TS-iPASS/G.O.NO:50



GOVERNMENT OF TELANGANA

ABSTRACT

TS-iPASS - Rules - Telangana State Industrial Project Approval and Self Certification System (TS¬iPASS) Rules, 2015

— Amendments — Issued

INDUSTRIES & COMMERCE (IP & INF) DEPARMENT

G.O.Ms.No. 50         Dated: 28-07-2017

Read the following:

1.  Telangana State Industrial Project Approval and Self Certification System (TS-iPASS) Act, 2014 (Act No. 3 of 2014).

2.  G.O. Ms No.35, Industries and Commerce (IP&INF) Dept., Dated:17-06-2015.

3.  G.O. Ms No.36. Industries and Commerce (IP&INF) Dept., Dated:17-06-2015.

4.  G.O.MS.No. 92 Industries and Commerce (IP&INF) Dept., Dated: 23-12-2015.

ORDER:

In exercise of powers conferred under sub-section (1) of Section 26 of the Telangana State Industrial Project Approval and Self Certification System (TS-iPASS) Act, 2014 (Act No.3 of 2014), Government has issued Telangana State Industrial Project Approval and Self Certification System (TS¬iPASS) Rules , 2015 vide reference 3rd read above for implementation of the provisions of the said Act.

2. In order to facilitate the investors by providing investor friendly environment, Government further issued certain amendments vide reference 4th read above to Telangana State Industrial Project Approval and Self Certification System (TS-iPASS) Rules, 2015 issued in G.O. 3rd read above, suitably to strengthen the powers of Telangana State Industrial Project Approval and Self Certification System (TS-iPASS) Committees at State Level and District Level as specified in the said rules.

3. To further facilitate the investors in establishment and operation of their unit and to mandate time-bound delivery of all services provided by the Government to Industries /Business with the objective of improving the Ease of Doing Business in the state, Government after careful examination decided to include 34 services under the purview of TS-iPASS.

4. Accordingly, the following amendments are issued to the TS-iPASS Rules(amended from time to time) to authorise the Government for making any changes in the Common Application Form(CAF), for mandating ONLINE application, for modification of the penalty amount and for including additional services in the Annexure VI of the rules:

AMENDMENTS

1) In Rule 5, clause (c) shall be substituted with “The Combined Application Form duly filled in shall be submitted by attaching the relevant enclosures, certificates, attachments, fees, etc., through ONLINE”

2)  The following shall be included as Rule 5(g) after 5(f) in Rule 5:

“(g). The Combined Application Form may be revised by the Government as and when required”.

3) In rule 6, the expression “(online or otherwise)” shall be deleted

4) The existing rule 10 shall be substituted by the following, namely:-“10. Time limits for issuing clearances:

The time limits for various clearances shall be as prescribed in Annexure VI, provided these applications were complete in all respects at the time of their submission and there are no further information/query pending and where the granting of approval is not held up for want of clearances from agencies/ departments/ institutions other than those of the state government. The government may notify the clearances in respect of which the failure of the competent authority to pass final orders on the application within the stipulated time shall result in deemed approval. Certificate so issued to the units shall be binding on all concerned departments.

5) In annexure –IV “Processing Fee to be paid in the form of DD favouring "Commissioner of Industries, Hyderabad" or to be paid online (see directions) Head of A/c for Challan : 0851-Village and Small Industries, MH-102 Small Scale Industries, SH (81)-Other Receipts, 800-User Charges DDO Code 25001305001 ” - shall be deleted

6) In the Annexure VI, under TIME LIMITS – ESTABLISHMENT the entry at S No. 2 (a) i.e. “NOC from Polluting Angle for Green Category Units” issued by District Industries Centre” - shall be deleted.

7) In the Annexure VI, under TIME LIMITS – ESTABLISHMENT the entry at S No. 2 (b), (c) and (d) i.e., “CFE” shall be replaced by “CFE (under Water Act 1974 and Air Act 1981)”

8) In the Annexure VI, the entry at S.No. 8 i.e., “HMDA and KUDA” shall be replaced by “HMDA, KUDA and DTCP”

9) In the Annexure VI, the entry at S.No. 12 i.e., “HMWS&SB” shall be replaced by “HMWS&SB, Irrigation & CAD Department, CDMA, PR&RD, I&C, RWS, GHMC”

10) In the Annexure VI, under TIME LIMITS FOR OPERATION the entry at S No. 1 (a), (b) and (c) i.e., “CFO” shall be replaced by “CFO (under Water Act 1974 and Air Act 1981)”

11) In the Annexure VI, under TIME LIMITS – OPERATION the entry at S No. 6 i.e., “Drug License” shall be replaced by “Drug Manufacturing License”

12) The following rule shall be added after rule 18,19: Inspection Guidelines

a) Municipal Administration & Urban Development, Industries & Commerce, Panchayt Raj & Rural Development and Consumer Affairs, Food and Civil Supplied dept. to ensure following, for services mentioned at Sl. No. 24, 25 and 26 under other services:

i. Allocation of inspectors shall be through a computerized system and inspection report should also be made available on TSiPASS website with provision to view / download from TSiPASS website.

ii. Computerized inspector allocation shall be designed in such a way that same inspector will not inspect the same establishment twice consecutively.

13)  In the Annexure VI

(i) Under “TIME LIMITS –ESTBALISHMENT” after the entry at Sl.no.21, the following entries shall be added:

TIME LIMITS-ESTABLISHMENT  

Sl.No

Service

Department

Time Limits

22.

Registration of  principal employer's establishment under provision of The Contracts Labour (Regulation and Abolition) Act, 1970                   

LET &F

30 Days

23.

License for contractors under provision of The Contracts Labour (Regulation and Abolition) Act, 1970             

LET &F

30 Days

24.

Registration under The Building and Other Construction Workers (Regulation of Employment and Conditions of       Service) Act, 1996                               

LET &F

15 Days

25.

Registration   of  Establishment under  Inter    State    Migrants Workmen (RE&CS) Act,1979

LET &F

30 Days

(ii)  Under “TIME LIMITS FOR OPERATION”, after the entry at sl.no.6, the following entries shall be added:

TIME LIMITS FOR OPERATION

Sl.No

Service

Department

Time Limits

7.

Registration under  the Legal Metrology Act, 2009       

Consumer Affairs, Food & Civil Supplies           

15 Days

8.

Registration   under Shops and Establishments Act

LET &F

30 Days

10.

Registration of Establishment  under the Inter State Migrants Workmen (RE&CS) Act, 1979

LET &F

30 Days

11.

Renewal of Registration under Shops and Establishments Act

LET &F

30 Days

12.

Renewal of Consent for Operation (under Water Act 1974 and Air Act 1981) by TSPCB

EFS&T

Green - 7 Days Orange–21 Days Red – 30 Days

13.

Renewal of factory License

LET &F

3 Days

14.

Renewal of Boilers License

LET &F

7 Days

(iii)  After the table for “TIME LIMITS FOR OPERATION”, the following Table for “Other Services” shall be added:

Other Services

Sl.No

Service

Department

Time Limits

1.

Approval for boiler manufacturer and renewal thereof under Indian Boiler Act 1923 – Central Act   

 LET &F Department           

21 Days

2.

Approval for boiler erector and renewal thereof under. Indian  Boiler  Act  1923 – Central Act

LET &F Department

21 Days

3.

Tree transit permission under Telangana Forest Produce Act                          

EFS&T Department

30 Days

4.

Obtaining ‘Right of Way (including Road Cutting)’  permission for electricity connection                             

TR&B/ PR&RD/ MA&UD (ULBs / UDAs) / I&C Forest /Tribal welfare/Revenue  (LA) Depts  

7 Days

5.

Registration for Professional Tax  

Revenue(CT & Excise) 

Department  

1 Day

9.

Retail  Drug License (Pharmacy) and renewal thereof                                           

Health & Family Welfare Department

14 Days

10.

Wholesale drug license

Health & Family

Welfare Department

14 Days

11.

Renewal of Drug Manufacturing License           

Health & Family

Welfare Department

14 Days

12.

Trade License

MA&UD PR&RD, I&C

15 Days

13.

Renewal of Registration under the Legal Metrology Act, 2009

Consumer Affairs, Food & Civil Supplies

15 Days

14.

Incentives

Industries & Commerce Department

1. Issue of acknowledgement /in tent letter 7 Days                 2. Issue of Sanction Letter 30 Days                           

3.15 days from issuance of Letter of Credit.       

15.

Registration of Societies under Telangana Societies Registration Act.

Revenue (R&S)

3 Days

16.

Document Registration

Revenue (R&S)

1 Day

17.

Mutation of Land or Property

Revenue (LA), MA&UD, I&C PR&RD

15 Days

18.

Inspections during construction stage of Buildings.

MA&UD, I&C

7 Days

19.

Final completion cum occupancy certificate for Buildings.

MA&UD, PR&RD, I&C

8 Days

20.

Renewal of License for contractors under provision of the Contracts Labour (Regulation and Abolition) Act, 1970

LET & F Department

30 Days

21.

Certification of Electrical Installation from Chief Electrical Inspector to  Government                                  

Energy Department

14 Days

22.

Assessment of Property Tax on Lands and Buildings

MA&UD, I&C PR&RD

15 Days

23.

Advertisement License

MA&UD, I&C PR&RD

15 Days

24.

Uploading of inspection reports with  reference to Inspections undertaken for ‘Building Plan Approval’

MA&UD, I&C

48 hours

25.

Uploading of  inspection reports with  reference to Inspections undertaken for ‘Final completion cum occupancy certificate’     

MA&UD, I&C PR&RD

48 hours

26.

Uploading of inspection reports with  reference to Inspections undertaken for ‘Registration  / renewal of manufacturer, dealer, repairer and importer / packer’  

Consumer Affairs, Food and Civil Supplies Dept.,

48 hours

Accordingly, all the concerned departments shall take further necessary action in the matter.

S.P.SINGH

CHIEF SECRETARY TO GOVERNMENT

//FORWARDED::BY::ORDER//

*****