00

11057.00

11057.00

 

Total cost of materials

 

 

 

11057.00

 

Cartage @ 1 % of A1

 

 

 

110.57

 

LABOUR

 

 

 

 

1001

Wireman

day

0.17

673.00

114.41

1007

Khallasi

day

0.17

553.00

94.01

 

TOTAL

 

 

 

11375.99

 

Add 12% GST (MF = 0.1405)

 

 

 

1598.33

 

TOTAL

 

 

 

12974.32

 

OVERHEADS & PROFIT @ 15 %

 

 

 

1946.15

 

TOTAL

 

 

 

14920.47

 

Rate per Each

 

 

 

14920.47

 

Say

 

 

 

14920.00

3.12.6

630 A 50KA ISC for 1 sec Details of cost for one each

 

 

 

 

 

MATERIALS

 

 

 

 

 

1580 630 A TPN, TAP OFF Box for compact rising mains including all accessories

each

1.00

11056.00

11056.00

 

Total cost of materials

 

 

11056.00

 

 

Cartage @ 1 % of A1

 

 

 

110.56

 

LABOUR

 

 

 

 

1001

Wireman

day

0.17

673.00

114.41

1007

Khallasi

day

0.17

553.00

94.01

 

TOTAL

 

 

 

11374.98

 

Add 12% GST (MF = 0.1405)

 

 

 

1598.18

 

TOTAL

 

 

 

12973.16

 

OVERHEADS & PROFIT @ 15 %

 

 

 

1945.97

 

TOTAL

 

 

 

14919.13

 

Rate per Each

 

 

 

14919.13

 

Say

 

 

 

14919.00

3.13

Supplying, installing by suspension on ceiling/ along the wall, testing and commissioning of following capacity Sandwich Type Rising Mains for use on 3 phase 4 wire 415 volts, 50Hz A.C. supply with metal clad enclosure having IP-54 rating after fixing the tap off boxes and all accessories, made of 1.6mm thick steel sheet duly powder coated in convenient sections complete with 4 Nos aluminium bus bars having current density of 130 A/ sq cm at nominal current rating, necessary joints, elbow joints & expansion joints and bends, fire barrier at each floor, provision of tapping at every meter, adopter box and copper flexible for joints, continuous earthing with 2 Nos aluminium strip of suitable size (one on each side) including, G.I. clamping brackets, suspenders, angle iron bracket, steel fasteners, connecting to earthing system etc. as required

 

 

 

 

3.13.1

400 A 25KA ISC for 1 sec Details of cost for 10 Metres

 

 

 

 

 

MATERIALS

 

 

 

 

1581

 

metre

10.00

8611.00

86 110.00

2804

25 mm X 25 mm X 3 mm angle iron =7 X 0.25m =1.75 @1.11kg/m = 1.94kg

kg

1.94

33.00

64.02

2802

MS Suspender 8 mm dia 0.75m long

each

14.00

28.00

392.00

 

Total cost of materials

 

 

 

86566.02

 

Cartage @ 1 % of A1

 

 

 

865.66

 

LABOUR

 

 

 

 

1001

Wireman

day

2.50

673.00

1682.50

1010

Mason, Grade 2

day

1.00

612.00

612.00

1007

Khallasi

day

3.50

553.00

1935.50

 

TOTAL

 

 

 

91661.68

 

Add 12% GST (MF = 0.1405)

 

 

 

12878.47

 

TOTAL

 

 

 

104540.15

 

OVERHEADS & PROFIT @ 15 %

 

 

 

15681.02

 

Cost for 10 Metre

 

 

 

120221.17

 

Rate per Metre

 

 

 

12022.12

 

Say

 

 

 

12022.00

3.13.2

500 A 30KA ISC for 1 sec Details of cost for 10 Metres

 

 

 

 

 

MATERIALS

 

 

 

 

 

1582 500 A 30KA ISC for 1 sec Sandwich Type Bus Trunking for use on 3 phase 4 wire 415 volts, 50Hz A.C. supply with metal clad enclosure made of 1.6mm thick steel sheet duly powder coated in convenient sections complete with 4 Nos aluminium bus bar

metre

10.00

9226.00

92260.00

2804

25 mm X 25 mm X 3 mm angle iron =7 X 0.25m =1.75 @1.11kg/m = 1.94kg

kg

1.94

33.00

64.02

2802

MS Suspender 8 mm dia 0.75m long

each

14.00

28.00

392.00

 

T otal cost of materials

 

 

 

92716.02

 

C artage @ 1 % of A1

 

 

 

927.16

 

LABOUR

 

 

 

 

1001

Wireman

day

2.50

673.00

1682.50

1010

Mason, Grade 2

day

1.00

612.00

612.00

1007

Khallasi

day

3.50

553.00

1935.50

 

TOTAL

 

 

 

97873.18

 

Add 12% GST (MF = 0.1405)

 

 

 

13751.18

 

TOTAL

 

 

 

111624.36

 

OVERHEADS & PROFIT @ 15 %

 

 

 

16743.65

 

Cost for 10 Metre

 

 

 

128368.01

 

Rate per Metre

 

 

 

12836.80

 

Say

 

 

 

12837.00

3.13.3

630 A 50KA ISC for 1 sec Details of cost for 10 Metres

 

 

 

 

 

MATERIALS

 

 

 

 

1583

630 A 50KA ISC for 1 sec Sandwich Type Bus Trunking for use on 3 phase 4 wire 415 volts, 50Hz A.C. supply with metal clad enclosure made of 1.6mm thick steel sheet duly powder coated in convenient sections complete with 4 Nos aluminium bus bars

metre

10.00

9978.00

99780.00

2804

25 mm X 25 mm X 3 mm angle iron =7 X 0.25m =1.75 @1.11kg/m = 1.94kg

kg

1.94

33.00

64.02

2802

MS Suspender 8 mm dia 0.75m long

each

14.00

28.00

392.00

 

Total cost of materials

 

 

 

100236.02

 

Cartage @ 1 % of A1

 

 

 

1002.36

 

LABOUR

 

 

 

 

1001

Wireman

day

2.50

673.00

1682.50

1010

Mason, Grade 2

day

1.00

612.00

612.00

1007

Khallasi

day

3.50

553.00

1935.50

 

TOTAL

 

 

 

105468.38

 

Add 12% GST (MF = 0.1405)

 

 

 

14818.31

 

TOTAL

 

 

 

120286.69

 

OVERHEADS & PROFIT @ 15 %

 

 

 

18043.00

 

Cost for 10 Metre

 

 

 

138329.69

 

Rate per Metre

 

 

 

13832.97

 

Say

 

 

 

13833.00

3.13.4

800 A 50KA ISC for 1 sec Details of cost for 10 Metres

 

 

 

 

 

MATERIALS

 

 

 

 

1584

800 A 50KA SC for 1 sec Sandwich Type Bus Trunking for use on 3 phase 4 wire 415 volts, 50Hz A.C. supply with metal clad enclosure made of 1.6mm thick steel sheet duly powder coated in convenient sections complete with 4 Nos aluminium bus bars

metre

10.00

11277.00

112770.00

2804

25 mm X 25 mm X 3 mm angle iron =7 X 0.25m =1.75 @1.11kg/m = 1.94kg

kg

1.94

33.00

64.02

2802

MS Suspender 8 mm dia 0.75m long

each

14.00

28.00

392.00

 

Total cost of materials

 

 

 

113226.02

 

Cartage @ 1 % of A1

 

 

 

1132.26

 

LABOUR

 

 

 

 

1001

Wireman

day

2.50

673.00

1682.50

1010

Mason, Grade 2

day

1.00

612.00

612.00

1007

Khallasi

day

3.50

553.00

1935.50

 

TOTAL

 

 

 

118588.28

 

Add 12% GST (MF = 0.1405)

 

 

 

16661.65

 

TOTAL

 

 

 

135249.93

 

OVERHEADS & PROFIT @ 15 %

 

 

 

20287.49

 

Cost for 10 Metre

 

 

 

155537.42

 

Rate per Metre

 

 

 

15553.74

 

Say

 

 

 

15554.00

3.13.5

1000 A 50KA ISC for 1 sec Details of cost for 10 Metres

 

 

 

 

 

MATERIALS

 

 

 

 

1585

1000 A 50KA ISC for 1 sec Sandwich Type Bus Trunking for use on 3 phase 4 wire 415 volts, 50Hz A.C. supply with metal clad enclosure made of 1.6mm thick steel sheet duly powder coated in convenient sections complete with 4 Nos aluminium bus bars

metre

10.00

12651.00

126510.00

2804

25 mm X 25 mm X 3 mm angle iron =7 X 0.25m =1.75 @1.11kg/m = 1.94kg

kg

1.94

33.00

64.02

2802

MS Suspender 8 mm dia 0.75m long

each

14.00

28.00

392.00

 

Total cost of materials

 

 

 

126966.02

 

Cartage @ 1 % of A1

 

 

 

1269.66

 

LABOUR

 

 

 

 

1001

Wireman

day

2.50

673.00

1682.50

1010

Mason, Grade 2

day

1.00

612.00

612.00

1007

Khallasi

day

3.50

553.00

1935.50

 

TOTAL

 

 

 

132465.68

 

Add 12% GST (MF = 0.1405)

 

 

 

18611.43

 

TOTAL

 

 

 

151077.11

 

OVERHEADS & PROFIT @ 15 %

 

 

 

22661.57

 

Cost for 10 Metre

 

 

 

173738.68

 

Rate per Metre

 

 

 

17373.87

 

Say

 

 

 

17374.00

3.13.6

1250 A 50KA ISC for 1 sec Details of cost for 10 Metres

 

 

 

 

 

MATERIALS

 

 

 

 

1586

1250 A 25KA SC for 1 sec Sandwich Type Bus Trunking for use on 3 phase 4 wire 415 volts, 50Hz A.C. supply with metal clad enclosure made of 1.6mm thick steel sheet duly powder coated in convenient sections complete with 4 Nos aluminium bus bars

metre

10.00

14147.00

141470.00

*****