ROYALTY CHARGES



 WRD:8. PRELIMINARY & MAINTENANCE WORKS 

AMOUNT OF ROYALTY CHARGES INCLUDED IN ITEM RATES

Item no Description of work unit

Amount of Royalty charges 

included in item rate in

      earth sand ca stone
8.12 200x200x750 mm boundary stone fixing Each 1.40 --- --- 4.75
8.13 Temperary BM in CC 1:4:8  Each --- 2.60 5.40 4.75
8.14 Permanent BM in CC 1:3:6 with UCR wall  Each --- 61.90 108.00 50.50
8.16 Reconstruction of revetmen sqm --- 15.80 --- ---
8.17 Reconstruction of rock-toe cum --- 10.10 --- ---
8.18 Resetting Shahbad slabs in CM 1:3  sqm --- 0.20 --- ---
8.22 Impervious hearting with borrow area soil  cum 30.00 --- --- ---
8.23 Semipervious casing with borrow area soil cum 30.00 --- --- ---
8.24 Impervious hearting using dump area soil  cum 30.00 --- --- ---
8.25 Semipervious casing with dump area soil  cum 30.00 --- --- ---
8.30 Cleaning gates by sand blasting  sqm --- 30.95   ---
8.39 40 mm th shotcreting in CC 1:2:2 propn  sqm --- 3.20 3.45 --- 

Notes:

1. In the Govt notification on royalty charges the rates for Earth / Sand / Building stone are on weight basis. For converting the rate per tonne to rate per cum for workingout the royalty charges for various work items following density values are conisdered
as per the circular of Mines & Geology No:GA.BU.E/D.C.B./KA.GA.GU./RA.PA.KO/ 2013-14 dt:13-03-2014.
Sand / Fine aggregate ( loose volume )                                                         : 1.72 tonne per cum
Stones/stone chips (loose volume)                                                                : 2.63 tonne per cum
Coarse aggregates (loose volume)                                                                : 1.80 tonne per cum
Soil (compacted to 95 percent density control)                                              : 1.50 tonne per cum

*****