SOR 2019-20



SOR:2019-20

(PART-I)

(WATER RESOURCES DEPARTMENT WORK ITEMS)

PREAMBLE

I.0  AREA ALLOWANCES:

A) CORPORATIONS & MUNICIPALITIES:

a) (i)  25%  extra  over  the  rates  on  labour  component  of  works  is  allowed  in  all Municipal Corporation Limits of Andhra  Pradesh  except  Greater Visakhapatnam and Vijayawada municipal corporations (up to a belt of 12 Kms. from Municipal Corporation limits) and other corporations as notified by the Government from time to time.

(ii) 40%   extra  over   the   rates   on   labour   component   of   works   for   Greater Visakhapatnam and Vijayawada Municipal Corporation (up to a belt of 12 Kms. from Municipal Corporation limits).

(iii) 40% extra over the rates on labour component of works for Amaravati Capital City area(217 sq.km) as declared by the Govt.vide G.O.Ms.No.141,MA&UD (M2)Dept., dt:09.06.2015(This is introduced as per the Govt instructions issued in Govt.memo.No.668755/Reforms/2017 d:14.07.2017).

b) Allow 20%  extra  over  basic rates on  labour component  of  works in  all  District Headquarters and the remaining Municipal limits (up to a belt of 12 Kms from Municipal limits).

c) For works at Tirumala Hills in Chittoor District, 40% extra over the basic rates of labour component is allowed.

d) For works at Horsely hills in Chittoor District, 30% extra over the basic rates oflabour component is allowed.

e) For works located inside Tirumala Temple, 20% extra over the basic rate of labourcomponent specified for Tirumala Hills is allowed.

f)  For  Works  located  inside  T.T.D  Temples  of  Sri  Padmavathi  Ammavari  Temple,Tiruchanoor, Sri Govindaraja Swamy Temple at Tirupathi, Sri Kapleswara Swamy Temple, Kapilatheerthm, Tirupathi and Sri Kalyana Venkateswara Swamy Temple, Srinivasa Mangapuram , 20% extra over the basic rates of labour component for Tirupathi Municipal Corporation is allowed.

B)  JAIL COMPOUNDS:

20% extra is allowed over labour rates for the work in the Jail compounds. Only equivalent number of Man Mazdoor shall be provided in the Jail premises and no women Mazdoor are allowed inside.

C)  INDUSTRIAL AREA:

a. 20%  over  basic  rates  on  labour  component  works  allowed  for  works situated within 10Kms belt of Industrial area of, Ibrahimpatnam, Vuyyuru, Jaggaiahpeta in Krishna District, Macherla, Gurajala, Challapalli in Guntur District Garividi in Vijayanagaram District, Renigunta in Chittoor District and Yerraguntla & Mangampet in Kadapa District, Hindupur, Tadipatri, Anantapur, Guntakal, Rayalcheruvu, Yadiki of Anantapur District and Adoni, Dhone,Cement Nagar, Nandyal, Kurnool, Yemmiganur & Bethamcherla of Kurnool District, Anakapally of Vishakhapatnam District.

D) AGENCY / TRIBAL AREAS:

a) 25% extra is allowed for the works located within the interior Agency / Tribal limits,i.e. for the works located within & upto16 KMs from any all weather route inside Agency / Tribal.

b) 40% extra is allowed for the works located within the interior Agency / Tribal limits,i.e. for the works located beyond 16 KMs from any all weather route inside Agency / Tribal.

NOTE:

1. No extra percentage is permissible in respect of Forest produce such asBamboo, Rellu grass and for all materials obtained from outside the Agency / Tribal.

2.  The  extra  percentage  under  Agency  /  Tribal  areas  allowance  may  be allowed on the labour component and on the labour charges in the rates for conveyance of materials.

3. The extra percentage on cost of materials in Agency / Tribal areas can beallowed  on  the  labour  component  only,  if  they  are  manufactured  in the Agency / Tribal areas itself except Forest produce.

E) GHAT ROADS:

For Ghat Roads steeper than 1 in 20, the length of the road may be taken as 1.5 times the existing length of the road for the purpose of leads only for conveyance of materials based on the certificate for the Ghat Road given by the Superintending Engineer concerned.

Foot Note

Under compelling circumstances, the concerned Chief Engineer can adopt the equivalent length of road as 2 ½ times of actual length.

Note below area allowances:

If more than one area allowance ( such as those ) for (1) Municipalities (2)Agency / Tribal areas (3) Industrial areas are applicable for a particular situation, only the maximum out of the allowable percentages is to be allowed.

2.0 EXCAVATION OF TRIAL TRENCHES,TRIAL

PITS AND EXCAVATION IN RESTRICTED PLACES: -

I)  EXCAVATION OF TRIAL TRENCHES, TRIAL PITS AND

B.  TRIAL PITS:
1) Up to 2 Metres depth
25% extra
2) 2 Metres to 4 Metres depth 50% extra
3) 4 Metres to 6 Metres depth 75% extra
4) 6 Metres to 8 Metres depth 100% extra
5) 8 Metres to 9 Metres depth 150% extra
6) More than 9 Metres depth 200% extra

II)EXCAVATION IN RESTRICTED PLACES:-

I)       Foundation of Buildings …. 75% extra

II)      For pipe lines where the depth is lessthan 1.5 times the width

III)     For pipe lines where the depth is 1.5 times or more than the width….75% extra….120% extra

IV)     Silt removal in restricted areas such U.T’s., Culverts and Syphons….120% extra

V)     Excavation of field channels  ….75% extra

VI)     For narrow trenches not more than  2 meters in width and depth not lessthan twice the width and for excavation of road boundary drains, model sections of canals

VII)    High berm cutting of not more than 150 mm average thickness and sectioning for road….75% extra….50% extra

Note: 

1) The extra percentage is allowed over Common item for all earth works (COM-MWRK- Manual Works) for corresponding soil and Standard data items. It includes the charges for all lifts and initial lead but does not include dewatering charges if any in respect of all the items under (A) and (B) above.

2) The above extra percentages in respect of excavation in hard rock for restricted
places are to be allowed for (2/3)rd of the cost and shall not to be allowed in respect of items involving blasting component which may be taken as 1/3 of the cost.

3.0 SEIGNIORAGE CHARGES:

The rates of the materials indicated in the SOR are exclusive of Seigniorage

LABOUR RATES

Sl No. CATEGORY OF WORKER Rate Proposed by ENC(IW) for the year 2019-20
1 2 3
I. SKILLED CATEGORY:  
1 Bar bender 620
2 Black smith / Tin smith / Rivetor 490
3 Blaster 570
4 Carpenter Cl- I 570
5 Electrician ( Licensed ) 575
6 Fitter Cl- I 540
7 Floor Polisher / Tile Layer 490
8 Foreman 570
9 Gauge reader 475
10 Maistry / Work Inspector with Non-technical Qualification SSLC/SSC/HSC 520
11 Mason Cl- I / Brick layer Cl- I 490
12 Mechanic Cl- I 530
13 Operator Air compressor / DG set 505
14 Operator Batching plant 570
15 Operator Bus/Ambulance/ Lorry/ Tanker 570
16 Operator Concrete / Asphalt mixer 505
17 Operator Concrete / Asphalt paver 505
18 Operator Concrete pump / Placer/ ice plant 505
19 Operator Core drilling machine 570
20 Operator Crane/ Tower crane/ Cable way 570
21 Operator Drilling jumbo / Loco / Winch 505
22 Operator Grouting/ Guniting/ Shotcreting 505
23 Operator Jackhammer/Pneumatic tamper 505
24 Operator Pump / Ventilation fan 505
25 Operator Lathe/Drilling/Shearing machine 570
26 Operator Bending / Planing machine 505
27 Operator Road roller 505
28 Operator Shovel / Scraper / Dozer 570
29 Operator Spillway / Sluice gate 505
30 Operator Crusher / Conveyor / Mucker 505
31 Operator Tipper / Dumper / Transit mixer 570
32 Operator Concrete vibrator 505
33 Operator Vibratory plain / pad foot roller 505
34 Operator Wagon drill / Drifter 570
35 Painter Cl- I 570
36 Plumber / Pipe fitter 570
37 Sarang / Khalasi 505
38 Spun pipe moulder 505
39 Stone chiseller CI- I / Stone cutter Cl- l 510
40 Struct. steel Fabricator / Marker / Erector 615
41 Welder / Gas Cutter 510
42 Welder (X-ray quality) 570
II. SEMI SKILLED CATEGORY:  
1 Asphalt Sprayer / Boiler attendant 455
2 Bhisti 455
3 Boatman with boat 455
4 Carpenter Cl- II / Erector shuttering 455
5 Cartman with double bullock cart 515
6 Cartman with single bullock cart 485
7 Chavali / Navagani 455
8 Crowbarman / Jumper man 455
9 Fitter Cl- II 455
10 Gang man / Head / Survey mazdoor 455
11 Gardener / Trained mali 455
12 Air compressor / DG set 455
13 Helper Batching plant 460
14 Helper Blasting 460
15 Helper Bus/ Ambulance/ Lorry/ Tanker 460
16 Helper Bending/Shearing/Planing machine 460
17 Helper Carpenter 460
18 Helper Concrete / Asphalt mixer 460
19 Helper Concrete / Asphalt paver 460
20 Helper Core drilling machine 460
21 Helper Crane/ Tower crane/ Cable way 460
22 Helper Drilling jumbo / Loco / Winch 460
23 Helper Fitter / Fabrication/Electrician 460
24 Helper Grouting/ Guniting/ Shotcreting 460
25 Helper Jack hammer / Pneumatic tamper 460
26 Helper Laboratory / Instrumentation 460
27 Helper Road roller 460
28 Helper Shovel / Scraper / Dozer 460
29 Helper Crusher / Conveyor / Mucker 460
30 Helper Tipper / Dumper/ Transit mixer 460
31 Helper Vibrator 460
32 Helper Vibratory plain/ pad foot roller 460
33 Helper Wagon drill/ Drifter 460
34 Lineman Electric / Telephone 455
35 Mason Cl- ll / Brick layer Cl-II 455
36 Mechanic Cl- II 455
37 Painter Cl- II 455
38 Patkari / Neeraganti / Sowdy 455
39 Stone Chiseller Cl- II 455
40 Stone breaker / Hammer man 455
41 Valve man / Canal sluice operator 455
III. UN-SKILLED CATEGORY:  
1 Cement / Asphalt handling mazdoor 415
2 Civic worker 415
3 Man mazdoor 415
4 Woman  mazdoor 415
5 Watchman 415
IV. OTHER CATEGORY:  
1 Care-taker / conductor / Lift Attender 470
2 Cook / Mess man 470
3 Dhobi 470
4 Diploma Engineer / Surveyor 750
5 Diver with headgear 590
6 Graduate / Laboratory Assistant 580
7 Graduate Engineer/ Geologist 960
8 Horticulture Assistant / Photographer 475
9 ITI certificate holder / Tracer / Printer 580
10 Literate mazdoor 450
11 Stenographer / Computer Operator 630
12 Telephone / Wireless Operator 570
13 Typist / Job Typist 570
14 CAD operator with Diploma in Engineering/General degree 775
15 Jeep Driver 565
16 Data Processing Operator 775

Note:

1)The  wage  should  not  be  less  than  the  minimum  wages  of  schedule  ofemployment, subject to out turn.

2) 25% extra over the corresponding labour rates in respect of the work to be done during night time subject to issue of certificate accordingly by the concerned estimate sanctioning authority for providing in the data and by concerned Executive Engineer in charge of the work for payment. The night time allowance is applicable only to the works done under Greater Visakhapatnam Municipal Corporation and Vijayawada Municipal Corporation limits only. 

BASIC INPUT DATAFOR WATER RESOURCE WORK ITEMS STATEMENT OF RATES FOR MATERIALS FOR THE YEAR : 2019-20
GENERAL GUIDE LINES FOR REVISING RATES OF MATERIALS:

1 Average of the prevailing market rates, ignoring freak rates, is the criteria forFixing market rates for materials.

2 The rates for materials are exclusive of GST, duties and other local levies.

3 The rates for materials are exclusive of Seigniorage charges wherever applicable.

4 The rates for materials, except those for which lead charges are admissible as per the Statement of lead charges is for all leads.

5.The rates provided for useful rubble / stone chips from excavation shall be at dump yard.

6.Unless otherwise specified the rate of materials are inclusive of loading charges

Sl No. DESCRIPTION OF MATERIAL UNIT Rate Proposed by ENC(IW) for the year 2019-20
1 2 3 4
1 Acetylene gas cum 306
2 Asphalt 80/100 Grade Kg 41
3 Binding wire Kg 55
4 Burnt stone slab 10 cm thick sqm 283
5 Cement 43 Gr/53 Gr
Note: Rate as fixed by the Government
tonne 3900
6 Chequered plate Kg 57
7 Coarse aggregate 10-4.75 mm cum 860
8 Coarse aggregate 20-10 mm cum 1182
9 Coarse aggregate 40-20 mm cum 1133
10 Coarse aggregate 80-40 mm cum 622
  The aggregate rates mentioned above (from Sl.No.7 to
Sl.No.10) are exclusive of Seigniorage charges but including blasting charges of Rs.70/cum and 25% machine crushing charges. However, if the metal is obtained from hand broken, the blasting and crushing charges shall be deducted. The aggregate shall be HB Stone of Granite, Dolamite, Dolerite and Trap. (Quartzite and Basalt with aggregate impact of less than 20)
   
11 Coir brush Each 41
12 Copper sheet 16 SWG kg 632
13 Coursed rubble stone 30 x 30 x 45 cm Each 24
14 Coursed rubble stone 30 x 30 x 60 cm Each 27
15 Curing Compound Ltr 112
16 D – cord Rm 6
17 Delay - noiseless trunk Each 17
18 Detonating fuse coil Rm 7
19 Detonating shock tube / Cord relays Rm 33
20 Detonator delay type Each 18
21 Detonator electric Each 9
22 Detonator ordinary Each 5
23 Empty cement bag Each 5
24 Explosive ANFO kg 40
25 Explosive ANFO high strength booster kg 60
26 Explosive small dia ( Kelvex-220 or equivalent) kg 60
27 (a)Fine aggregate/ sand(un-  screened) for Concrete  & Filtering items) cum Rates to be finalized as per the Government sand policy
(b)Fineaggregate/Sand(unscreened)for filling
28 Fine aggregate /Sand (Screened) for Mortar
,Plastering
items and Sand blasting items (Rs.82 is added towards screening Charges)
cum
29 Geo-textile ( filter fabric ) 160 gsm sqm 89
30 Geo-textile ( filter fabric ) 200 gsm sqm 105
31 Geo-textile ( filter fabric ) 250 gsm sqm 120
32 G I Pipe 100 mm dia B Class Rm 698
33 G I Pipe 15 mm dia A class Rm 83
34 G I pipe 25 mm dia A class Rm 140
35 G I pipe 40 mm dia B class Rm 218
36 G I pipe 50 mm dia A class Rm 250
37 G I Pipe 80 mm dia B Class Rm 428
38 G.I Bolts / Nuts and Washers kg 95
39 G.I sheet ( plain ) tonne 55621
40 Hariyala turfing sods sqm 25
41 Hectometer stone one line dressed Each 259
42 Hemp yarn kg 64
43 Honne wood planks cum 43180
44 Hume pipe with collar 150 mm dia Rm 243
45 Hume pipe with collar 300 mm dia Rm 530
46 J- Bolts 30 cm long Each 35
47 Jungle wood planks cum 18390
48 Khandki stone 15 to 20 cm height Each 11
49 Khandki stone 20 to 25 cm height Each 15
50 Khandki stone 25 to 30 cm height Each 17
51 Kilometer stone one line dressed Each 477
52 LDPE sheet ( Geo membrane ) 500 micron sqm 81
53 LDPE sheet ( Geo membrane ) 750 micron sqm 119
54 LDPE sheet ( Geo membrane ) 1000 micron sqm 164
55 M S Bolts / Nuts / Washers kg 75
56 Murrum cum 195
57 Oxalic acid Ltr 70
58 Oxygen gas cum 40
59 PVC sealing strip Rm 40
60 PVC water stopper 310 mm wide Rm 415
61 PVC pipe of 100 mm dia Rm 150
62 Reinforcement steel (HYSD/TMT ) 
Note: As per Monthly rate fixed by Sub- Committee
tonne  
63 Resin bond Cement capsule Each 44
64 Rough stone 20 x 20 x 75 cm Each 23
65 Shahabad stone slab sqm 234
66 Stone chips (at dump yard/Spoil ) cum 184
67 Stone chips ( at quarry ) cum 347
68 Structural steel angle / channel / beam / bars Note: As per Monthly rate fixed by Sub- Committee tonne  
69 Structural steel plate / flats
Note: As per Monthly rate fixed by Sub- Committee
tonne  
70 Super Plasticizer (Conplast RP-264 or equivalent ) kg 45
71 Synthetic Enamel paint 1st quality Ltr 224
72 Synthetic adhesive ( Resin + Hardener ) Kg 292
73 Tar felt joint filler board 12 mm thick sqm 336
74 Tar felt joint filler board 20 mm thick sqm 510
75 Through stones 20 x 20 x 30 to 45 cm Each 22
76 Through stones 25 x 25 x 45 to 60 cm long Each 39
77 Through stones 30 x 30 x 65 to 75 cm long Each 58
78 Un-coursed rubble stones ( at dump yard
/Spoil)
cum 154
79 Un-coursed rubble stones ( at quarry) cum 316
80 Water proofing compound kg 67
81 Welding electrodes 4 mm dia Each 12
82 Wire brush Each 38
83 Wire mesh 20 gauge sqm 214
84 Zinc chromate red oxide primer paint sqm 150
85 inorganic zinc silicate ltr 502
86 solvent less coal tar epoxy paint ltr 244
87 Zinc phosphate primer ltr 186
88 Allkyd based iron oxide paint ltr 150
89 a) Cost of hdpe (90mm dia) rm 203
90 welded steel wire fabric 100X100X5 mm size kg 423
91 Protective Mastic ltr 172
92 Solventless coal tar epoxy (brown) ltr 256

ADDITIONAL MATERIALS FOR G A T E S & HOISTS FOR THE YEAR: 2019-20

GUIDE LINES

a. For cast steel / Alloy steel / Forged steel / Bronze, aluminum alloy components the rates shall be inclusive of cost of basic metal for these components, casting / forging charges, machining charges and applicable excise duty on finished alloy component.

b. For other materials the rates shall be prevailing market rates. 

Sl No. DESCRIPTION OF MATERIAL UNIT Rate Proposed by ENC(IW) for the year 2019-20
1 2 3 4
1 Alloy steel ( IS : 1570-carbon steel ) shafts Kg 222
2 Alloy steel ( IS : 1570-stainless steel ) pins Kg 408
3 Bolt / Nut / Washer ( hot dipped galvanized ) Kg 132
4 Bolt / Nut / Washer ( stainless steel ) Kg 345
5 Bronze/Aluminum alloy(IS:305)bearings/bushes Kg 890
6 Cast iron blocks Kg 80
7 Cast steel drums / gears Kg 215
8 Cast steel pinions Kg 210
9 Cast steel wheels / pulleys / hubs / rollers / Retainers Kg 179
10 Chemical for de-greasing/ de- rusting/phosphate Ltr 116
11 Coal tar epoxy paint Ltr 175
12 Forged steel hooks / shackles Kg 254
13 MS pipe 200 / 300 mm dia Kg 163
14 MS pipe 32 mm dia Rm 174
15 MS pipe 25 mm dia Rm 141
16 Rubber bottom seal ( IS : 11855 ) (100mmX14 mm) Rm 632
17 Rubber side seal ( music note type Teflon claded )  ( IS : 11855 ) (36ØX113mmX14mm) Rm 1350
18 Rubber side seal ( music note type uncladed ) ( IS : 11855 )
(36ØX113mmX14mm)
Rm 979
19 Rubber side seal Z-type ( IS : 11855 ) (36ØX120mmX19mm) Rm 1295
20 Rubber corner seal ( Teflon claded ) ( IS : 11855 ) (36Ø) Each 1359
21 Rubber corner seal ( un claded ) ( IS : 11855
) (36Ø)
Each 959
22 Stainless steel plates / flats kg  

23

Welding electrode 4 mm dia x 450 mm ( radiographic low hydrogen ) Each 15
24 Welding electrode 4 mm dia x 450 mm ( stainless steel ) Each 21
25 Wire rope 6x37 constn ( IS : 2266 ) kg 176
26 Zinc kg 180
27 Zinc rich ( zinc content : 90 % ) epoxy primer ltr 562

MATERIALS FOR POWER SUPPLY WORKS FOR THE YEAR : 2019-20

Sl No. Description of Material Unit Rate Proposed by ENC(IW) for the year 2019-20
1 Electric pole with fixtures Each For establishing Electrical Sub- Stations at the Project Sites wherever necessary, the rates approved by APTRANSCO may be followed.
2 Flood light 500 W Each
3 Flood light set Each
4 Flouscent tube light 40 W Each
5 Flouscent tube light set Each
6 HT / LT Circuit breaker with accessories Set
7 HT / LT Line conductor 1000
8 PVC Armoured cable 10 sqmm and below Rm
9 PVC Armoured cable 16 sqmm Rm
10 PVC Armoured cable 25 sqmm Rm
11 PVC Armoured cable 70 sqmm Rm

DETAILS OF CAPITAL COST OF MACHINERY/ EQUIPMENT FOR THE YEAR:2019-20 GUIDE LINES FOR FIXING CAPITAL  COST OF MACHINERY/ EQUIPMENT: 

1.  The Capital cost of  machinery  / equipment shall be for new machinery / equipment and shall be exclusive of GST, duties, other levies.

2. The cost of transport vehicles / equipment shall be exclusive of cost of tyres and tubes.

3. The cost of drill rods / drill bits / air hose / water hose / road tax / insurance charges andOther consumable accessories shall not be included in the capital cost.

4. In cases, where the current capital cost of machinery / equipment could not be collected through enquiries, the capital cost considered for previous year may be updated on the basis of average percentage increase / decrease in the index for machinery published in theR.B.I Bulletin.

Sl No: DESCRIPTION OF MACHINERY / EQUIPMENT UNIT Rate Proposed by ENC(IW) for the year 2019-20
1 2 3 4
1 Agitator car / Transit mixer 2 cum ( excluding tyres ) Each 1787168
  tyres and tubes 6 sets   71488
2 Air compressor 5 cmm electric Each 590185
3 Air compressor 7 cmm diesel Each 789682
4 Air compressor 7 cmm electric Each 719021
5 Air compressor 8.5 cmm diesel Each 901895
6 Air compressor 8.5 cmm electric Each 930993
7 Air compressor 15 cmm electric Each 1138797
8 Angle Dozer 90 hp Each 4551040
9 Batching plant 0.5 cum with accessories(6 Cum/hr) Each 997486
10 Batching plant 2 x 1.00 cum with accessories ( 15 Cum/hr) Each 3528615
11 Batching plant 2 x 1.50 cum with accessories ( 50 Cum/hr) Each 5403066
12 Bending machine Each 480414
13 Clamp shell and hoisting ropes Each 27198
14 Concrete bucket 1.5 cum Each 46549
15 Concrete hand mixer 45/30 ltr Each 12884
16 Concrete mixer 300/200 ltr(diesel) Each 124688
17 Concrete mixer 300/200 ltr ( electric ) Each 120530
18 Concrete mixer 600/400 ltr(diesel) Each 216120
19 Concrete mixer 600/400 ltr ( electric ) Each 211962
20 Concrete paver 100 Sqm / hr Each 1962563
21 Convey mucker ( excluding tyres ) Each 3204429
  tyres and tubes 6 sets   71488
22 Core drilling machine Each 914360
23 Diesel generating set 30 KVA Each 411459
24 Diesel generating set 50 KVA Each 531989
25 Diesel Loco 45 hp Each 1762228
26 Dewatering pump 5 hp diesel Each 33246
27 Dewatering pump 5 hp electric Each 20362
28 Dewatering pump 10 hp diesel Each 49879
29 Dewatering pump 10 hp electric Each 45721
30 Dewatering pump 20 hp diesel Each 157934
31 Dewatering pump 20 hp electric Each 83126
32 Drifter Each 879449
33 Drilling jumbo ( excluding tyres ) Each 1082277
  tyres and tubes 6 sets   71488
34 Dumper 4.5 cum ( excluding tyres ) Each 1205299
  tyres and tubes 6 sets   71488
35 Geophysical Ele.resistivity meter Each 444194
36 Grouting pump Each 84791
37 Guniting / sand blasting equipment Each 253800
38 Ice plant with accessories 30 t / day Each 2132135
39 Jack hammer Each 54027
40 Needle vibrator 40 mm petrol Each 16623
41 Needle vibrator 40 mm electric Each 17461
42 Needle vibrator 60 mm petrol Each 17870
43 Needle vibrator 60 mm electric Each 21200
44 Planing machine 4 m stroke Each 707027
45 Plate shearing machine up to 12 mm Each 385242
46 Pneumatic placer 0.5 cum Each 482120
47 Pneumatic tamper Each 70651
48 Pug cutting machine Each 14508
49 Pusher leg Each 47131
50 Road roller diesel 10 t Each 706557
51 Shovel 0.50 cum 75 hp Each 3117156
52 Shovel 0.85 cum 110 hp Each 5303318
53 Stationery derrick crane 5 t Each 542799
54 Tipper 5 cum ( excluding tyres ) Each 1350769
  tyres and tubes 6 sets   71488
55 Tipping tub 1.5 cum Each 199497
56 Tower crane 5 tonne Each 6213520
57 Transformer 250 KVA Each 433395
58 Truck 10 t ( excluding tyres ) Each 1226081
  tyres and tubes 6 sets   71488
59 Truck mounted derrick crane 5 t ( excluding tyres Each 1629233
  tyres and tubes 6 sets   71488
60 Upright drilling machine Each 46549
61 Ventilation fan 20 hp Each 235676
62 Vibratory pad foot roller 8 t Each 2452162
63 Wagon drill Each 540306
64 Water tanker 8000 ltr (excluding tyres) Each 1329773
  tyres and tubes 6 sets   71488
65 Welding set Each 43218
66 Winch 35 hp electric Each 311721
67 Hydraulic Truck Crane 30T Each 12039897
  tyres and tubes 6 sets   153960
68 Hydraulic Truck Crane 16T Each 8637319
  tyres and tubes 6 sets   153960
69 Heavy Duty Airless Spray Painting Equipment Each 405451
70 Concrete Placer Pump(25 Cum/hr)(Electric) Each 2829905

ACCESSORIES TO MACHINERY / EQUIPMENT FOR THE YEAR : 2019-20

Sl No. DESCRIPTION OF MATERIAL UNIT Rate Proposed by ENC(IW) for the year 2019-
20
1 2 3 4
1 Jaw crusher 900 x 500 mm ( 120 tph ) with 50 hp motor Each These items are no where being used in the Standard Data. Hence this may be deleted from SoR
2 Jaw crusher 500 x 300 mm ( 60 tph ) with 30 hp motor Each
3 Jaw crusher 400 x 225 mm ( 10 tph ) with 25 hp motor Each
4 Jaw plates 900 x 500 mm ( serreted ) Set
5 Jaw plates 500 x 300 mm ( serreted ) Set
6 Jaw plates 400 x 225 mm ( serreted ) Set
7 Nylon Conveyor belt 3 ply 600 mm width Rm
8
 
Nylon Conveyor belt 3 ply 1000 mm width   Rm

ACCESSORIES TO MACHINERY / EQUIPMENT FOR THE YEAR : 2019-20:

Sl No. DESCRIPTION OF MATERIAL UNIT Rate Proposed by ENC(IW) for the year 2019-20
1 2 3 4
1 Casing shoe bit Each 10480
2 Diamond core bit BX size Each 10580
3 Diamond core bit NX size Each 12700
4 Double tube core barrel Each 13540
5 Extension drill rod with coupling sleeve Rm 1921
6 Jack hammer drill rod 1.5 m Each 3647
7 Jack hammer drill rod 2.5 m Each 5670
8 Nozzle for Guniting / sand blasting gun Each 633
9 Paving Cylinder Each 28030
10 Rails 30R ( 30 kg / m ) tonne 51400
11 Reamer shell Each 5140
12 T.C. Cross bit 50 mm dia Each 4990
13 T.C. Cross bit 75 mm dia Each 9980
14 T.C. Cross bit 100 mm dia Each 11980
15 Tyres and Tubes for truck Set 14580
16 Wire rope 16 mm dia Rm 260
17 Excavation of drain with Excavator cum 38

AGGREGATE CRUSHING & PROCESSING PLANT  FOR THE YEAR : 2019-20:

OTHER COSTS ON MATERIAL/MACHINERY/EQUIPEMENT FOR THE YEAR:2019-20:

Sl No. DESCRIPTION OF MATERIAL UNIT Rate Proposed by ENC(IW) for the year 2019-
20
1 2 3 4
1 Jaw crusher 900 x 500 mm ( 120 tph ) with 50 hp motor Each These items are no where being used in the Standard Data. Hence this may be deleted from SoR
2 Jaw crusher 500 x 300 mm ( 60 tph ) with 30 hp motor Each
3 Jaw crusher 400 x 225 mm ( 10 tph ) with 25 hp motor Each
4 Jaw plates 900 x 500 mm ( serreted ) Set
5 Jaw plates 500 x 300 mm ( serreted ) Set
6 Jaw plates 400 x 225 mm ( serreted ) Set
7 Nylon Conveyor belt 3 ply 600 mm width Rm
8 Nylon Conveyor belt 3 ply 1000 mm width Rm

Other Costs On Material/Machinery/Equipment

1. The rate provided for ' SUNDRIES' (Lump sum provision for unquantified inputs in the datarates) shall be updated on the basis of general percentage increase / decrease in the market rates or on the basis of R.B.I ' All Commodity' index.

2 .The rate for structural steel fabrication shall include cost of all materials (exceptstructural steel), machinery, labour and one coat of primer painting.

3. Demand charges and electric power charges shall be as per prevailing APEPDCL tariff.

4. Rate of interest on capital cost shall be as approved by Govt or other competent authority.

Sl No. DESCRIPTION OF MATERIAL UNIT Rate Proposed by ENC(IW) for the year 2019-20
1 2 3 4
1 Air hose 25 mm dia Rm 164
2 Air hose 50 mm dia Rm 254
3 Demand charges (HT-I : General-11 KV category) on power supply(as per APEPDCL tariff) KVA /
month
475
4 Diesel Ltr 76
5 Electric power (HT-VIII Category) including tax ( 1.5 times of the Tariff of HT-I(A):General-11 KVA Category) (as per APEPDCL tariff) Kwhr 10
6 Excise duty on Gates / Hoist supplies % 0%
7 Insurance charges on machinery % / annum 1%
8 Interest on capital cost % / annum 11.00%
9 Lubricants Ltr 220
10 Petrol Ltr 84
11 Rivets Kg 85
12 Road tax on transport vehicles Rs./annum As per RTA
13 Shalimatic sealing compound Kg 85
14 Shutter oil Ltr 44
15 Structural steel fabrication Kg 28
16 Sundries ( Lump sum for un quantified inputs ) LS 31
17 Water hose ( pressure ) 20 mm dia Rm 164
18 Steel wedges LS 15
19 Elbows / Nipple / Plugs etc., LS 15
20 Soldering materials LS 15
21 Steam circulation arrangement LS 15
22 Fuel charges ( gas for heating ) LS 17
23 Vulcanizing materials LS 18
24 Other accessories / controls / junctions LS Deleted
25 Miscellaneous fittings / switches etc LS Deleted
26 Anchors / supports for cables / lights LS Deleted
27 Civil works for foundations / pedestals / duct etc LS Deleted
28 Gas cutting set ( 2 No’s 15 m hose and nozzle Each 12797
29 Grease Kg 243
30 Welding holder set ( cable / holder / gloves / mask Each 6884
31 Use rate of ropes LS 156

MATERIALS FOR GATES AND HOISTS FOR THE YEAR : 2019-20:

Sl No. DESCRIPTION OF MATERIAL UNIT Rate Proposed by ENC(IW) for the year 2019-20
1 Worm reducers Each 177990
2 Electric motor 20 hp(Double Shaft) Each 96009
3 Electric motor 17.5 hp(Double Shaft) Each 68055
4 Electric motor 12.5 hp(Double Shaft) Each 57583
5 Electric motor 5 hp(Double Shaft) Each 26176
6 Electric motor 3 hp (Double Shaft) Each 18319
7 Electric motor 2 hp (Double Shaft) Each 10002
8 Floating shaft 300 mm dia Kg 153
9 Manual operating system Each 26809
10 Gate position indicator Each 161899
11 Ele-magnetic brake Each 27923
12 Electric cable / switch / control panel etc LS 45425
13 Wire rope sockets Each 4393

Materials other than covered under WR Workitems For the year 2019-20 

GENERAL GUIDE LINES FOR REVISING RATES OF MATERIALS:

1.  Average of the prevailing market rates, ignoring freak rates, is the criteria forFixing market rates for materials.

2 .The rates for materials is inclusive of GST, duties and other local levies.

3 .The rates for materials are exclusive of Seigniorage charges wherever  applicable.

4 .The rates for materials, except those for which lead charges are admissible as per the Statement of lead charges is for all leads.

Sl. No. Description Rate Proposed by ENC(IW) for the year 2019-20
1 2 4
M-002 Quarried stone 150 - 200 mm size for Hand Broken 145
M-003 Boulder with minimum size of 300 mm for Pitching 160
M-004 Coarse  sand  for  filling Rate as per item no.27(b) of material of WRD
M-005 Coarse   sand   for   mortar Rate as per item no.27(a) of material of WRD
M-006 Fine Sand Rate as per item no.28 of material of WRD
M-007 Murrum Rate as per item no.56 of Material rates of WRD.
M-008 Gravel/Quarry spall 113
M-009 Granular Material or hard Murrum for GSB works Deleted
M-010 Granular Material or hard Murrum for GSB works 95
M-011 Fly ash conforming to IS: 3812 ( Part II & I) 64
  For item No.M-012 to M-055 the note shall be as follows
1) The rates mentioned are exclusive of Seigniorage charges but inclusive of blasting charges of Rs.70/cum and 25% machine crushing charges. However, if the metal is obtained by hand broken, machine crushing charges shall be deducted.
2) If the material is obtained by hand broken from surface boulders/canal spoil, the blasting and crushing charges shall be deducted.
3)The material shall be HB Stone of Granite, Dolamite, Dolerite and Trap.(Quartzite and Basalt with aggregate impact of less than 20)
 
M-012 Filter media/Filter Material as per Table 300-3 (MoRT&H Specification) 335
M-013 Close graded Granular sub-base Material 53 mm to
9.5 mm
650
M-014 Close graded Granular sub-base Material 37.5 mm to
9.5 mm
670
M-015 Close graded Granular sub-base Material 26.5 mm to
9.5 mm
709
M-016 Close graded Granular sub-base Material 9.5 mm to
4.75 mm
590
M-017 Close graded Granular sub-base Material 9.5 mm to
2.36 mm
580
M-018 Close graded Granular sub-base Material 4.75mm to
2.36 mm
510
M-019 Close graded Granular sub-base Material 4.75mm to 75 micron mm. 485
M-020 Close graded Granular sub-base Material 2.36 mm 485
M-021 Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve. 350
M-022 Coarse graded Granular sub-base Material 2.36 mm
& below
430
M-023 Coarse graded Granular sub-base Material 4.75mm to 75 micron mm 465
M-024 Coarse graded Granular sub-base Material 4.75 mm to 2.36 mm 465
M-025 Coarse graded Granular sub-base Material 9.5 mm to
4.75 mm
565
M-026 Coarse graded Granular sub-base Material 26.5 mm to 4.75 mm 618
M-027 Coarse graded Granular sub-base Material 26.5 mm to 9.5 mm 619
M-028 Coarse graded Granular sub-base Material 37.5 mm to 9.5 mm 684
M-029 Coarse graded Granular sub-base Material 53 mm to 26 .5mm 848
M-030 Aggregates below 5.6 mm 557
M-031 Aggregates 22.4 mm to 2.36 mm 911
M-032 Aggregates 22.4 mm to 5.6 mm 1037
M-033 Aggregates 45 mm to 2.8 mm 660
M-034 Aggregates 45 mm to 22.4 mm Cum Rate as per item no.9 of Material rates of WRD.
M-035 Aggregates 53 mm to 2.8 mm Cum 911
M-036 Aggregates 53 mm to 22.4 mm Cum 860
M-037 Aggregates 63 mm to 2.8 mm Cum 705
M-038 Aggregates 63 mm to 45 mm Cum 655
M-039 Aggregates 90 mm to 45 mm Cum Rate as per item no.10 of Material rates of WRD.
M-040 Aggregates 10 mm to 5 mm Cum Rate as per item no.7 of Material rates of WRD.
M-041 Aggregates 11.2 mm to 0.09 mm Cum 700
M-042 Aggregates 13.2 mm to 0.09 mm Cum 795
M-043 Aggregates 13.2 mm to 5.6 mm Cum 915
M-044 Aggregates 13.2 mm to 10 mm Cum 1020
M-045 Aggregates 20 mm to 10 mm Cum Rate as per item no.8 of Material rates of WRD.
M-046 Aggregates 25 mm to 10 mm Cum 1120
M-047 Aggregates 19 mm to 6 mm Cum 1035
M-048 Aggregates 37.5 mm to 19 mm Cum 1095
M-049 Aggregates 37.5 mm to 25 mm Cum 1135
M-050 Aggregates 6 mm nominal size Cum 725
M-051 Aggregates 10 mm nominal size Cum 920
M-052 Aggregates 13.2/12.5 mm nominal size Cum 1080
M-053 Aggregates 20 mm nominal size Cum 1340
M-054 Aggregates 25 mm nominal size Cum 1290
Part I - Materials not covered under WR Work items basic data – Common SoR 2019-20
M-055 Aggregates 40 mm nominal size Cum 830
M-056 AC pipe 100 mm dia Metre Rate as per PH item
M-057 Acrylic polymer bonding coat Litre 465
M-058 Aluminum Paint Litre 265
M-059 Aluminum alloy plate 2mm Thick Sqm 335
M-060 Aluminum alloy/Galvanized steel Tonne 61,250
M-061 Aluminum sheeting fixed with encapsulated lens type
reflective   sheeting    including   2%   towards lettering,  cost  of  angle  iron,  cost  of  drilling
Sqm 835
M-062 Aluminum studs 100 x 100 mm fitted with lens reflectors No’s As per local market rate
M-063 Barbed wire K 70
M-064 Bearing (Cost of parts) No’s 500
M-065 Bearing (Cast steel rocker bearing assembly of 250 tonne ) No’s 690
M-066 Bearing (Elastomeric bearing assembly consisting of
7 internal layers of elastomer bonded to 6 nos. internal reinforcing steel laminates by the
Cm3 As per Market Competitive rates.
M-067 Bearing (Forged steel roller bearing of 250 tonne) No’s
M-068 Bearing (Pot type bearing assembly consisting of a metal piston supported by a disc, PTFE pads providing sliding surfaces against stainless steel mating together with cast steel assemblies/fabricated structural steel assemblies duly painted with all components No’s
M-069 Bearing (PTFE sliding plate bearing assembly of 80 tonnes ) No’s
M-070 Bearing (Supply of sliding plate bearing of 80 No’s
M-071 Bentonite K 7.0
M-072 Binding wire K
g
Rate as per item no.3 of Material rates of WRD.
M-073 Bitumen ( Cationic Emulsion ) Tonne As per rates fixed by R&B Dept based on refinery rates
M-074 Bitumen (60-70 grade) Tonne
M-075 Bitumen (80-100 grade ) Tonne
Part I - Materials not covered under WR Work items basic data – Common SoR 2019-20
M-076 Bitumen (Cutback ) Tonne As per rates fixed by R&B Dept based on refinery rates
M-077 Bitumen (emulsion) Tonne
M-078 Bitumen (modified graded) Tonne
M-079 Brick Each As per Building SSR
M-080 C.I. shoes for the pile Kg 50
M-081 Cement Tonne Rate as per item no.5 of Material rates of WRD.
M-082 Cold twisted bars (HYSD/TMT Bars) Tonne Rate as per item no.62 of Material rates of WRD
M-083 Collar for joints 300 mm dia No’s 133
M-084 Compressible Fibre Board(20mm thick) Sqm 490
M-085 Connectors/ Staples Each 67
M-086 Copper Plate(12m long x 250mmwide) Kg 265
M-087 Corrosion resistant Structural steel Tonne 51645
M-088 Corrugated sheet, 3 mm thick, "Tie" beam section Kg 181
M-089 Credit for excavated rock found suitable for Cum 202
M-090 Curing compound Liter 105
M-091 Delineators from ISI certified firm as per the standard drawing given in IRC - 79 Each As per  local competitive quotations
M-092 Earth Cost  or compensation for earth taken from Cum 60
M-093 Elastomeric slab seal expansion joint assembly
manufactured by using chloroprene, elastomer for elastomeric slab unit
Metre As per  local competitive quotations
M-094 Electric Detonators @ 1 detonator for 1/2 gelatin stick 100 no’s Rate as per item No. 21 of WRD
M-095 Epoxy compound with accessories for preparing Kg 290
M-096 Epoxy mortar Kg 95
M-097 Epoxy primer Kg 496
M-098 Epoxy resin-hardener mix for prime coat Kg 512
M-099 Flag of red color cloth 600 x 600 mm Each 25
M-100 Flowering Plants 42
M-101 Galvanized MS flat clamp 172
M-102 Galvanized steel wire crates of mesh size 100 mm x 100 mm woven with 4mm dia. GI wire in rolls
of required size.
159
M-103 Galvanized structural steel plate 200 mm wide, 6 mm 820
M-104 Gelatin 80% 59
M-105 Geo grids As per  local competitive quotations
M-106 (a)Geo membrane 500 micron thick Rate as per item No. 52 of WRD
  (b) Geo membrane 750 micron thick Rate as per item No. 53 of WRD
  (c) Geo membrane 1000 micron thick Rate as per item No. 54 of WRD
M-107 Geo nets As per  local competitive quotations
M-108 (a)Geo textile 160 gsm Rate as per item No. 29 of WRD
  (b) Geo textile 200 gsm Rate as per item No. 30 of WRD
  (c) Geo textile 250 gsm Rate as per item No. 31 of WRD
M-109 Geo textile filter fabric As per  local competitive quotations
M-110 GI bolt 10 mm Dia 19
M-111 Grouting pump with agitator Rate covered in Item No.36 of hire charges of machinery of Water Resources work items
M-112 Grass (Doob) 6
M-113 Grass (Fine) 8
M-114 HDPE pipes 75mm dia Rate as per PH items
M-115 HDPE pipes 90mm dia
M-116 Hedge plants Each Rate as per local competitive quotations
M-117 Helical pipes 600mm diameter Metre
M-118 Hot applied thermoplastic compound Litre
M-119 HTS strand Tonne 36,265
M-120 Joint Sealant Compound Kg 60
M-121 Jute netting, open weave, 2.5 cm square opening for seeding and Mulching Sqm 79
M-122 LDO for steam curing Litre 59
M-123 M.S. Clamps Kg Deleted
M-124 M.S. Clamps Kg Rate as per local competitive quotations
M-125 M.S. shoes @ 35 Kg per pile of 15 m Kg Rate as per local competitive quotations
M-126 Mild Steel bars Tonne 40,470
M-127 Modular strip/box seal expansion joint including anchorage catering to a horizontal movement beyond 70 mm and up to 140mm assembly comprising of edge beams, central beam,2 modules chloroprene seal, anchorage elements, support and control system, all steel sections protected against corrosion and installed by the manufacturer or his authorized Metre Rate as per local competitive quotations
M-128 Modular strip/box seal expansion joint catering to a horizontal movement beyond 140mm and up to 210mm box/box seal joint assembly containing 3 modules/cells and comprising of edge beams, two central beams, chloroprene seal, anchorage elements, support and control system, all steel sections protected against corrosion and installed by the manufacturer or his authorized representative Metre Rate as per local competitive quotations
M-129 Nipples 12mm No’s 18
M-130 Nuts and bolts Kg 89
M-131 Paint Litre 206
M-132 Pavement Marking Paint Litre Rate as per local competitive quotations
M-133 Paving Fabric Sqm
M-134 Perforated geo synthetic pipe 150 mm dia Metre
M-135 Perforated pipe of cement concrete, internal dia 100 mm Metre
M-136 Pesticide Kg Rate as per local competitive quotations
M-137 R.C.C Pipes 200 mm dia, 2.5 m long for drainage Metre Rate as per PH item
M-138 Plastic sheath, 1.25 mm thick for dowel bars Sqm 49
M-139 Plastic tubes 50 cm dia , 1.2 m high No’s Rate as per local competitive quotations
M-140 Polymer braids Metre
M-141 Pre moulded Joint filler, 25 mm thick for expansion joint. Sqm 273
M-142 Pre-coated stone chips of 13.2 mm nominal size Cum Rate as per local competitive quotations
M-143 Preformed continuous chloroprene elastomer or closed cell foam sealing element with high tear strength, vulcanized in a single operation for the full length of a joint to ensure water tightness. Metre Rate as per local competitive quotations
M-144 Pre-moulded asphalt filler board Sqm
M-145 Pre-packed cement based polymer concrete of strength 45 Mpa at 28 days Kg Rate as per local competitive quotations
M-146 Sealant Primer Kg 154
M-147 Quick setting compound Kg 28
M-148 Random Rubble Stone Cum 250
M-149 RCC Pipe NP 4 heavy duty non pressure pipe 1000 mm dia Metre Rate as per PH items
M-150 RCC Pipe NP 4 heavy duty non pressure pipe 1200 mm dia Metre
M-151 RCC Pipe NP 4 heavy duty non pressure pipe 300 mm dia Metre
M-152 Reflectorising glass beads Kg Rate as per local competitive quotations
M-153 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Copper Strips) Metre
M-154 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Galvanized carbon steel strips) Metre
M-155 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Glass reinforced polymer/ fiber reinforced polymer/polymeric strips) Metre
M-156 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Stainless steel strips) Metre Rate as per local competitive quotations
M-157 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Aluminum strips) Metre
M-158 Rivets Each 6
M-159 Sand bags (Cost of sand and Empty cement bag) Per bag Rate as per Item no.2 of miscellaneous items
M-160 Sapling 2 m high 25 mm dia Each Rate as per local competitive quotations
M-161 Scrap tyres of size 900 x 20 No’s 70
M-162 Seeds(Grass) Kg 18
M-163 Cost of Selected earth Cum Rate as per Item No.
M-092
M-164 Separation Membrane of impermeable plastic sheeting 125 micron thick Sqm Rate as per local competitive quotations
M-165 Sheathing duct Metre
M-166 Shrubs Each 15
M-167 Sludge / Farm yard manure @ 0.18 cum per 100 sqm at site of work for turfing Cum Rate as per local competitive quotations
M-168 Sodium vapour lamp Each As per Building SSR
M-169 Square Rubble  Coursed Stone Cum 2,195
M-170 Steel circular hollow pole of standard specification for street lighting to mount light at 5 m height above deck level Each Rate to be obtained from Electricity/Municipal Departments
M-171 Steel circular hollow pole of standard specification for street lighting to mount light at 9 m height above road level Each
M-172 Steel drum 300 mm dia 1.2 m high/empty bitumen drum No’s As per local competitive market rate
M-173 Steel helmet and cushion block on top of pile head during driving. Kg
M-174 Steel pipe 25 mm external dia as per IS:1239 Metre 254
M-175 Steel pipe 50 mm external dia as per IS:1239 Metre 495
M-176 Steel wire rope 20 mm Kg 164
M-177 Steel wire rope 40 mm Kg 187
M-178 Strip seal expansion joint Metre Rate as per local competitive quotations
M-179 Structural Steel(HYSD/TMT bars) Tonne Rate as per item no.62 of Material rates of WRD
M-180 Super plasticizer admixture IS marked as per 9103- 1999 Kg Rate as per item no.70 of Material rates of WRD
M-181 Synthetic Geo grids as per clause 3102.8 and approved design and specifications. Sqm Rate as per local competitive quotations
M-182 Through and bond stone
(a) 20X20x30 to 45 cm long
Each Rate as per item no.75 of Material rates of WRD.
  Through and bond stone
(b) 25X25x45 to 60 cm long
Each Rate as per item no.76 of Material rates of WRD.
  Through and bond stone
(c) 30X30x65 to 75 cm long
Each Rate as per item no.77 of Material rates of WRD.
M-183 Tie rods 20mm diameter No’s 48
M-184 Tiles size 300 x 300 mm and 25 mm thick Each As per Building SSR
M-185 Timber Cum
M-186 Traffic cones with 150 mm reflective sleeve No’s Rate as per local competitive quotations
M-187 Tube anchorage set complete with bearing plate, permanent wedges etc No’s
M-188 Un slaked lime Tonne 2598
M- 189(a) Water charges(Urban) KiloLitre 107
(b) Water charges(Rural) KiloLitre 80
M-190 Water based cement paint Litre As per Building SSR
M-191 Welded steel wire fabric Kg 135
M-192 Wire mesh 50mm x 50mm size of 3mm wire Kg 222
M-193 Wooden ballies 2" Dia for bracing Each As per Building SSR
M-194 Wooden ballies 8" Dia and 9 m long Each
M-195 Wooden packing Cum 1117
M-196 Wooden staff for fastening of flag 25 mm dia, one m
long
Each 70
Item 8.3 Printing new letter and figures of any shade (ii)
English Roman
per cm height per letter 1.6
Item 8.8 Painting Two Coats on New Concrete Surfaces Sqm As per Building SSR
Item 8.9 Painting angle iron post Two Coats Sqm As per Building SSR

 Miscellaneous Items

1 Benching old embankment slopes 0.45 X
0.45 M
RM 4.2
2 Laying Sand Bags in the stipulated places including
cost of empty cement bag, sand, thread, stiching charges and labour charges with 13.615 % overhead
per bag 8.5
3 Rough stone for revetment 225mm thick Cum 145
4 Eradication of Weed growth from Drains,
Canals by
spraying Chemicals
Sqm 2
5 Thinner Ltr 80
6 Gear Oil Ltr 235
7 Cardium compound kg 95

****