SCHEDULE OF RATES



 WRD: 4. CANAL CROSS DRAINAGE WORKS SCHEDULE OF RATES FOR THE YEAR : 2018-19  

Item no Brief description of work Unit

Basic Rates

IN

1 2 3 4
  EXCAVATION & FOUNDATION TREATMENT WORKS :    

WRD:

4.1.

Excavation in all kinds of soil including boulders upto 0.60 m dia ( 0.113 cum ) for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed including cost of all materials, machinery,labour etc.complete with lead upto 50 m and lift upto 1.5 m. cum 245.00

WRD:

4.2.

Excavation in soft rock without blasting including boulders upto 0.60 m dia ( 0.113 cum ) for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed including cost of all materials, machinery, labour etc., complete with lead upto 50 m and lift upto 1.5 m cum .323.00

WRD:

4.3.

Excavation in soft rock requiring blasting including boulders upto 0.60 m dia (0.113 cum) for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed including cost of all materials, machinery, labour etc., complete with lead upto 50 m and lift upto 1.5 m. cum 355.00

WRD:

4.4.1.

Excavation in hard rock of all toughness by blasting including boulders above 0.6 m dia. 0.113 cum) for foundations of canal cross drainage and other appurtenant structures deploying jack hammers for dilling holes and placing the excavated hard rock neatly in specified dump area or stack yard as directed including cost of all materials, machinery, labour etc., complete with lead upto 50 m and lift upto 1.5 m. cum 633.00

WRD:

4.4.2.

Excavation in hard rock of all toughness including boulders above 0.6 m dia. ( 0.113 cum ) by approved controlled blasting methods for foundations of canal cross drainage and other appurtenant structures
adopting only jack hammers for drilling holes and using delay detonators for control of vibrations and by making muffling arrangements for control of fly-rock and by adopting any one or combination of line drilling / pre-splitting / smooth blasting techniques to minimise damage to rock beyond excavation line and placing the excavated hard rock neatly in approved dump area as directed including cost of all materials,machinery, labour etc., complete with lead upto 50 m and lift upto 1.5 m.
cum 832.00

WRD:

4.5.

Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel anchor rod with 1.25 m length driven into 38 mm dia hole drilled in bed rock and remaining length embedded in concrete / masonry including cost of all materials, machinery, labour, drilling and cleaning hole,filling hole with thick cement slurry, driving anchor rod etc.,complete with lead upto 50 m and all lifts. Each 1008.00
  STEEL AND CEMENT CONCRETE WORKS :    

WRD:

4.6.

Providing, fabricating and placing in position reinforcement steel bars for RCC works including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required, tying with 1.25 mm dia soft annealed steel wire, etc., complete with lead upto 50 and all lifts. kg 70.00

WRD:

4.7.

Providing, fabricating and fixing in position structural steel cutting edge consisting of 100 x 100 x 10 mm angle and 250 x 12 mm plate for sinking foundation wells including cost of all materials, machinery, labour, cleaning, cutting, bending, welding, providing anchors etc., complete with lead lead upto 50 m and all lifts. kg 74.00

WRD:

4.8.

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and depth of foundation upto 1.5 m from surface. Cement content: 240 kg / cum with use of super plasticiser ) Note: For every 1.5 m additional depth below 1.5 m from surface add

cum

cum

5509.00

39.00

WRD:

4.9.

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and depth of foundation upto 1.5 m from surface. Cement content: 210 kg / cum with use of super plasticiser )  Note: For every 1.5 m additional depth below 1.5 m from surface add

cum

cum

5202.00

39.00

WRD:

4.10

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and depth of foundation upto 1.5 m from surface. Cement content: 220 kg / cum with use of super plasticiser ) Note: For every 1.5 m additional depth below 1.5 m from surface add

cum

cum

5376.00

39.00

WRD:

4.11.

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 80 mm down approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and depth of foundation upto 1.5 m from surface. Cement content: 190 kg / cum with use of super plasticiser )  Note: For every 1.5 m additional depth below 1.5 m from surface add

cum

cum

5074.00

39.00

WRD:

4.12.

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and depth of foundation upto 1.5 m from surface. Cement content: 270 kg / cum with use of super plasticiser )  Note: For every 1.5 m additional depth below 1.5 m from surface add

cum

cum

5700.00

39.00

WRD:

4.13.

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for substructure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 300 kg / cum with use of super plasticiser )  Note: For every 1.5 m additional lift beyond 1.5 m from surface add

cum

cum

6577.00

78.00

WRD:

4.14.

Providing and laying insitu vibrated M-20 (28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for substructure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 330 kg / cum with use of super plasticiser ) Note: For every 1.5 m additional lift beyond 1.5 m from surface add

cum

cum

6984.00

78.00

WRD:

4.15.

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for substructure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 270 kg / cum with use of super plasticiser )  Note: For every 1.5 m additional lift beyond 1.5 m from surface add

cum

cum

6670.00

78.00

WRD:

4.16.

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N /sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for substructure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 250 kg / cum with use of super plasticiser )  Note: For every 1.5 m additional lift beyond 1.5 m from surface add

cum

cum

6378.00

78.00

WRD:

4.17.

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for well kerb including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating,finishing, curing etc., complete with lead upto 50 m and all lifts. ( Cement content : 330 kg / cum with use of super plasticiser )  Note: If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete. cum 8100.00

WRD:

4.18.

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for well
steining including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and all
lifts. ( Cement content : 300 kg / cum with use of super plasticiser )  Note: If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.
cum 7216.00

WRD:

4.19.

Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for well bottom plug by tremie or skip box method including cost of all materials, machinery, labour, batching, mixing, placing in position as per detailed specifications etc., complete with lead upto 50 m and all lifts. ( Cement content : 350 kg / cum with use of super plasticiser ) cum 5927.00

WRD:

4.20.

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for well top plug including cost of all materials, machinery,labour,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and all lifts. ( Cement content :
240 kg / cum with use of super plasticiser ) Note: If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.
cum 5015.00

WRD:

4.21.

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for well cap including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and all lifts. ( Cement content : 330 kg / cum with use of super plasticiser ) Note: If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete. cum 6292.00 

WRD:

4.22.1

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down approved, clean, hard, graded aggregates for piers
including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 210 kg / cum with use of super plasticiser )  Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add  2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

6213.00

78.00

WRD:

4.22.2

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for
abutments including cost of all materials, labour, machinery, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 210 kg /cum with use of super plasticiser )
Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add  2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

6044.00

78.00

WRD:

4.23.1

Providing and laying insitu vibrated M-20 (28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for piersincluding cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 300 kg / cum with use of super plasticiser )  Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add 2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete

cum

cum

7291.00

78.00

WRD:

4.23.2

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for abutments including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 300 kg / cum with use of super plasticiser ) Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add 2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

7094.00

78.00

WRD:

4.24.1

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for piers
including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 220 kg /cum with use of super plasticiser )  Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add  2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

6388.00

78.00

WRD:

4.24.2

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for abutments including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 220 kg /cum with use of super plasticiser ) Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add  2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

6219.00

78.00

WRD:

4.25.

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for cantiliver / counterfort retaining walls including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 300 kg / cum with use of super plasticiser )
Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add  2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

7113.00

78.00

WRD:

4.26.1.

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for piers
including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 240 kg / cum with use of super plasticiser )  Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add 2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

6724.00

78.00

WRD:

4.26.2.

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for gravity type retaining walls / abutments etc., including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content: 240 kg / cum with use of super plasticiser )  Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add  2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

6577.00

78.00

WRD:

4.26.3.

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for piers including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 210 kg / cum of plum concrete with use of super plasticiser )  Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add  2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

6086.00

78.00

WRD:

4.26.4

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravity type retaining walls / abutments etc., including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 210 kg / cum of plum CC with use of super plasticiser ) Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add 2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

5918.00

78.00 

WRD:

4.27.

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for cast in-situ pipes including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and all lifts. ( Cement content : 240 kg / cum with use of super plasticiser )  Note: If water is to be brought from other place add lead charges for water at at 500 litres / cum of concrete. cum 5955.00

WRD:

4.28.

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down approved, clean, hard, graded aggregates for cast in-situ pipes including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and all lifts. ( Cement content : 210 kg / cum with use of super plasticiser ) Note: If water is to be brought from other place add lead charges for water at at 500 litres / cum of concrete. cum 5647.00 

WRD:

4.29.

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for deck slab and kerb including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 330 kg / cum with use of super plasticiser )  Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add 2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

9148.00

78.00

WRD:

4.30.1

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for columns including cost of all materials, machinery, labour, formwork, scaffolding, cleaning,batching, mixing, placing in position, levelling, vibrating,finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface. ( Cement content : 330 kg / cum with use of super plasticiser) Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add  2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

.9066.00

78.00

WRD:

4.30.2

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for beams and slabs including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50m and lift upto 1.5 m from surface. ( Cement content : 330 kg / cum with use of super plasticiser ) Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add  2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

9354.00

78.00

WRD:

4.31.

Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with lead upto 50 m and all lifts. ( Cement content : 330 kg / cum with use of super plasticiser )  Note: If water is to be brought from other place add lead charges for water at at 500 litres / cum of concrete. cum 6042.00

WRD:

4.32.1

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for RCC troughs resting on ground including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and all lifts. ( Cement content : 330 kg / cum with use of super plasticiser ). Note: If water is to be brought from other place add lead charges for water at at 500 litres / cum of concrete. cum 7872.00

WRD:

4.32.2

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for RCC troughs for aqueduct including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m and scaffolding height upto 4.5 m from surface. ( Cement content : 330 kg / cum with use of super plasticiser )  Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add  2. For every 1.5 m increase in height of scaffolding beyond 4.5 m from surface add  3. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

cum

9228.00

78.00

355.00

WRD:

4.32.3

Providing and laying insitu vibrated M-25( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for RCC troughs for aqueduct including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m and scaffolding height upto 4.5 m from surface. ( Cement content : 360 kg / cum with use of super plasticiser )  Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add 2. For every 1.5 m increase in height of scaffolding beyond 4.5 m from surface add  3. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

cum

9459.00

78.00

355.00

WRD:

4.32.4

Providing and laying insitu vibrated M-30 ( 28 days cube compressive strength not less than 30 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for RCC troughs for aqueduct including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m and scaffolding height upto 4.5 m from surface. ( Cement content : 390 kg / cum with use of super plasticiser )  Note: 1. For every 1.5 m additional lift beyond 1.5 m from surface add  2. For every 1.5 m increase in height of scaffolding beyond 4.5 m from surface add  3. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

cum

9703.00

78.00

355.00

  FOUNDATION WELL SINKING WORKS :    

WRD:

4.33.

Sinking 4.50 m diameter RCC wells vertically for foundation of piers and abutments in all kinds of soil, sand and soft rock by kent-ledge or other approved method including cost of all materials, machinery, labour, disposal of excavated material as directed etc., complete with lead upto 50 m for disposal of excavated material. Upto 3 m depth from surface
Beyond 3 m upto 6 m from surface
Beyond 6 m upto 9 m from surface
Beyond 9 m upto 12 m from surface
Beyond 12 m upto 15 m from surface
Beyond 15 m upto 18 m from surface 
Beyond 18 m upto 21 m from surface 
Beyond 21 m upto 24 m from surface 
Beyond 24 m upto 27 m from surface
Beyond 27 m upto 30 m from surface
Note: For every 0.25 m increase in dia.of well increase basic rate by 12 percent

Rm

Rm

Rm

Rm

Rm

Rm

Rm

Rm

Rm

23316.00

29977.00

36638.00

43299.00

49963.00

56624.00

63284.00

69946.00

76608.00

WRD:

4.34.

Filling foundation well with sand in layers of 250 to 300 mm and compacting by watering, ramming as directed including cost of all materials, machinery, labour etc., complete with lead upto 50 m and all lifts. cum 1192.00
  BORED PILE FOUNDATION WORKS:    

WRD:

4.35.

Providing and constructing cast in-situ bored piles (excluding cost of providing and placing in position reinforcement steel) in M-20 (28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down approved clean, hard, graded aggregates for foundation of piers and abutments including cost of all materials, machinery,labour, cleaning, batching,mixing, placing concrete in position using tremie system, curing etc., complete with lead upto 50 m and all lifts. ( Cement content : 380 kg / cum with use of super plasticiser )    
4.35.1 Bored pile 900 mm diameter Rm 17016.00
4.35.2 Bored pile 1000 mm diameter  Rm 21008.00
4.35.3 Bored pile 1100 mm diameter  Rm 25419.00
4.35.4 Bored pile 1200 mm diameter Rm 30251.00
4.35.5 Bored pile 1300 mm diameter  Rm 35503.00
4.35.6 Bored pile 1400 mm diameter  Rm 41175.00
4.35.7 Bored pile 1500 mm diameter Note : If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete. Rm 47267.00
  PUMPED CONCRETE WORKS:    

WRD:

4.36.1

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for piers deploying batching plant, transit mixer and concrete pump including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 1 km and all lifts. ( Cement content: 370 kg / cum with use of super plasticiser )  Note: If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete. cum 6900.00

WRD:

4.36.2

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for abutments deploying batching plant, transit mixer and concrete pump including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 1 km and all lifts. ( Cement content: 370 kg / cum with use of super plasticiser )  Note: If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete. cum 6772.00

WRD:

4.36.3

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for columns / bracings of aqueduct sub-structure deploying batching plant, transit mixer and concrete pump including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 1 km and all lifts. ( Cement content : 370 kg / cum with use of super plasticiser ) Note: If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete. cum 8339.00

WRD:

4.37.

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down approved,clean, hard, graded aggregates for RCC troughs for aqueduct deploying batching plant, transit mixer and concrete pump including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 1 km and all lifts with height of scaffolding upto 4.50 m from surface. ( Cement content : 370 kg / cum with use of super plasticiser )
Note: 1. For every 1.5 m increase in height of scaffolding beyond 4.5 m from surface add  2. If water is to be brought from other place add lead charges for water at 500 litres / cum of concrete.

cum

cum

8736.00

355.00

  MASONRY WORKS :    

WRD:

4.38.

Providing and constructing un-coursed rubble stone masonry with approved stones in CM 1 : 4 proportion by volume for sub-structure portions of return walls / abutments including cost of all materials, labour, scaffolding, cleaning, batching and mixing mortar, packing mortar and wedging stone chips into joints, finishing, curing etc., complete with lead upto 50 m and depth of foundation upto 1.5 m from surface.  Note: For every 1.5 m additional depth below 1.5 m from surface add

 

cum

cum

 

3136.00

39.00

WRD:

4.39.

Providing and constructing un-coursed rubble stone masonry with approved stones in CM 1 : 4 proportion by volume for super-structure portions of return walls / abutments including cost of all materials,
labour,scaffolding, ramps, cleaning, batching and mixing mortar, packing mortar and wedging stone chips into joints,finishing,curing etc.,complete with lead upto 50 m and lift upto 1.5 m from surface.
Note: For every 1.5 m additional lift beyond 1.5 m from surface add

cum

cum

3294.00

78.00

WRD:

4.40.

Providing and constructing coursed rubble ( size stone ) face stone masonry second sort in CM 1 : 4 proportion by volume with stones from approved source including cost of all materials, machinery, labour, scaffolding, ramps,cleaning, batching and mixing mortar, packing mortar and wedging stone chips into joints, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface.
Note: For every 1.5 m additional lift beyond 1.5 m from surface add

cum

cum

3522.00

78.00

WRD:

4.41.

Providing and constructing coursed rubble ( size stone ) face stone masonry first sort in CM 1 : 4 proportion by volume with stones from approved source including cost of all materials, machinery, labour,
scaffolding, ramps, cleaning, batching and mixing mortar, packing mortarand wedging stone chips into joints, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m from surface.
Note: For every 1.5 m additional lift beyond 1.5 m from surface add

cum

cum

3697.00

78.00

WRD:

4.42

Providing cement mortar pointing to coursed rubble ( size stone ) face stone masonry in CM 1 : 2 proportion by volume including cost of all materials, labour, scaffolding, raking and cleaning joints for 50 mm depth, batching and mixing mortar, pressing mortar into joints, finishing, curing etc., complete with lead upto 50 m and all lifts. sqm 150.00

WRD:

4.43.

Providing cement mortar pointing to coursed rubble ( size stone ) face stone masonry in CM 1 : 3 proportion by volume including cost of all materials, labour, scaffolding, raking and cleaning joints for 50 mm depth, batching and mixing mortar, pressing mortar into joints, finishing, curing etc., complete with lead upto 50 m and all lifts. sqm 145.00

WRD:

4.44.

Providing 12 mm thick cement mortar plastering in CM 1:3 proportion by volume including cost of all materials, labour, scaffolding, cleaning joints /surface, batching and mixing mortar, smooth finishing, curing etc., complete with lead upto 50 m and all lifts. sqm 228.00

WRD:

4.45.

Providing 12 mm thick cement mortar plastering in CM 1:4 proportion by volume including cost of all materials, labour, scaffolding, cleaning joints /surface, batching and mixing mortar, smooth finishing, curing etc., complete with lead upto 50 m and all lifts. sqm 220.00

WRD:

4.46.

Providing 20 mm thick cement mortar plastering in CM 1:3 proportion by volume in two layers including cost of all materials, labour,scaffolding, cleaning joints / surface, batching and mixing mortar, smooth finishing, curing etc., complete with lead upto 50 m and all lifts. sqm 320.00

WRD:

4.47.

Providing 20 mm thick cement mortar plastering in CM 1:4 proportion by volume in two layers including cost of all materials, labour,scaffolding, cleaning joints / surface, batching and mixing mortar, smooth finishing, curing etc., complete with lead upto 50 m and all lifts. sqm 307.00
  COPING & RAILING WORKS :    

WRD:

4.48.1

Providing and fixing 100 mm thick roughly dressed burnt stone slabs for coping set in CM 1 : 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including cost of all materials, labour, batching and mixing mortar, finishing, curing etc., complete with lead upto 50 m and all lifts. sqm 804.00

WRD:

4.48.2

Providing and fixing 100 mm thick one line dressed burnt stone slabs for coping set in CM 1 : 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including cost of all materials, labour, batching and mixing mortar, finishing, curing etc., complete with lead upto 50 m and all lifts. sqm 977.00

WRD:

4.48.3

Providing and fixing 100 mm thick two line dressed burnt stone slabs for coping set in CM 1 : 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including cost of all materials, labour, batching and mixing mortar, finishing, curing etc., complete with lead upto 50 m and all lifts. sqm 1208.00

WRD:

4.49.

Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down approved clean, hard, graded aggregates for coping slab including cost of all materials, machinery, labour, formwork, cleaning surface, batching, mixing, placing in position, levelling, compacting, finishing, curing etc., complete with lead upto 50 m and lift upto 1.5 m. ( Cement content : 270 kg / cum with super plasticiser ) cum 7620.00

WRD:

4.50.

Providing and constructing protective railing consisting of cast in-situ railing posts of size 150 x 150 mm at bottom, 100 x 100 mm at top and 750 mm height, placed approximately at 2 m centre to centre in M-20 (28 days cube compressive strength not less than 20 N / sq mm) grade cement concrete using 20 mm down approved clean, hard, graded aggregates with each post reinforced by 4 numbers 8 mm dia.main bars embedded in kerb concrete for 400 mm depth and 5 numbers 6 mm dia. stirrups and fixing 3 rows of 40 mm dia. GI pipes with two coats of synthetic enamel painting over a coat of red oxide primer paint including cost of all materials, machinery, labour, formwork, s supports, fabricating and placing reinforcement bars, batching, mixing, placing in position, compacting, finishing, curing etc., complete with lead upto 50 m and all lifts. Rm 1414.00
  HUME PIPE LAYING & JOINTING WORKS :    

WRD:

4.51.1

Laying and jointing 300 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc., complete with lead upto 50 m and all lifts. Joint 419.00

WRD:

4.51.2

Laying and jointing 450 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc., complete with lead upto 50 m and all lifts. Joint 486.00

WRD:

4.51.3

Laying and jointing 600 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc., complete with lead upto 50 m and all lifts. Joint 630.00

WRD:

4.51.4

Laying and jointing 700 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc., complete with lead upto 50 m and all lifts. Joint 691.00

WRD:

4.51.5

Laying and jointing 800 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc., complete with lead upto 50 m and all lifts. Joint 837.00

WRD:

4.51.6

Laying and jointing 900 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc., complete with lead upto 50 m and all lifts. Joint 880.00

WRD:

4.51.7

Laying and jointing 1000 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc., complete with lead upto 50 m and all lifts. Joint 977.00

WRD:

4.51.8

Laying and jointing 1100 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc., complete with lead upto 50 m and all lifts. Joint 1042.00

WRD:

4.51.9

Laying and jointing 1200 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc., complete with lead upto 50 m and all lifts. Joint 1234.00
  BACK FILLING & OTHER WORKS :    

WRD:

4.52.

Providing rubble/ boulder and sand filling behind abutment and return walls in layers including cost of all materials, labour, watering, ramming etc., complete with lead upto 50 m and lift upto 1.5 m. cum 1240.00

WRD:

4.53.

Providing and filling murrum / gravely soil ( CNS soil ) for foundation or around pipes including cost of all materials, labour, spreading soil in layers of 100 to 150 mm, breaking clods, watering, compaction by earth masters to achieve density control of not less than 90 percent etc., complete with lead upto 50 m and all lifts. cum 684.00

WRD:

4.54.

Providing and filling murrum / gravely soil ( CNS soil ) above pipes including cost of all materials, machinery, labour, spreading soil in layers of 100 to 150 mm thickness, breaking clods, watering, compaction by power roller to achieve density control of not less than 95 percentm etc., complete with lead upto 50 m and all lifts. cum 416.00

WRD:

4.55.

Providing and fixing one line dressed 1110 x 350 x 250 mm thick IRC standard kilometre stone in M-10 (28 days cube compressive strength not less than 10 N /sqmm)grade cement concrete using 40 mm down approved clean, hard, graded aggregates including cost of all materials, labour, excavating pit of size 750 x 450 x 400 mm, batching and mixing concrete, embedding stone in concrete for 300 mm depth, providing two coats synthetic enamel paint of approved quality and colour to exposed surfaces, lettering on stone as directed, finishing, curing etc., complete with lead upto 50 m and all lifts. Each 1662.00

WRD:

4.56.

Providing and fixing one line dressed 650 x 150 x 100 mm thick IRC standard hectometre stone in M-10 ( 28 days cube compressive strength not less than 10 N / sqmm ) grade cement concrete using 40 mm down approved clean, hard, graded aggregates including cost of all materials, labour, excavating pit of size 500 x 450 x 400 mm, batching and mixing concrete, embedding stone in concrete for 300 mm depth, providing two coats synthetic enamel paint of approved quality and colour to exposed surfaces, lettering on stone as directed, finishing, curing etc., complete with lead upto 50 m and all lifts. Each 1164.00

*****