SURVEYING & INVESTIGATION



GOVERNMENT OF MAHARASHTRA
COMMON SCHEDULE OF RATES FOR 2017-18
SURVEYING AND INVESTIGATION
 

Sl. No. Item Unit Rate for 2017-18 (Rate in Rs.)
Completed Item Labour
130 Item No.130 :-
Double levelling using Digital state of art Total station to connect Geodetic rignometrical survey, bench mark & establishing permanent bench mark at Dam site at place along the canal alignment, submergence & in command area etc complete (Excluding cost of B.M. structure)
Km. 746.00 435.29
131 Item No.131 :-
Block contour survey of 10 x 10 m grid (Not less than 121 raw data points distributed uniformly over a Hector) for irrigation projects using digital state of art instrument, Including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawing shall be approved by engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper.
     
  (A) Total Station Ha. 581.00 405.42
  (B) DGPS Ha. 219.00 97.21
132 Item No.132 :-
Block contour survey of 15 x 15 m grid (Not less than 64 raw data points distributed uniformly over a Hector) for irrigation projects using digital state of art instrument, Including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawing shall be approved by engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper.
     
  (A) Total Station Ha. 391.00 273.25
  (B) DGPS Ha. 148.00 65.59
133 Item No.133 :-
Block contour survey of 20 x 20 m grid (Not less than 36 raw data points distributed uniformly over a Hector) for irrigation projects using digital state of art instrument, Including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawing shall be approved by engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper.
     
  (A) Total Station Ha. 293.00 204.96
  (B) DGPS Ha. 111.00 49.19
134 Item No.134 :-
Block contour survey of 30 x 30 m grid (Not less than 25 raw data points distributed uniformly over a Hector) for irrigation projects using digital state of art instrument, Including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawing shall be approved by engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper.
     
  (A) Total Station Ha. 201.00 140.65
  (B) DGPS Ha. 76.00 33.75
135 Item No.135 :-
Block contour survey of 60 x 30 m grid (Not less than 15 raw data points distributed uniformly over a Hector) for irrigation projects using digital state of art instrument, Including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawing shall be approved by engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper.
     
  (A) Total Station Ha. 103.00 72.34
  (B) DGPS Ha. 39.00 17.36
136 Item No.136 :-
Block contour survey of 150 x 30 m grid (Not less than 5 raw data points distributed uniformly over a Hector) for irrigation projects using digital state of art instrument, Including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawing shall be approved by engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper.
     
  (A) Total Station Ha. 46.00 32.15
  (B) DGPS Ha. 17.00 7.71
137 Item No.137 :-
Carrying out line survey using digital state of art Total station for fixing FRL/HFL including C/s survey with levels at 20m interval / survey for 'L' section of alternative Dam site and 'L' section of river 1Km U/s 1Km D/s of alternative Dam line etc complete including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawing shall be approved by engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper.
Km. 575.00 401.90
138 Item No.138 :-
Survey for main canal, branches, distributaries on falling contour including investigation of alternative line, taking falling contour fixing canal line, taking 'L' section and cross section on final line and distributaries survey etc complete. (Excluding fixing apex / chainage stones) including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages (Item contd. on next page)
including contour plotting at specified interval & scale. Absolutely linear survey for all types of canals (Length of survey for L-section and cross sections to be measured separately for payment)
Km. 690.00 482.28
139 Item No.139 :-
Preparation of detailed construction plan for pipe distribution network system including necessary command survey, linear survey for pipe laying, chak planning designing of pipe network and preparation of estimates.
Ha.CCA 356.90 281.42
140 Item No.140 :-
Providing permanent bench mark dressed stone of basalt, granite or gneiss of size 30CmX30CmX45Cm at least 15Cm below the ground and embedding it to a depth of 30Cm in grade M-15 in situ concrete of size 90CmX90CmX60Cm deep over 1M deep foundation concrete of grade M-10 including excavation, concrete, providing and fixing dressed stone and backfilling the pit up to ground level with sand etc complete.
No. 4166.00 357.82
141 Item No.141 :-
Fixing precast RCC alignment blocks (Pillar) on alternative dam site finally approved of size 900x175x100 mm at 90 M interval including fixing in 1:3:6 (600 x 450 x 450mm) cement concrete, excavation, backfilling and coloring etc as necessary (0.75 kg steel)
No. 421.30 35.41
  SURVEY ITEMS FOR DEPARTMENTAL EXECUTION
(LABOUR RATES ONLY)
     
142 Item No.142 :-
Supplying labours for Double levelling to connect Geodetic Trignometrical Survey, Bench mark and establishing the permanent Bench mark at Dam site at place along the canal alignment submergence and in command area etc complete.(Excluding cost of P.B.M. structure)
Km. 830.00 830.00
143 Item No.143 :-
Supplying labours for Submergence survey including establishment of temporary bench mark to prepare submergence plan with 1 to 1.5 mt. interval contours etc complete (Grid size 30 x 60 mt.)
Ha. 469.00 469.00
144 Item No.144 :-
Supplying labours for Detailed survey of dam seat and waste weir and borrow area finally approved including mapping to the extent 3 meter above the top of dam level on either flanks and 500 meter up-stream and 500m down-stream, showing all important features, rock outcrops, pools, water courses etc complete. (Grid size 30 x 30M)
Ha. 911.00 911.00
145 Item No.145 :-
Supplying labours for Survey for longitudinal section of Alternative dam alignment and longitudinal section of river 1.00km. up-stream and 1.00 km. down-stream of alternative dam alignment etc complete.
Km. 2655.00 2655.00
146 Item No.146 :-
Supplying labours for Contour survey for command area including preparation of contour map with 1.00m contour interval, including establishing working temporary bench mark in command area etc complete. (Grid size 150 x 30m)
Ha. 204.00 204.00
147 Item No.147 :-
Supplying labours for Survey for main canal, branches, distributaries on falling contour, including investigation of alternative line, taking falling contour, fixing canal line, taking longitudinal-section and cross-section of final line and distributaries survey etc complete.
Km. 3318.00 3318.00
  INVESTIGATION & FOUNDATION EXPLORATION      
148 Item No.148 :-
Taking trial bore for detailed investigation with NX diamond drill double tube in all sorts of soil like soft murum, hard murum and boulders including all materials such as casing pipes, accessories, grease, steel boolsam and other such materials and or as required including conveying such materials and machinery to site of works, preserving the loose samples in glass/plastic jar and core samples serially numbered at site of work and conveying the same to the head quarter of concerned office as directed and submission of detailed bore log sheet complete.(As directed by the Engineer in charge)
     
  (A) Over Burdon Rmt. 1450.00 225.00
  (B) Soft Rock / Weathered Rock Rmt. 2068.00 270.00
  (C) Hard Rock other than quartzite Rmt. 2904.00 270.00
149 Item No.149 :-
Providing tun tappa core boxes of jungle wood of size 1.25mx0.35mx0.15m for preserving core sample with all fixtures and fastening handles including locking arrangement etc. complete. (As per PWD Survey RSR 2017-18 rate is 1980/- I.No. 1.49/page no 7) (cost of material excluding labour component Rs.410/- is Rs1570/-. Excluding tax component of 18% material cost comes out to Rs.1330.51/-. Hence rate equals to 1330.50+410=1740.50)
No. 1740.50 410.00
150 Item No.150 :-
Carrying out water intake test / permeability test at any stage or depth as may be directed by Engineer In charge by filling the bore hole with water or air at specific pressure of specified limit as and where directed etc completed.
Test 519.20 279.10
151 Item No.151 :-
Excavation for taking trial pits on final alignment of dam line and canal at specified interval and in Nalla-bed of size 2.00 x 2.00 x 2.50mtr. in length, breadth and depth respectively or size as may be directed by the Engineer In charge including back filling trial pits etc complete.
Cum. 99.60 7.45

*****