PREAMBLE

1.0 AREA ALLOWANCES:

A) CORPORATIONS & MUNICIPALITIES:

a) i) 25% extra over the rates on labour component of works is allowed in all Municipal Corporation Limits of Andhra Pradesh except Greater Visakhapatnam Municipal Corporation and Vijayawada Municipal Corporation (Upto a belt of 12 kms from Municipal corporation limits) and other Municipal Corporations as notified by the Government from time to time.

ii) 40% extra over the rates on labour component of works for Greater Visakhapatnam and Vijayawada Municipal Corporation limits (Upto a belt of 12 kms from Municipal corporation limits)

iii) 40% extra over the rates on labour component of works for Amaravati Capital City area (217.23 Sq. Km) as declared by the Govt. vide GO MS No. 141 MA&UD (M2) Dept., dt. 9.6.2015 (This is introduced as per the Govt. instructions issued in Govt. Memo No. 668755/ Reforms/ 2017 dt. 14.7.2017).

b) Allow 20% extra over basic rates on labour component of works in all District Headquarters and the remaining Municipal limits (up to a belt of 12 Kms. from Municipal limits) \

c) For works at Tirumala Hills in Chittoor District, 40% extra over the basic rates of labour component is allowed. 

d) For works at Horsely hills in Chittoor District, 30% extra over the basic rates of labour component is allowed. 

e) For works located inside Tirumala Temple, 20% extra over the basic rate of labour component specified for Tirumala Hills is allowed.

f) For Works located inside T.T.D Temples of Sri Padmavathi Ammavari Temple,Tiruchanoor, Sri Govindaraja Swamy Temple at Tirupathi, Sri Kapileswara Swamy Temple, Kapilatheertham, Tirupathi and Sri Kalyana Venkateswara Swamy Temple, Srinivasa Mangapuram , 20% extra over the basic rates of labour component for Tirupathi Municipal Corporation is allowed.

B) JAIL COMPOUNDS:

20% extra is allowed over labour rates for the works in the Jail compounds. Only equivalent number of Man Mazdoor shall be provided in the Jail premises and no Women Mazdoor are allowed inside.

C) INDUSTRIAL AREA:

a. 20% Extra over basic rates on labour component works allowed for works situated within 10 Kms belt of Industrial area of Ibrahimpatnam, Vuyyuru, Jaggaiahpeta in Krishna District, Macherla, Gurajala, Challapalli in Guntur District, Garividi in Vijayanagaram District, Renigunta in Chittoor District, Yerraguntla & Mangampet in Kadapa District, Hindupur, Tadipatri, Anantapur, Guntakal, Rayalcheruvu, Yadiki of Anantapur District, Adoni, Dhone, Cement Nagar, Nandyal, Kurnool, Yemmiganur & Bethamcherla of Kurnool District and Anakapally of Vishakhapatnam District.

D) AGENCY / TRIBAL AREAS:

a) 25% extra allowed for the works located with in the interior Agency / Tribal limits, i.e. for the works located with in & upto16 KMs from any all weather route inside Agency / Tribal.

b) 40% extra allowed for the works located with in the interior Agency / Tribal limits, i.e. for the works located beyond 16 KMs from any all weather route inside Agency / Tribal.

NOTE:

1. No extra percentage is permissible in respect of Forest produce such as Bamboo, Rellu grass and for all materials obtained from outside the Agency / Tribal.

2. The extra percentage under Agency / Tribal areas allowance may be allowed on the labour component and on the labour charges in the rates for conveyance of materials.

3. The extra percentage on cost of materials in Agency / Tribal areas can be allowed on the labour component only, if they are manufactured in the Agency / Tribal areas itself except Forest produce.

E) GHAT ROADS:

For Ghat Roads steeper than 1 in 20, the length of the road may be taken as 1.5 times the existing length of the road for the purpose of leads only for conveyance of materials based on the certificate for the Ghat Road given by the Superintending Engineer concerned. Note: Under compelling circumstances, the concerned Chief Engineer can adopt the equivalent length of road as 2 ½ times of actual length. Note for area allowances: If more than one area allowance ( such as those ) for (1) Municipalities (2) Agency / Tribal areas (3) Industrial areas are applicable for a particular situation, only the maximum out of the allowable percentages is to be allowed.

2.0 WATER LEADS:

The following labour is allowed for conveyance of water for every ½ Kilometer lead or part there of over the initial lead of ½ kilometer.

a Cement concrete 1.5 Women Mazdoor / Cum
b Masonry 1.0 Woman Mazdoor/ Cum.
c Plastering 0.5 Woman Mazdoor/ 10 Sq.m

Note:-

For Water leads of over 2 KMs, specific approval of Chief Engineer concerned is necessary.

3.0 EXCAVATION OF TRIAL TRENCHES, TRIAL PITS AND EXCAVATION IN RESTRICTED PLACES: -

I) EXCAVATION OF TRIAL TRENCHES, TRIAL PITS AND EXCAVATION IN RESTRICTED PLACES: -

A. TRIAL TRENCHES:

1) Trial trenches of not more than 2 metres in width …25% extra

B. TRIAL PITS:

1 Up to 2 Metres depth 25% extra
2 2 Metres to 4 Metres depth 50% extra
3 4 Metres to 6 Metres depth 75% extra
4 6 Metres to 8 Metres depth 100% extra
5 8 Metres to 9 Metres depth 150% extra
6 More than 9 Metres depth 200% extra

II) EXCAVATION IN RESTRICTED PLACES:

1 Foundation of Buildings 75% extra
2 For pipe lines where the depth is less  than 1.5 times the width 75% extra
3 For pipe lines where the depth is 1.5 times or more than the width 120% extra
4 Silt removal in restricted areas such U. T’s., Culverts and Syphons. 120% extra
5 Excavation of field channels 75% extra
6 For narrow trenches not more than 2 meters in width and depth not less than twice the width and for excavation of road boundary drains, model sections of canals. 75% extra
7 ) High berm cutting of not more than 150 mm average thickness and Sectioning for roads 50% extra

Note: 1) The extra percentage is allowed over rate for corresponding soil. It includes the charges for all lifts and initial lead but does not include dewatering charges if any in respect of all the items under ( A) and (B) above.

2) The above extra percentages in respect of excavation in hard rock for restricted places are to be allowed for (2/3) rd of the cost and shall not to be allowed in respect of items involving blasting component which may be taken as 1/3 of the cost.

4.0 Proportion of First class and 2nd class workmen under Skilled Labour:

30% of the skilled labour provided in the data may be taken as 1st Class and the remaining 70% as 2nd Class.

5.0 Revetment and apron works:

I) The size of stone for the volume range ( 0.015 to 0.030 Cum) shall not be less than (0.30 X 0.30 X 0.15 to 0.30 X 0. 225 X 0.225m)

II) The size of stone for the volume range (0.011 to 0.015 Cum) shall not be less than (0.30 X 0.225 X 0.15 to 0.225 X 0.225 X 0. 225 m)

III) The rate of labour component as per the standard data book is to be adopted for revetment work only. However for apron work Rs. 3.00 per cum. should be deducted.

IV) For the labour for the “Rock Toe” shall be taken as 2/3rd of the labour charges of revetment as Chief Engineer, Circular No. P3/ OT2/ T3/ 65167/78, Dt: 19.03.1980.

6.0 Deep cuts:

Deep cuts are defined as reaches of canal where excavation in all soils is for a depth of excavation 6m and more.The following increase over normal rates is permitted in deep cuts on a graded basis.

1 Up to 6 m excavation: The S. S. R. of corresponding classification of earth work excavation is applicable.  
2 Beyond 6 m and up to 9 m excavation 9% extra
3 Beyond 9 m and up to 12 m excavation 12% extra
4 Beyond 12 m and up to 16 m excavation 15% extra
5 Beyond 16 m and up to 30 m excavation 20% extra
6 Beyond 30 m excavation 40% extra

NOTE :

1) The extra percentage is only on basic rate.

2) The above percentage are not applicable for “LEADS & LIFTS”.

3) The above extra percentages are to be allowed only on items excluding the blasting component which may be taken as 1/3 of the rate.

7.0 The conveyance of bitumen for bulk and packed may be admitted as follows:

Packed --- Rs. 1.75 per Km/ MT

Bulk --- Rs. 1.65 per Km/ MT (round the trip)

8.0 SEIGNIORAGE CHARGES:

Seigniorage charges for materials as fixed by the Government in G.O.Ms.No.11 (Industries and commerce department) Dt. 11.2.2020 shall be shown in Part-B of the estimate. The Provision towards Contractor's Profit and Overhead charges should not be operated on the Seigniorage Charges. In case of revision, the revised rates as fixed by Mines and Geology Department have to be adopted.

9.0 Earthwork excavation rate for Trench cutting, formation of embankment & shoulders, foundations, removal of unserviceable soil etc., is to be arrived based on the Machinery adopted in the MoRTH Standard data book for excavation of soil.

10.0 All the Materials and Machinery Hire charges are excluding taxes.

LABOUR RATES

Si. No S.S.
Item No.
CFMS Code Description Unit (Per) S o Rate for 2020-21
in Rs.
Remarks
1 2 3 4 5 6 7
      (A)SKILLED WORKMEN      
      First Class      
1 a LAB-00039 Stone cutter Day 545 As per WR Dept.
(S.No.39)
2 b LAB-00011 Mason & Brick Layer Day 550 As per WR Dept.
(S.No.11)
3 c LAB-00004 Carpenter Day 615 As per WR Dept.
(S.No.4)
4 d LAB-00035 Painter Day 615 As per WR Dept.
(S.No.35)
5 e LAB-00036 Plumber Day 615 As per WR Dept. (S.No.36)
6 f LAB-00041 Welder Day 540 As per WR Dept.
(S.No.41)
7 g LAB-00006 Fitter Day 585 As per WR Dept.
(S.No.6)
8 h LAB-00005 Electrician Day 610 As per WR Dept. (S.No.5)
9 1 LAB-00125 Cook Day 500 As per WR Dept. (S.No.2)
Other Category
10 2 LAB-00012 Mechanic Day 560 As per WR Dept.
(S.No.12)
11 3 LAB-00043 Rigger Day 570  
12 4 LAB-00044 Rigger Syrang Day 570  
13 5 LAB-00045 Well Sinker Day 570  
14 6 LAB-00003 Blaster Day 605 As per WR Dept.
(S.No.3)
15 3 LAB-00001 Bar bender Day 665 As per WR Dept.
(S.No.1)
16 7 LAB-00015 Tipper and Heavy Vehicle Driver
above 12 T
Day 605 As per WR Dept. (S.No.15)
17   LAB-00046 Tanker and medium Vehicle driver
(7.5 T to 12 T)
Day 565  
18   LAB-00047 Tanker and Light Vehicle driver up to
7.5 T
Day 435  
19   LAB-00048 Wagon Drill Operator upto 7.5 T Day 565  
20 8 LAB-00049 Lorry and Heavy Vehicle Driver
above 12 T
Day 600  
21   LAB-00027 Road Roller Driver (7.5 T to 12 T) Day 560 As per WR Dept.
(S.No.27)
22     Road Roller Driver 7.5 T Day Deleted  
23 9   Tractor Driver above 12 T Day Deleted  
24     Tractor Driver (7.5 T to 12 T) Day deleted  
25   LAB-00050 Tractor Driver 7.5 T Day 545  
      Operator      
26 10 LAB-00051 Pan Mixer Day 585  
27   LAB-00016 Concrete Mixer Day 540 As per WR Dept.
(S.No.16)
28   LAB-00032 Vibrator Day 540 As per WR Dept. (S.No.32)
29   LAB-00052 Composer Day 545  
30   LAB-00023 Jack Hammer Day 540 As per WR Dept. (S.No.23)
31   LAB-00034 Driller Day 605 As per WR Dept.
(S.No.34)
32   LAB-00053 Boring Maistry Day 525  
33 11 LAB-00024 Pump operator Day 540 As per WR Dept.
(S.No.24)
34 12 LAB-00054 Turner Grade-I Day 570  
35 13 LAB-00135 Wireless Operator Day 605 As per WR Dept. (S.No.12)
Other Category
36 14 LAB-00055 Assistant Wireless Operator Day 520  
37 15 LAB-00138 Jeep Driver Day 600 As per WR Dept. (S.No.15)
Other Category
38 16 LAB-00132 Work Inspector with I.T.I qualification Day 615 As per WR Dept. (S.No.9)
Other Category
39 17 LAB-00127 Work Inspector with LCE, LME,L.E.E qualification Day 850 As per WR Dept. (S.No.4)
Other Category
40 18 LAB-00130 Work Inspector with B.E (Civil, Mechanical and Electrical)
qualification
Day 1100 As per WR Dept. (S.No.7)
Other Category
41 19 LAB-00010 Work Inspector with Non-technical qualification SSLC/SSC/HSC Day 600 As per WR Dept. (S.No.10)
42 20 LAB-00056 Mason Spl. Grade for Mossaic and
Polished shahabad stone floor
Day 560  
43 21
a(i)
LAB-00136 Typist / Job Typist Day 605 As per WR Dept. (S.No.13)
Other Category
  a (ii) LAB-00134 Computer operator Day 670 As per WR Dept. (S.No.11)
Other Category
  b LAB-00137 CAD Operator with Diploma in Engineering /General degree with
CAD certificate
Day 855 As per WR Dept. (S.No.14)
Other Category
      (B) SEMI –SKILLED WORKMEN      
      SECOND CLASS      
44 a LAB-00091 Mason Day 500 As per WR Dept. (S.No.35)
Semi-Skilled
45 b LAB-00091 Brick Layer and Stone Cutter Day 500 As per WR Dept. (S.No.35)
Semi-Skilled
46 c LAB-00060 Carpenter Day 500 As per WR Dept. (S.No.4)
Semi-Skilled
47 d LAB-00093 Painter Day 500 As per WR Dept. (S.No.37)
Semi-Skilled
48 e   deleted    
49 f LAB-00002 Blacksmith Day 525
50 g LAB-00098 Welder Day 500
51 h LAB-00099 Fitter Day 500
52 i LAB-00100 Electrician Day 500
53 2 LAB-00101 Caulker Day 500
54 4 LAB-00102 Tinker Day 500
55 5 LAB-00103 Sawyer Day 500
56 6 LAB-00104 Brick-Moulder Day 500
57 7 LAB-00105 Pot-tile turner Day 500
58 8 LAB-00106 Pan-tile turner Day 500
59 9 LAB-00107 Brick and Lime Kiln man/Glazzer Day 500
60 10 LAB-00135 Telephone Operator Day 605
61 11 LAB-00108 Hand Driller Day 500
62 12 LAB-00109 Quarry Man Day 500
63 13 LAB-00081 Hammer Man Day 500
64 14 LAB-00110 Thatcher Day 500
65 15 LAB-00111 Fireman Day 500
66 16 LAB-00112 Cleaner/Helper Day 500
67 17 LAB-00113 Stone Packer Day 500
68 18 LAB-00114 Jawali Day 500
69 19 LAB-00115 Ex-Service man/Goorkha watchman Day 500
70 20 LAB-00116 Ratton Worker Day 500
71 21 LAB-00117 Mate Day 500
72 1 LAB-00066 Head Mazdoor (Mukaddar) Day 500
    (C) UNSKILLED WORKMEN    
73 2 LAB-00120 Man Mazdoor Day 460
74 3 LAB-00122 Watch Man Day 460
75 5 LAB-00121 Woman Mazdoor Day 460
76 6 (b) LAB-00123 Helper/Cleaners/Sweepers/Scavangers/Ch oukidars/Security Guards/Office Boys Day 445
77   Note :  Whenever unskilled workmen are engaged for cleaning of
Sewers & Septic Tanks, they may be paid double the above wages.
    (D) OTHER CONVEYANCE ITEMS  
78 1 LAB-00062 Single bullock with driver and cart Day
79 2   Bullock pair with driver Day
80 3 LAB-00061 Bullock pair with driver and cart Day
81 4 LAB-00140 Bullock pair with driver and cart with pneumatic tyres Day
82 5   Bullock pair driver and kapila Day
83 6 LAB-00063 Nava with crew Day
84 7 LAB-00141 Punt thundal Day
85 8 LAB-00142 Punt lascar Day
  Note:   1) The wage should not be less than the minimum wages of schedule of employment, subject to out turn.
      2)  25%  extra  over  the  corresponding  labour  rates  in  respect  of  the  work  to  be  done during night time subject to issue of certificate accordingly by the concerned estimate sanctioning authority for providing in the data and by the concerned Executive Engineer in charge of the work for payment.  The night time allowance is applicable only to the works  done  under  Greater  Visakhapatnam  Municipal  Corporation  and  Vijayawada Municipal Corporation only.

MATERIAL & WORK ITEM RATES

Si. No CFMS Code S.S.
Item No.
Description Unit (per) S o Rate for 2020-21 in Rs. Remarks
1 2 3 4 5 6 7
      (A) STONE AND ROAD MATERIALS      
      ROUGH STONE QUARRIED
INCLUDING WEDGING, BREAKING, BURNING, SPLITTING.
     
1 MAT-00405 22.a For    R.R    Masonry    Work    (other    than
Granite, Dolomite and Trap)
1 cum 171.45  
2 MAT-00341 b.i For SS Revetment work 225  mm 1 cum 150.00 As per WR Dept. (S.No.3) of Miscellaneous items
3 MAT-00176 b.ii For SS Revetment work 300  mm 1 cum 165.00 As per WR Dept. (M 003 of
Materials other than covered
under Irrigation items)
4 MAT-00406 b.iii For SS Revetment work 450  mm 1 cum 148.55  
5 MAT-00407 c Jeddy Stone above 450 mm to 600 mm 1 cum 196.20  
6 MAT-00408 d  i Laterite for revetment  225 mm 1 cum 129.50  
7 MAT-00409 d  ii Laterite for revetment  300 mm 1 cum 151.43  
8 MAT-00410 d iii Granite for SS revetment 225 mm 1 cum 168.55  
9 MAT-00411 d iv Granite for SS revetment 300 mm 1 cum 163.80  
      Note:-   Only   when   other   granite   is   not
available
     
10 MAT-00412 e Laterite for masonry 1 cum 148.55  
11 MAT-00413 f Cyclopean stones above 0.2 cum 1 cum 278.10  
12 MAT-00302 g For R.R.Masonry works ( granite, dolamite and trap variety) 1 cum 255.00 As per WR Dept. (M 148 of
Materials other than covered
under Irrigation items)
13     NOTE:- For items 22(a) to 22© and 22(g)
add extra Rs        /cum, wherever quarrying is done by blasting
1 cum 70.00  
      COURSED RUBBLE STONE QUARRYING  WEDGING, BREAKING,  BURNING  AND SPLITTING   FOR   SS  FIRST   SORT WORKS      
14 MAT-00414 23.a Granite, Dolamite and trap 1 cum 274.30  
15 MAT-00415 23.b For other varieties 1 cum 197.15  
16 MAT-00416 27 Granite stone slabs for culverts, lintels and copings  (3  faces  dressed  coarsed  rubble
masonry)
1 cum 1810.50  
17     NOTE: - For items 23(a), 23(b) and 27 add extra  Rs.   Per Cum, wherever quarrying is done by blasting 1 cum 82.00  
18 MAT-00417 28.a Bond stones ( 600 x 200 x 200 mm ) each 47.60  
19 MAT-00418 b Chainage   stones   and   Centre   line   stones (750x150x150 mm) each 47.60  
20 MAT-00419 31 Demarcation Stones ( 900 x 150 x 150 mm) each 85.70  
21 MAT-00420 32.a Guard Stones ( 1200 x 200 x 200 mm ) each 144.75  
22 MAT-00421 B Guide Stones ( 800 x 150 x150 mm ) each 97.15  
23 MAT-00422 C Carving  letters  and  figures  in  stone  up  to
100 mm size
each 9.50  
24 MAT-00423 D Carving  letters  and  figures  in  stone  above
100 mm size
each 10.50  
      HARD       BROKEN       STONE       OF GRANITE,   TRAP   AND     DOLERITE FREE   FROM   DUST   OBTAINED   BY QUARRYING,                       WEDGING,
BREAKING,          BURNING          AND SPLITTING
     
25 MAT-00215 33.a - do -    6mm      size (SS 5) 1 cum 568.00 As per WR Dept. (M 050 of
Materials excluding blasting charges Rs.70/- and Machine crushing charges @ 25%)
26 MAT-00216 b - do -   10mm      size (SS 5) 1 cum 716.00 As per WR Dept. (M 051 of
Materials excluding blasting charges Rs.70/- and Machine crushing charges @ 25%)
             
27 MAT-00217 c - do -    12mm      size (SS 5) 1 cum 848.00 As per WR Dept. (M 052 of
Materials excluding blasting charges Rs.70/- and Machine crushing charges @ 25%)
28 MAT-00218 d - do -  20mm      size (SS 5) 1 cum 1064.00 As per WR Dept. (M 053 of
Materials excluding blasting charges Rs.70/- and Machine crushing charges @ 25%)
29 MAT-00219 e - do -    25mm      size (SS 5) 1 cum 1024.00 As per WR Dept. (M 054 of
Materials excluding blasting charges Rs.70/- and Machine crushing charges @ 25%)
30 MAT-00220 f - do -    40mm      size (SS 5) 1 cum 640.00 As per WR Dept. (M 055 of
Materials excluding blasting charges Rs.70/- and Machine crushing charges @ 25%)
31 MAT-00424 g - do -   50mm      size (SS 5) 1 cum 434.30  
32 MAT-00425 h - do -    60mm      size (SS 5) 1 cum 399.05  
33 MAT-00426 i - do -   65mm      size (SS 5) 1 cum 360.95  
34 MAT-00427 j - do -    75mm      size (SS 5) 1 cum 289.50  
35 MAT-00428 k - do - 75 to 100mm   size (SS 5) 1 cum 236.20  
36     NOTE:- (1) Add extra Rs.    /- per cum for
items   33   (a)   to   33   (k)  if   the   metal   is obtained by blasting
1 cum 70.00  
37     (2) Add 25% extra per cum if the metal is obtained  by  machine  crushing  excluding
cost of blasting.
1 cum 25%  
38     (3) Deduct Rs.    /- per cum if the metal or
rubble  is  obtained  from  surface  stone  and boulders.
1 cum 9.90  
39     (4)  Add  Rs.     /-  per  cum  for  selection  of stones  and  boulders  from  excavated  spoil dumps  for  items  33  a  to  33  k,  when  this addition  of  Rs.    /-  per  Cum  is  allowed, deduction  of  Rs.   /-  per    Cum  mentioned under  Note (3) above should invariably be
made.
1 cum 17.00  
1 cum 9.90  
      SOFT  BROKEN  STONE  SCREENED AND FREE FROM DUST      
40 MAT-00429 33.l - do -     40 mm size  ( SS 5 ) 1 Cum 117.15  
41 MAT-00430 33.m - do -     50 mm size  ( SS 5 ) 1 Cum 105.70  
42 MAT-00431 33.n - do -     60 mm size  ( SS 5 ) 1 Cum 82.85  
43 MAT-00432 33.o - do -     65 mm size  ( SS 5 ) 1 Cum 74.30  
44 MAT-00433 33.p - do -     75 mm size  ( SS 5 ) 1 Cum 69.50  
      HARD       BROKEN       STONE       OF GRANITE    TRAP    DOLERITE    AND DOLAMITE     FREE     FROM     DUST OBTAINED         BY         QUARRYING WEDGING,    BREAKING,    BURNING AND SPLITTING    (QUARTZITE AND BASALT         WITH         AGGREGATE
IMPACT OF LESS THAN 20)
     
45 MAT-00434 33a -do- 2.36 to 5 mm size (IRC&MORTH) 1 cum 381.00  
46 MAT-00435 b -do- 5 to 7mm size (IRC&MORTH) 1 cum 504.00  
47 MAT-00436 c -do- 9.5 to 11.2mm size (IRC&MORTH) 1 cum 656.00  
48 MAT-00437 d -do-   12mm   to   14   mm   size   (   IRC   and
MORTH )
1 cum 742.85  
49 MAT-00438 e -do-  19  mm  to  22  mm  size  (  IRC  and
MORTH )
1 cum 937.15  
50 MAT-00439 f -do-  25  mm  to  27  mm  size  (  IRC  and
MORTH )
1 cum 899.05  
51 MAT-00440 g -do-  40  mm  to  45  mm  size  (  IRC  and
MORTH )
1 cum 560.00  
52 MAT-00441 h -do-  50  mm  to  55  mm  size  (  IRC  and
MORTH )
1 cum 456.00  
53 MAT-00442 i -do-  60  mm  to  63  mm  size  (  IRC  and
MORTH )
1 cum 419.00  
54 MAT-00443 j -do- 65 mm  size ( IRC and MORTH ) 1 cum 360.95  
55 MAT-00444 k -do- 75 mm  size ( IRC and MORTH ) 1 cum 289.50  
56   l NOTE:-  Add    extra  Rs.    /-  per  cum  for
items   33   (a)   to   33   (j)   if   the   metal   is obtained by blasting
1 cum 70.00 As proposed by WR Dept.
57   2 Add  25%  extra  per  cum  if  the  metal  is
obtained  by  machine  crushing  excluding cost of blasting.
1 cum 25% As proposed by WR Dept.
58   3 Deduct  Rs.       /-  per  cum  if  the  metal  or rubble is obtained from surface stones and
boulders
1 cum 9.90  
59   4 Add Rs.    /- per cum for selection of stones and boulders from excavated soil dumps for items 33 (a) to 33 (k), when this addition of Rs.    /-   per cum allowed deduction of Rs.
/- per cum mentioned under note (3) above should invariably be made
1 cum 17.00
9.90
 
      HARD    BROKEN    STONE    OTHER THAN  GRANITE SUCH  AS  QUARTZ,
QUARTZ-NAPA        AND        BASALT SCREENED AND FREE FROM DUST
     
60 MAT-00445 33.q -  do -    10 mm size  (SS 5) 1 Cum 367.60  
61 MAT-00446   -do-  9.5  mm  to  11.2  mm  size  (  IRC  and
MORTH )
1 Cum 367.60  
62 MAT-00447 r -  do -    12 mm size  (SS 5) 1 Cum 344.75  
63 MAT-00448   -do-   12mm   to   14   mm   size   (   IRC   and
MORTH )
1 Cum 344.75  
64 MAT-00449 S -  do -    20 mm size  (SS 5) 1 Cum 279.05  
65 MAT-00450   -do-  19  mm  to  22  mm  size  (  IRC  and
MORTH )
1 Cum 279.05  
66 MAT-00451 T -  do -    25 mm size  (SS 5) 1 Cum 273.35  
67 MAT-00452 U -  do -    40 mm size  (SS 5) 1 Cum 161.90  
68 MAT-00453   -do-  40  mm  to  45  mm  size  (  IRC  and
MORTH )
1 Cum 161.90  
69 MAT-00454 V -  do -    50 mm size  (SS 5) 1 Cum 142.85  
70 MAT-00455   -do-  50  mm  to  55  mm  size  (  IRC  and
MORTH )
1 Cum 142.85  
71 MAT-00456 33.w -  do -    65 mm size  (SS 5) 1 Cum 135.25  
72 MAT-00457   -do-  60  mm  to  65  mm  size  (  IRC  and
MORTH )
1 Cum 135.25  
73 MAT-00458 X -  do -    75 mm size  (SS 5) 1 Cum 111.45  
74 MAT-00459   -  do -    75 mm size ( IRC &MORTH) 1 Cum 111.45  
75 MAT-00460 Y -  do -    75 to 100  mm size  (SS 5) 1 Cum 87.60  
76 MAT-00461   -  do -    75 to 100  mm ( IRC& MORTH) 1 Cum 87.60  
      OTHER ITEMS      
77 MAT-00462 33.z1 Laterite 40 to 75 mm ( ring) 1 Cum 96.20  
78 MAT-00463 z2 kankar, hard broken kankar  40 to 75 mm ( ring ) 1 Cum 71.45  
79 MAT-00464 z3 Soling stone of 150 mm size of granite, trap
and Dolamite varieties.
1 Cum 90.50  
             
80     NOTE:- (1) Add extra for items   to 33(z3) Rs   /- Per cum, wherever quarrying is done by    blasting.    (2)    Wherever    controlled blasting  is  resorted  to  the  Chief  Engineer concerned  shall  approve  the  observed  data in support of SS item No. 22 a to 22 c , 22g,
23
1 Cum 70.00 As proposed by WR Dept.
81 MAT-00465 z4 Soling  stone  of  150  mm  size  other  than
granite variety
1 Cum 72.40  
82 MAT-00466 z5 Soling   Stone   laterite,   Kankar    150mm,
surface stone
1 Cum 44.75  
83 MAT-00467 z6 Field picked metal unbroken    20 mm size 1 Cum 58.10  
84 MAT-00468 z7 - do -   25 mm size 1 Cum 43.80  
85 MAT-00469 z8 - do -   40 mm size 1 Cum 50.50  
86 MAT-00470 z9 - do -   50 mm size 1 Cum 43.80  
87 MAT-00471 z10 - do -   60 mm size 1 Cum 38.10  
88 MAT-00472 z11 - do -  80 mm size 1 Cum 33.35  
89   NOTE:- Add Rs.  /- Per Cum for selection of stone and boulders from excavated spoil dumps for items 33 (Q) TO 33 Z , when this addition of Rs.   /- per Cum is allowed, deduction of Rs.    /- per Cum should invariably be made
towards the metal  or rubble if it is obtained from surface stone and boulders.
  17.00  
90 MAT-05253 34 Gravel 1 Cum 130.00 As per WR Dept. (M 008 of
Materials other than covered
under Irrigation Items )
91 MAT-00473 35 a Quarry rubbish 1 Cum 84.75  
92 MAT-00068 B HBG Stone Chips 2.36 mm and below 1 Cum 381.00 As per WR Dept. (Sl.No.67 of Materials)
93 MAT-00027 36.a Fine  aggregate  /  Sand  (un-screened)  for Concrete & Filtering items 1 Cum 510.00 As per WR Dept. (Si. No. 27 of Materials) and will be revised as per the Govt. new sand policy
94 MAT-00028 b. Fine   aggregate   /   Sand   (unscreened)   for filling 1 cum 375.00
95 MAT-00029 c Fine   aggregate   /   Sand   (screened)   for Mortar, Plastering items and Sand blasting items    (Rs.    90/-    is    added    towards screening charges) 1 Cum 605.00 As per WR Dept. (Si. No. 28 of Materials) and will be revised as per the Govt. new sand policy
96 MAT-00475 37 Clay for  puddle  and masonry  Items  38  (a) to 39 (h) As per local prevailing rates based on competitive quotations. 1 Cum 38.00  
      (C) LIME AND CEMENT      
97   40 to 41(c )     As per local prevailing rates based on competitive
rates
 
98 MAT-00005 42 Cement  excluding  cost  of  empty  cement bags 1 MT 3672/- Monthly rates will be communicated
by the Govt
  NOTE: (1) The rates are exclusive of VAT, Excise duty and  GST  2) The price of cement will be reviewed and fixed on monthly basis and rates will be communicated separately.    
99 MAT-00476 C Grinding lime mortar or Surkhi mortar 1 Cum 95.25  
100 MAT-00477 D Shell lime slaked and screened 1 Cum 940.00  
101 MAT-00478 E White cement 1 Kg. 27.95  
102     (D) MORTARS      
103   43 to
45
Items 43 to 45      
      (E) METAL AND IRON WORKS      
104     Mild steel rods 6mm dia. 1 MT Monthly rates communicated by the Govt  
105     Mild steel flats 1 MT
106     Mild  Steel,  Structural  Steel,  I.e.,  Angles,
Channels and I sections.
1 MT
107     High  Yield  Strength  Deformed  Bars/TMT
bars
1 MT
108     Mild steel plates 1 MT
    NOTE: (1) The rates are   exclusive  of  VAT, Excise duty and GST  2) The prices of steel will be reviewed and fixed on monthly basis and rates will be communicated separately.    
      III RATES OF WORKS      
      (A) CLEARING SITE      
109 MAT-00479 1.a Clearing heavy Jungle 1 Sqm 3.20  
110 MAT-00480 b Clearing light Jungle 1 Sqm 2.80  
111 MAT-00481 c Clearing Scrub Jungle 1 Sqm 2.80  
112 MAT-00482 d Clearing      Juliflora      (Prosafis)      jungle
including    up-rooting    and    removing    of Juliflora stumps.
1 Sqm 4.40  
113 MAT-00483 2.a.1 Cutting    and    removing    Palmyrah    trees
including stacking of girth 30 to 100 cm.
Each 21.00  
114 MAT-00484 a.2 - do -  100 to 200 cm. Each 48.00  
115 MAT-00485 2.b.1 Uprooting  and  removing  Palmyrah  stumps
including stacking of girth 30 to 100 cm.
Each 51.00  
116 MAT-00486 b.2 - do -  100 to 200 cm. Each 53.00  
117 MAT-00487 2.c.1 Cutting  and  removing  date  trees  including
stacking of girth 30 to 100 cm
Each 26.00  
118 MAT-00488 c.2 - do -  100 to 200 cm Each 39.00  
119 MAT-00489 2.d.1 Uprooting  and  removing  stumps  of    date trees  including  stacking  of  girth  30  to  100
cm.
Each 26.00  
120 MAT-00490 d.2 - do -  100 to 200 cm Each 33.00  
121 MAT-00491 2.e 1 Cutting  and  removing  other  kind  of  trees including stacking of girth 30 to 100 cm Each 33.00  
122 MAT-00492 e.2 - do -  100 to 200 cm Each 51.00  
123 MAT-00493 e.3 - do - above 200 cm Each 83.00  
124 MAT-00494 2.f.1 Uprooting  and  removing  stumps  of  other
kind of trees including stacking of girth 30 to 100 cm.
Each 26.00  
125 MAT-00495 f.2 - do -  100 to 200 cm Each 36.00  
126 MAT-00496 f.3 - do - above 200 cm Each 45.00  
127 MAT-00497 3.a Uprooting and clearing prickly pear jungle 1 Sqm 2.50  
128 MAT-00498 b -  do  -  under  2.5  meters  height  including
burning and burrying as directed.
1 Sqm 3.30  
129 MAT-00499 c -  do  -  over  2.5  meters  height  including
burning and burrying with an initital lead of conveyance
1 Sqm 3.90  
130 MAT-00500 4.a Removing   of   natchu,   goobi,   thooti   etc., from drains, channels including clearance if not more than 1 metre depth of water  with an  initial  lead  of  10  metresand  lift  of  2
metres.
1 Sqm 2.10  
131 MAT-00501 b.i Clearing alchi, tilla 1 Sq.m 4.20  
132 MAT-00502 b.ii Removal of Jammu 1 Sq.m 3.60  
133 MAT-00503 c.i Removal of imponea, cornea 1 Sq.m 4.00  
134 MAT-00504 c.ii Removal   of   water   hyacinth   upto  30   cm
thick.
1 Sqm 4.10  
135 MAT-00505 c.iii - do - more than 30 cm thick 1 Sq.m 5.50  
136 MAT-00506 d Removal  of  natchu,  goobi,  thooti  etc.,  for every extra lead or lift over  the initial  lead or lift. 1 Sqm 1.50  
      (B) DISMANTLING      
    5 DISMANTLING,    CLEARING    AWAY MATERIALS USEFUL FOR REUSE.      
137 MAT-00507 a.i Dry rough stone revetment for   aprons and stacking within 40 metres 1 cum 65.60  
    7 Drilling  holes  in  hard  granite  or  sheet rock      
    a) Manually ( Hand)      
138 MAT-00508 i) 20 mm dia meter 1 RM 136.00  
139 MAT-00509 ii) 25 mm dia meter 1 RM 144.00  
140 MAT-00510 iii) 36 mm dia meter 1 RM 166.00  
141   b) Pneumatic Compressor      
142 MAT-00511 i) 20 mm dia meter 1 RM 154.00  
143 MAT-00512 ii) 25 mm dia meter 1 RM 167.00  
144 MAT-00513 iii) 36 mm dia meter 1 RM 182.00  
    8 Grouting   the   holes   with   neat   cement slurry excluding cost of steel      
145 MAT-00514 i) 20 mm dia meter 1 RM 97.00  
146 MAT-00515 ii) 25 mm dia meter 1 RM 122.00  
147 MAT-00516 iii) 36 mm dia meter 1 RM 152.00  
      White Washing and Painting works      
148 MAT-00517 A White   washing   and   colour   banding   for guard  and  guide  stones  including  cost  of materials each 10.00  
149 MAT-00518 B 1 Screening sand and gravel 1 cum 10.50  
150 MAT-00519 B 2 Screening chips and metal 1 cum 17.60  
151 MAT-00520 C Removing    and    refixing    Hectometre    or Demarcation stones each 12.65  
      (S ) ROAD WORK ITEMS      
      PICKING OLD METALLED SURFACE TO DEPTH OF 40 TO 100 mm SPREADING OLD METAL AND NEW METAL SECTIONING INCLUDING EDGEBUNDS AND SUBGRADE ROLLING, SPREADING METAL INCLUDING BLINDAGE OFGRAVEL WATERING WITH AN INITIAL LEAD OF 2 HECTOMETERS AND HAND ROLLER ( 1.5 TO 2 TONNES) ROLLING ETC., INCLUDING BARRICADING, DIVERSION OF TRAFFIC AND WETTING THE NEW CONSOLIDATION FOR A FORTNIGHT COMPLETE      
    1 (i ) HARD METAL      
152 MAT-00521 A 40 mm thickness 10 sqm 70.00  
153 MAT-00522 B 50 mm thickness 10 sqm 74.00  
154 MAT-00523 C 75 mm thickness 10 sqm 80.30  
155 MAT-00524 D 100 mm thickness 10 sqm 87.00  
156   1 (ii ) (For compact thickness of soft metal)      
157 MAT-00525 A 50 mm thickness 10 sqm 53.80  
158 MAT-00526 B 75 mm thickness 10 sqm 63.90  
159 MAT-00527 C 100 mm thickness 10 sqm 70.10  
    5 Picking old metalled surface to a depth of
40   to   100   mm   and   spreading   metal including watering with an initial lead of
2  Hectometers  and  rolling  with  power rollers watering and spreading gravel for blindage     and     power     roller     rolling including hire charges of power roller( 8 to  10  T  )  barricading  and  diversion  of traffic and wetting the new consolidation for a fortnight(for compacted thickness of
)
     
      HARD METAL      
160 MAT-00528 5 (a) 40 mm thick ness 10 sqm 185.00  
161 MAT-00529 (b) 50 mm thick ness 10 sqm 210.00  
162 MAT-00530 (c ) 75 mm thick ness 10 sqm 231.00  
163 MAT-00531 (d ) 100 mm thick ness 10 sqm 248.80  
164 MAT-00532 (e) 150 mm thick excluding hire charges 10 sqm 445.40  
165 MAT-05455   Gelatin(For   MORTH   data,   for   works   of state & national high ways only) Per Kg 60.00 As per WR Dept. (M 104 of
Materials other than covered
under Irrigation Items)
166 MAT-00021   Electric  Detonators(For  MORTH  data,  for works of state & national high ways only) each 9.00 As per WR Dept. (Si. No. 21 of Materials of WR Dept.)
167 MAT-00273   Hot   applied   thermoplastic   compound(For MORTH   data,   for   works   of   State   & National high ways only) Per litre Rate as per local competitive quotations As per WR Dept. (M 118 of
Materials other than covered
under Irrigation Items)
168     Reflectionising    glass    beads    of    2    mm
thick(For MORTH data, for works of State & National high ways only)
Per Kg   deleted
169 MAT-00533   Road   marking   paint   confirming   to   IS
164(For MORTH data, for works of State &
Per Kg 152.15  
      National high ways only)      
170   n Labour charges for laying filters with coarse
aggregate.
1 cum 55.30  
171   o Labour charges for laying filter with sand. 1 cum 30.70  
172     Fly Ash 1 cum   deleted
173 MAT-00003   Binding Wire 1 Kg 56.00 As per WR Dept. (M 072 of
Materials other than covered under Irrigation Items)
174 MAT-00536   Jute rope Mtr 8.35  