Schedule of Rates for the year 2020-21 with basic rates (excluding GST) (as per A.P.Revised Standard Data) -Part-I(Water Resources Dept. Works), Part-2(Road & Bridge Works) and Part4 (Public Health Works) approved - Printing& Communication of SoRs - Reg.

Ref: 1. G.O.Ms.No.49,I&CAD (PW:Reforms)Dept., dt:2.3.2009

2. ENC (PH) Lr.No. 146/T4/SoR 2020-21 dt: 20.07.2020.

3. CE(R&B),Admn Lr.No.SoR-II/ ENC/ DEC(R)/ EE (TEC)/ DEE6/AEE2 /2020 dt: 17.07.2020.

4. Average rise in the Consumer Price Index for State Industrial Workers for half year ending December,2019 as on 01-04-2020, declared by the Commissioner of Labour, Andhra Pradesh, Vijayawada vide A.P. Gazette no.J / 3432179 /2020 dt.07.05.2020 under Minimum Wages Act, 1948.

5. T.O. Lr. No. ENC/ IW/SE(P&M)/ EE.I/ DEE.3/ AEE(N)/ SoR 2020-21/ Vol.I dt. 25.08.2020 along with the minutes of Annual Schedule of Rates meeting for the year 2020-21 held on 14.08.2020.

6. ENC (PH) Lr.No. 146/T4/SoR 2020-21 dt: 03.09.2020.

7. CE(R&B),Admn Lr.No.SoR-II/ CE(Admn)/ DEC(R)/ EE(TEC)/ DEE 6/AEE2 /2020 dt:04.09.2020

The Government have approved A.P.Revised Standard Data vide ref 1st cited. The Schedule of Rates with basic rates(excluding GST) as per the A.P.Revised Standard Data for the year 2020-21 is approved based on the following:

The ENC(R&B) vide ref. 3rd cited has furnished the draft basic rates exclusive of GST for Roads & Bridge items for the year 2020-21.

The Engineer-in-Chief, Public Health Department has furnished draft basic rates exclusive of GST for Public Health works items and Public Health Materials vide ref 2nd cited.

For Water Resources Department work items, the Regional Superintending Engineers: SE, IC, Dowlaiswaram, SE, IC, Chittoor and SE, IC, Vijayawada have submitted the draft basic rates of materials. The SE, IC, Guntur has furnished draft rates for Mechanical and Workshop items. Accordingly, the draft rates for Water Resources Department are prepared.

The labour wages are finalized based on the rates as recommended by Regional Superintending Engineers duly keeping in view of the minimum wages as declared by the Commissioner, Labour Department vide ref 4th cited and also COVID-19 Pandemic situation.

Due to COVID-19 Pandemic, the market rates of the materials prevalent during the month of June-2020 are considered.

Based on the above proposals, the draft Schedule of Rates for the part I(WR items), Part-II(Roads & Bridge items) & Part-IV(PH items) are prepared for the SoR year 2020-21 and placed before the annual Board of Chief Engineers(BoCEs) meeting for approval. The BoCEs has reviewed and finalized the rates of above three parts during the annual SoR meeting held on 14.08.2020 in the conference hall of Engineer-in-Chief (A.W/I.W), Vijayawada.

The minutes containing the recommendations of the BoCEs, vide reference 5th cited, are forwarded to CE(R&B) and ENC (PH) for updating the draft rates.

Based on the minutes of meeting, the ENC (PH) and CE(R&B), Admn have furnished, vide references 6 th and 7 th cited above, the final copies of PART-II and PART-IV respectively for incorporating into SoR-2020-21.

The procedure for the adoption of Water Resources work items, lead & lift charges (Common to all Departments) is incorporated in the Annexure-A of SoR.

The approved basic rates (excluding GST) are applicable to the data as per A.P.Revised Standard Data approved by the Government vide G.O.1st cited. For Roads & Bridge Works, the rates can be applied for MoRTH data as approved in the G.O. Ms. No. 2, Transport, Roads and Buildings (R-I) Dept., dt: 12.01.2015.

The lead & lift charges are common to all Engineering Departments. The detailed calculations are incorporated in the Lead & lift chapter in the WR Works (Part-I) of A.P.Revised Standard Data.

As per the email request received from APCFSS, a unique CFMS code for each material is introduced in SoR 2020-21 for the sake of user convenience.

No other items other than the items communicated by this Office shall be introduced in the SoR.

The Heads of Department and Officers mentioned below are authorized to print the Schedule of Rates for the year 2020-21.Unauthorized printing & selling of the SoR is strictly prohibited.

Any discrepancies found (or) corrections required in SoR 2020-21 may be brought to the notice of undersigned for issuing corrections.

The revised rates will come into force from 1st June of 2020.

The receipt of the proceedings may be acknowledged in the 1st instance

Encl: SoR 2020-21 containing Part-I (Water Resources Dept. works), Part-II (Roads & Bridge works), Part-III (Buildings) and Part-IV (Public Health Items)

Sd/-K.Jalandhar.dt.16.09.2020

Engineer-in-Chief(A.W./ I.W.)

Chairman, BOCE(SoR)

I) Copy submitted to the Special Chief Secretary to Govt., WR Dept., 4th Block, A.P.Secretariat Buildings, Velagapudi, Amaravathi.

II) Copy communicated to the following Heads of Departments along with enclosures for information.

1. Chief Engineer (Admn.,) Roads & Buildings Department.

2. Engineer-in-Chief, Public Health Department.

3. Engineer-in-Chief, Panchayath Raj Department.

4. Engineer-in-Chief, RWS, Department.

5. Chief Engineer (Buildings & RSW), R&B Department.

III) Copy of Scheduled of Rates 2020-21 with basic rates & Standard data, part-1 (WR Dept. works) communicated to the respective E-mail ids of all the Engineers-in-Chief, Chief Engineers and Regional Superintending Engineers of Irrigation circles of Vijayawada, Guntur, Dowlaiswaram and Chittoor of Water Resources Department for taking necessary action

IV) Copy to DEE (Computers), EnC(AW) for uploading the approved SoR-2020-21 (part-I, Part-II, Part-III & Part-IV) on the Water Resources Department website and to forward this proceedings to all the members of the Board of Chief Engineers through E-mail.

Sd/-K.Jalandhar.dt.16.09.2020

Engineer-in-Chief (A.W/I.W.)

Chairman, BOCE (SoR)

ANNEXURE- A

1) The SPIU(Irrigation), Centre for Good Governance (CGG), Hyderabad has developed software package linking the basic input data of Irrigation with approved data of Water Resources work items.

2) The lead and lift charges are common to all Engineering Departments. The detailed calculations are incorporated in the Lead &Lift charges chapter in the Water Resources Department works (Part-1) of A.P. Revised standard data.

3) The estimate sanctioning authority shall physically verify each and every Water Resources work item data incorporated in the estimate with basic input data before sanction of the estimate. Any lapses or arithmetic errors arising in the sanction of data /estimate due to adoption of the software package lies entirely on the concerned estimate sanctioning authority only.

4) Any discrepancies / corrections required for improper basic input data appearing in the approved data of Water Resources work items in the software package and hard copy of SoR & Standard data (part-1) may be brought to the notice of undersigned for issuing corrections.

Sd/-K.jalandhar,dt.16.09.2020

Engineer-in-Chief (A.W/I.W)

Chairman, BOCE(SoR)

PREAMBLE

1.0 AREA ALLOWANCES:

A) CORPORATIONS & MUNICIPALITIES:

a) (i) 25% extra over the rates on labour component of works is allowed in all Municipal Corporation Limits of Andhra Pradesh except Greater Visakhapatnam and Vijayawada municipal corporations (up to a belt of 12 Kms. from Municipal Corporation limits) and other corporations as notified by the Government from time to time.

(ii) 40% extra over the rates on labour component of works for Greater Visakhapatnam and Vijayawada Municipal Corporation (up to a belt of 12 Kms. from Municipal Corporation limits).

(iii) 40% extra over the rates on labour component of works for Amaravati Capital City area(217 sq.km) as declared by the Govt.vide G.O.Ms.No.141,MA&UD (M2)Dept., dt:09.06.2015(This is introduced as per the Govt instructions issued in Govt.memo.No.668755/Reforms/2017 d:14.07.2017).

b) Allow 20% extra over basic rates on labour component of works in all District Headquarters and the remaining Municipal limits (up to a belt of 12 Kms from Municipal limits).

c) For works at TirumalaHills in Chittoor District, 40% extra overthe basic rates of labour component is allowed.

d) For works at Horsely hills in Chittoor District, 30% extra overthe basic rates of labour component is allowed.

e) For works located inside Tirumala Temple, 20% extra over the basic rate of labour component specified for Tirumala Hills is allowed.

f) For Works located inside T.T.D Temples of Sri Padmavathi Ammavari Temple, Tiruchanoor, Sri Govindaraja Swamy Temple at Tirupathi, Sri Kapleswara Swamy Temple, Kapilatheerthm, Tirupathi and Sri Kalyana Venkateswara Swamy Temple, Srinivasa Mangapuram , 20% extra over the basic rates of labour component for Tirupathi Municipal Corporation is allowed.

B) JAIL COMPOUNDS:

20% extra is allowed over labour rates for the work in the Jail compounds. Only equivalent number of Man Mazdoor shall be provided in the Jail premises and no women Mazdoor are allowed inside.

C) INDUSTRIAL AREA:

a. 20% over basic rates on labour component works allowed for works situated within 10Kms belt of Industrial area of, Ibrahimpatnam, Vuyyuru, Jaggaiahpeta in Krishna District, Macherla, Gurajala, Challapalli in Guntur District Garividi in Vijayanagaram District, Renigunta in Chittoor District and Yerraguntla & Mangampet in Kadapa District, Hindupur, Tadipatri, Anantapur, Guntakal, Rayalcheruvu, Yadiki of Anantapur District and Adoni, Dhone,Cement Nagar, Nandyal, Kurnool, Yemmiganur & Bethamcherla of Kurnool District, Anakapally of Vishakhapatnam District.

D) AGENCY / TRIBAL AREAS:

a) 25% extra is allowed for the works located within the interior Agency / Tribal limits, i.e. for the works located within & upto16 KMs from any all weather route inside Agency / Tribal.

b) 40% extra is allowed for the works located within the interior Agency / Tribal limits, i.e. for the works located beyond 16 KMs from any all weather route inside Agency / Tribal.

NOTE:

1. No extra percentage is permissible in respect of Forest produce such as Bamboo, Rellu grass and for all materials obtained from outside the Agency / Tribal.

2. The extra percentage under Agency / Tribal areas allowance may be allowed on the labour component and on the labour charges in the rates for conveyance of materials.

3. The extra percentage on cost of materials in Agency / Tribal areas can be allowed on the labour component only, if they are manufactured in the Agency / Tribal areas itself except Forest produce.

E) GHAT ROADS:

For Ghat Roads steeper than 1 in 20, the length of the road may be taken as 1.5 times the existing length of the road for the purpose of leads only for conveyance of materials based on the certificate for the Ghat Road given by the Superintending Engineer concerned.

Foot Note:

Under compelling circumstances, the concerned Chief Engineer can adopt the equivalent length of road as 2 ½ times of actual length.

Note below area allowances:

If more than one area allowance ( suchas those)for(1) Municipalities (2) Agency/Tribalareas(3)Industrialareas are applicable for a particular situation,only the maximum out of the allowable percentages is to be allowed.

EXCAVATION OF TRIAL TRENCHES, TRIAL PITS AND EXCAVATION IN RESTRICTED PLACES: -

I) EXCAVATION OF TRIAL TRENCHES, TRIAL PITS AND EXCAVATION IN RESTRICTEDPLACES: -

A. TRIAL TRENCHES:

1) Trial trenches of not more than 2 metres in width…25% extra

B. TRIAL PITS:

1 Up to 2 Metres depth 25% extra
2 2 Metres to 4Metres depth 50% extra
3 4 Metres to 6 Metres depth 75% extra
4 6 Metres to 8Metres depth 100% extra
5 8 Metres to 9Metres depth 150% extra
6 More than 9 Metres depth 200% extra

II) EXCAVATION IN RESTRICTED PLACES:-

1 Foundation of Buildings 75% extra
2 For pipe lines where the depth is less than 1.5 times thewidth 75% extra
3 For pipe lines where the depth is 1.5 times or more thanthe width 120% extra
4 Siltremoval inrestrictedareas suchU. T’s.,Culverts andSyphons 120% extra
5 Excavation offield channels 75% extra
6 For narrow trenches not more than 2 meters in width and depth not less than twice the width andfor excavation of road boundary drains, model sections of canals 75% extra
7 High berm cutting of not morethan 150 mm average thickness and sectioning for roads 50% extra

Note: 1) The extra percentage is allowed over Common item for all earth works (COMMWRK- Manual Works) for corresponding soil and Standard data items. It includes the charges for all lifts and initial lead but does not include dewatering charges if any in respect of all the items under (A) and (B) above.

2) The above extra percentages in respect of excavation in hard rock for restricted places are to be allowed for (2/3)rd of the cost and shall not to be allowed in respect of items involving blasting component which may be taken as 1/3 of the cost. 3.0

SEIGNIORAGE CHARGES:

The rates of the materials indicated in the SOR are exclusive of Seigniorage Charges. Appropriate Seigniorage Charges for relevant materials are to be added to the Unit rate of work item in the estimates as fixed by the Government in G.O.Ms.No.11 (Industries and Commerce Dept.) dt: 11.02.2020. In case of revision, the revised rates as fixed by Mines and Geology Department have to be adopted.

LABOUR RATES

Sl No. CFMS CODE CATEGORY OF WORKER S. Rate
for
2020-21
1 2 3 4
I.   SKILLED CATEGORY:  
1 LAB-00001 Bar bender 665
2 LAB-00002 Black smith / Tin smith / Rivetor 525
3 LAB-00003 Blaster 605
4 LAB-00004 Carpenter Cl- I 615
5 LAB-00005 Electrician ( Licensed ) 610
6 LAB-00006 Fitter Cl- I 585
7 LAB-00007 Floor Polisher / Tile Layer 525
8 LAB-00008 Foreman 605
9 LAB-00009 Gauge reader 510
10 LAB-00010 Maistry / Work Inspector with Non-technical Qualification SSLC/SSC/HSC 600
11 LAB-00011 Mason Cl- I / Brick layer Cl- I 550
12 LAB-00012 Mechanic Cl- I 560
13 LAB-00013 Operator Air compressor / DG set 540
14 LAB-00014 Operator Batching plant 610
15 LAB-00015 Operator Bus/Ambulance/ Lorry/ Tanker 605
16 LAB-00016 Operator Concrete / Asphalt mixer 540
17 LAB-00017 Operator Concrete / Asphalt paver 540
18 LAB-00018 Operator Concrete pump / Placer/ ice plant 540
19 LAB-00019 Operator Core drilling machine 605
20 LAB-00020 Operator Crane/ Tower crane/ Cable way 605
21 LAB-00021 Operator Drilling jumbo / Loco / Winch 540
22 LAB-00022 Operator Grouting/ Guniting/ Shotcreting 540
23 LAB-00023 Operator Jackhammer/Pneumatic tamper 540
24 LAB-00024 Operator Pump / Ventilation fan 540
25 LAB-00025 Operator Lathe/Drilling/Shearing machine 605
26 LAB-00026 Operator Bending / Planing machine 540
27 LAB-00027 Operator Road roller 560
28 LAB-00028 Operator Shovel / Scraper / Dozer 605
29 LAB-00029 Operator Spillway / Sluice gate 540
30 LAB-00030 Operator Crusher / Conveyor / Mucker 540
31 LAB-00031 Operator Tipper / Dumper / Transit mixer 605
32 LAB-00032 Operator Concrete vibrator 540
33 LAB-00033 Operator Vibratory plain / pad foot roller 540
34 LAB-00034 Operator Wagon drill / Drifter 605
35 LAB-00035 Painter Cl- I 615
36 LAB-00036 Plumber / Pipe fitter 615
37 LAB-00037 Sarang / Khalasi 540
38 LAB-00038 Spun pipe moulder 540
39 LAB-00039 Stone chiseller CI- I / Stone cutter Cl- l 545
40 LAB-00040 Struct. steel Fabricator / Marker / Erector 655
41 LAB-00041 Welder / Gas Cutter 540
42 LAB-00042 Welder (X-ray quality) 605
II.   SEMI SKILLED CATEGORY:  
1 LAB-00057 Asphalt Sprayer / Boiler attendant 500
2 LAB-00058 Bhisti 500
3 LAB-00059 Boatman with boat 500
4 LAB-00060 Carpenter Cl- II / Erector shuttering 500
5 LAB-00061 Cartman with double bullock cart 550
6 LAB-00062 Cartman with single bullock cart 515
7 LAB-00063 Chavali / Navagani 500
8 LAB-00064 Crowbarman / Jumper man 500
9 LAB-00065 Fitter Cl- II 500
10 LAB-00066 Gang man / Head / Survey mazdoor 500
11 LAB-00067 Gardener / Trained mali 500
12 LAB-00068 Air compressor / DG set 500
13 LAB-00069 Helper Batching plant 500
14 LAB-00070 Helper Blasting 500
15 LAB-00071 Helper Bus/ Ambulance/ Lorry/ Tanker 500
16 LAB-00072 Helper Bending/Shearing/Planing machine 500
17 LAB-00073 Helper Carpenter 500
18 LAB-00074 Helper Concrete / Asphalt mixer 500
19 LAB-00075 Helper Concrete / Asphalt paver 500
20 LAB-00076 Helper Core drilling machine 500
21 LAB-00077 Helper Crane/ Tower crane/ Cable way 500
22 LAB-00078 Helper Drilling jumbo / Loco / Winch 500
23 LAB-00079 Helper Fitter / Fabrication/Electrician 500
24 LAB-00080 Helper Grouting/ Guniting/ Shotcreting 500
25 LAB-00081 Helper Jack hammer / Pneumatic tamper 500
26 LAB-00082 Helper Laboratory / Instrumentation 500
27 LAB-00083 Helper Road roller 500
28 LAB-00084 Helper Shovel / Scraper / Dozer 500
29 LAB-00085 Helper Crusher / Conveyor / Mucker 500
30 LAB-00086 Helper Tipper / Dumper/ Transit mixer 500
31 LAB-00087 Helper Vibrator 500
32 LAB-00088 Helper Vibratory plain/ pad foot roller 500
33 LAB-00089 Helper Wagon drill/ Drifter 500
34 LAB-00090 Lineman Electric / Telephone 500
35 LAB-00091 Mason Cl- ll / Brick layer Cl-II 500
36 LAB-00092 Mechanic Cl- II 500
37 LAB-00093 Painter Cl- II 500
38 LAB-00094 Patkari / Neeraganti / Sowdy 500
39 LAB-00095 Stone Chiseller Cl- II 500
40 LAB-00096 Stone breaker / Hammer man 500
41 LAB-00097 Valve man / Canal sluice operator 500
III.   UN-SKILLED CATEGORY:  
1 LAB-00118 Cement / Asphalt handling mazdoor 460
2 LAB-00119 Civic worker 460
3 LAB-00120 Man mazdoor 460
4 LAB-00121 Woman  mazdoor 460
5 LAB-00122 Watchman 460
IV.   OTHER CATEGORY:  
1 LAB-00124 Care-taker / conductor / Lift Attender 500
2 LAB-00125 Cook / Mess man 500
3 LAB-00126 Dhobi 500
4 LAB-00127 Diploma Engineer / Surveyor 850
5 LAB-00128 Diver with headgear 625
6 LAB-00129 Graduate / Laboratory Assistant 625
7 LAB-00130 Graduate Engineer/ Geologist 1100
8 LAB-00131 Horticulture Assistant / Photographer 505
9 LAB-00132 ITI certificate holder / Tracer / Printer 615
10 LAB-00133 Literate mazdoor 475
11 LAB-00134 Stenographer / Computer Operator 670
12 LAB-00135 Telephone / Wireless Operator 605
13 LAB-00136 Typist / Job Typist 605
14 LAB-00137 CAD operator with Diploma in Engineering/General degree with CAD certificate 850
15 LAB-00138 Jeep Driver 600
16 LAB-00139 Data Processing Operator 820

Note: -

1)The wage should not be less than the minimum wages of schedule of employment, subject to out turn. 2) 25% extra over the corresponding labour rates in respect of the work to be done during night time subject to issue of certificate accordingly by the concerned estimate sanctioning authority for providing in the data and by concerned Executive Engineer in charge of the work for payment. The night time allowance is applicable only to the works done under Greater Visakhapatnam Municipal Corporation and Vijayawada Municipal Corporation limits only.

STATEMENT OF RATES FOR MATERIALS

FOR THE YEAR :2020-21

GENERAL GUIDE LINES FOR REVISING RATES OF MATERIALS:

1 . Averageoftheprevailingmarketrates,ignoringfreak rates, is thecriteria for Fixing market rates formaterials.

2 .The rates for materials are exclusive of GST, duties and other local levies.

3 The rates for materials are exclusive of Seigniorage charges wherever applicable.

4 The rates for materials, exceptthose for which lead charges are admissible as perthe Statement of lead charges is for all leads.

5. The rates provided for useful rubble / stone chips from excavation shall be at dump yard.

6. Unless otherwise specified the rate of materials are inclusive of loading charges.

Sl No. CFMS CODE DESCRIPTION OF MATERIAL UNIT S. Rate
for
2020-21
1 2 3 4 5
1 MAT-00001 Acetylene gas cum 336
2 MAT-00002 Asphalt 80/100 Grade Kg 42
3 MAT-00003 Binding wire Kg 56
4 MAT-00004 Burnt stone slab 10 cm thick sqm 297
5 MAT-00005 Cement 43 Gr/53 Gr
Note: Rate as fixed by the Government
tonne 3,672
6 MAT-00006 Chequered plate Kg 59
7 MAT-00007 Coarse aggregate 10-4.75 mm cum 903
8 MAT-00008 Coarse aggregate 20-10 mm cum 1,220
9 MAT-00009 Coarse aggregate 40-20 mm cum 1,180
10 MAT-00010 Coarse aggregate 80-40 mm cum 650
    The aggregate rates mentioned above (from Sl.No.7 to Sl.No.10) are exclusive of Seigniorage charges but including blasting charges of Rs.70/cum and 25% machine crushing charges. However, if the metal is obtained from hand broken, the blasting and crushing charges shall be deducted. The aggregate shall be HB Stone of Granite, Dolamite, Dolerite and Trap. (Quartzite and
Basalt with aggregate impact of less than 20)
   
11 MAT-00011 Coir brush Each 42
12 MAT-00012 Copper sheet 16 SWG Kg 635
13 MAT-00013 Coursed rubble stone 30 x 30 x 45 cm Each 25
14 MAT-00014 Coursed rubble stone 30 x 30 x 60 cm Each 28
15 MAT-00015 Curing Compound Ltr 114
16 MAT-00016 D – cord Rm 6
17 MAT-00017 Delay - noiseless trunk Each 18
18 MAT-00018 Detonating fuse coil Rm 7
19 MAT-00019 Detonating shock tube / Cord relays Rm 35
20 MAT-00020 Detonator delay type Each 19
21 MAT-00021 Detonator electric Each 9
22 MAT-00022 Detonator ordinary Each 6
23 MAT-00023 Empty cement bag Each 5
24 MAT-00024 Explosive ANFO Kg 42
25 MAT-00025 Explosive ANFO high strength booster Kg 65
26 MAT-00026 Explosive small dia ( Kelvex-220 or equivalent) Kg 65
27 MAT-00027 (a)Fine aggregate/ sand(un- screened) for Concrete & Filtering items) Cum 510
MAT-00028 (b)Fineaggregate/Sand(un screened)for filling Cum 375
28 MAT-00029 Fine aggregate /Sand (Screened) for Mortar ,Plastering items and Sand blasting items (Rs.95 is added towards screening Charges) Cum 605
29 MAT-00030 Geo-textile ( filter fabric ) 160 gsm Sqm 91
30 MAT-00031 Geo-textile ( filter fabric ) 200 gsm Sqm 108
31 MAT-00032 Geo-textile ( filter fabric ) 250 gsm Sqm 122
32 MAT-00033 G I Pipe 100 mm dia B Class Rm 710
33 MAT-00034 G I Pipe 15 mm dia A class Rm 85
34 MAT-00035 G I pipe 25 mm dia A class Rm 145
35 MAT-00036 G I pipe 40 mm dia B class Rm 222
36 MAT-00037 G I pipe 50 mm dia A class Rm 255
37 MAT-00038 G I Pipe 80 mm dia B Class Rm 466
38 MAT-00039 G.I Bolts / Nuts and Washers Kg 98
39 MAT-00040 G.I sheet ( plain ) tonne 58,000
40 MAT-00041 Hariyala turfing sods Sqm 26
41 MAT-00042 Hectometer stone one line dressed Each 280
42 MAT-00043 Hemp yarn Kg 69
43 MAT-00044 Honne wood planks Cum 43,500
44 MAT-00045 Hume pipe with collar 150 mm dia Rm 262
45 MAT-00046 Hume pipe with collar 300 mm dia Rm 540
46 MAT-00047 J- Bolts 30 cm long Each 36
47 MAT-00048 Jungle wood planks Cum 18,570
48 MAT-00049 Khandki stone 15 to 20 cm height Each 12
49 MAT-00050 Khandki stone 20 to 25 cm height Each 16
50 MAT-00051 Khandki stone 25 to 30 cm height Each 18
51 MAT-00052 Kilometer stone one line dressed Each 485
52 MAT-00053 LDPE sheet ( Geo membrane ) 500 micron thick Sqm 82
53 MAT-00054 LDPE sheet ( Geo membrane ) 750 micron thick Sqm 121
54 MAT-00055 LDPE sheet ( Geo membrane ) 1000 micron thick Sqm 166
55 MAT-00056 M S Bolts / Nuts / Washers Kg 77
56 MAT-00057 Murrum Cum 205
57 MAT-00058 Oxalic acid Ltr 72
58 MAT-00059 Oxygen gas Cum 41
59 MAT-00060 PVC sealing strip Rm 41
60 MAT-00061 PVC water stopper 310 mm wide Rm 420
61 MAT-00062 PVC pipe of 100 mm dia Rm 155
62 MAT-00063 Reinforcement steel (HYSD/TMT )
Note: As per Monthly rate fixed by Sub- Committee
tonne 40,500
63 MAT-00064 Resin bond Cement capsule Each 45
64 MAT-00065 Rough stone 20 x 20 x 75 cm Each 24
65 MAT-00066 Shahabad stone slab Sqm 240
66 MAT-00067 Stone chips (at dump yard/Spoil) Cum 188
67 MAT-00068 Stone chips ( at quarry ) Cum 357
68 MAT-00069 Structural steel angle / channel / beam / bars
Note: As per Monthly rate fixed by Sub- Committee
Tonne 41,500
69 MAT-00070 Structural steel plate / flats
Note: As per Monthly rate fixed by Sub- Committee
Tonne 43,000
70 MAT-00071 Super Plasticizer (Conplast RP-264 or equivalent
)
Kg 49
71 MAT-00072 Synthetic Enamel paint 1st quality Ltr 228
72 MAT-00073 Synthetic adhesive ( Resin + Hardener ) Kg 298
73 MAT-00074 Tar felt joint filler board 12 mm thick Sqm 343
74 MAT-00075 Tar felt joint filler board 20 mm thick Sqm 520
75 MAT-00076 Through stones 20 x 20 x 30 to 45 cm Each 23
76 MAT-00077 Through stones 25 x 25 x 45 to 60 cm long Each 40
77 MAT-00078 Through stones 30 x 30 x 65 to 75 cm long Each 60
78 MAT-00079 Un-coursed rubble stones ( at dump yard
/Spoil)
Cum 166
79 MAT-00080 Un-coursed rubble stones ( at quarry) Cum 325
80 MAT-00081 Water proofing compound Kg 72
81 MAT-00082 Welding electrodes 4 mm dia Each 13
82 MAT-00083 Wire brush Each 39
83 MAT-00084 Wire mesh 20 gauge sqm 220
84 MAT-00085 Zinc chromate red oxide primer paint Ltr 162
85 MAT-00086 inorganic zinc silicate Ltr 540
86 MAT-00087 solvent less coal tar epoxy paint Ltr 261
87 MAT-00088 Zinc phosphate primer Ltr 198
88 MAT-00089 Allkyd based iron oxide paint Ltr 153
89 MAT-00090 a) Cost of hdpe (90mm dia) Rm 205
MAT-00091 b) light black MS casing pipe 100 mm dia (4mm thick) Rm 450
90 MAT-00092 welded steel wire fabric 100X100X5 mm size Kg 175
91 MAT-00093 Protective Mastic Ltr 424
92 MAT-00094 Solventless coal tar epoxy (brown) Ltr 260

ADDITIONAL MATERIALS FOR GATES & HOISTS

FOR THE YEAR: 2020-21 GUIDE LINES:

a) For cast steel / Alloy steel / Forged steel / Bronze, aluminum alloy components the rates shall be inclusive of cost of basic metal for these components, casting / forging charges, machining charges and applicable excise duty on finished alloy component.

b) For other materials the rates shall be of prevailing market rates.

Sl No. CFMS CODE DESCRIPTION OF MATERIAL UNIT S. Rate for
2020-21
1 2 3 4 5
1 MAT-00108 Alloy steel ( IS : 1570-carbon steel ) shafts Kg 225
2 MAT-00109 Alloy steel ( IS : 1570-stainless steel ) pins Kg 415
3 MAT-00110 Bolt / Nut / Washer ( hot dipped galvanized ) Kg 135
4 MAT-00111 Bolt / Nut / Washer ( stainless steel ) Kg 350
5 MAT-00112 Bronze/Aluminum alloy(IS:305)bearings/bushes Kg 905
6 MAT-00113 Cast iron blocks Kg 81
7 MAT-00114 Cast steel drums / gears Kg 219
8 MAT-00115 Cast steel pinions Kg 214
9 MAT-00116 Cast steel wheels / pulleys / hubs / rollers / Retainers Kg 182
10 MAT-00117 Chemical for de-greasing/ de- rusting/phosphate Coating Ltr 124
11 MAT-00118 Coal tar epoxy paint Ltr 185
12 MAT-00119 Forged steel hooks / shackles Kg 259
13 MAT-00120 MS pipe 200 / 300 mm dia Kg 166
14 MAT-00121 MS pipe 32 mm dia Rm 177
15 MAT-00122 MS pipe 25 mm dia Rm 144
16 MAT-00123 Rubber bottom seal ( IS : 11855 ) (100mmX14 mm) Rm 644
17 MAT-00124 Rubber side seal ( music note type Teflon claded ) ( IS : 11855 ) (36ØX113mmX14mm) Rm 1,375
18 MAT-00125 Rubber side seal ( music note type uncladed ) ( IS : 11855 )
(36ØX113mmX14mm)
Rm 995
19 MAT-00126 Rubber side seal Z-type ( IS : 11855 ) (36ØX120mmX19mm) Rm 1,300
20 MAT-00127 Rubber corner seal ( Teflon claded ) ( IS : 11855 ) (36Ø) Each 1,365
21 MAT-00128 Rubber corner seal ( un claded ) ( IS : 11855 ) (36Ø) Each 965
22 MAT-00129 Stainless steel plates / flats Kg 275
23 MAT-00130 Welding electrode 4 mm dia x 450 mm ( radiographic low hydrogen ) Each 16
24 MAT-00131 Welding electrode 4 mm dia x 450 mm ( stainless steel ) Each 22
25 MAT-00132 Wire rope 6x37 constn ( IS : 2266 ) Kg 187
26 MAT-00133 Zinc Kg 181
27 MAT-00134 Zinc rich ( zinc content : 90 % ) epoxy primer Ltr 588

MATERIALS FOR POWER SUPPLY WORKS FOR THE YEAR : 2020-21

Sl No. Description of Material Unit S. Rate for 2020-21
1 Electric pole with fixtures Each For establishing Electrical Sub- Stations at the Project Sites wherever necessary, the rates approved by APTRANSCO may
be followed.
2 Flood light 500 W Each
3 Flood light set Each
4 Flouscent tube light 40 W Each
5 Flouscent tube light set Each
6 HT / LT Circuit breaker with accessories Set
7 HT / LT Line conductor 1000 m
8 PVC Armoured cable 10 sqmm and below Rm
9 PVC Armoured cable 16 sqmm Rm
10 PVC Armoured cable 25 sqmm Rm
11 PVC Armoured cable 70 sqmm Rm

DETAILS OF CAPITAL COST OF MACHINERY / EQUIPMENT

FOR THE YEAR: 2020-21

GUIDE LINES FOR FIXING CAPITAL COST OF MACHINERY / EQUIPMENT:

1. The Capital cost of machinery / equipment shall be for new machinery / equipment and shall be exclusive of GST, duties and other levies.

2. The cost oftransport vehicles / equipment shall be exclusive of cost oftyres and tubes.

3. The cost of drill rods / drill bits / air hose / water hose / road tax / insurance charges and Other consumable accessories shall not be included in the capital cost.

4. In cases, where the current capital cost of machinery / equipment could not be collected through enquiries, the capital cost considered for previous year may be updated on the basis of average percentage increase / decrease in the index for machinery published in the R.B.I Bulletin.

Sl No: CFMS CODE DESCRIPTION OF MACHINERY / EQUIPMENT UNIT S. Rate for
2020-21
1 2 3 4 5
1 MAT-00600 Agitator car / Transit mixer 2 cum
( excluding tyres )
Each 18,76,500
  MAT-00601 tyres and tubes 6 sets   72,300
2 MAT-00602 Air compressor 5 cmm electric Each 5,96,000
3 MAT-00603 Air compressor 7 cmm diesel Each 7,96,800
4 MAT-00604 Air compressor 7 cmm electric Each 7,52,500
5 MAT-00605 Air compressor 8.5 cmm diesel Each 9,10,800
6 MAT-00606 Air compressor 8.5 cmm electric Each 9,40,300
7 MAT-00607 Air compressor 15 cmm electric Each 11,50,200
8 MAT-00608 Angle Dozer 90 hp Each 47,78,590
9 MAT-00609 Batching plant 0.5 cum with accessories
(6 Cum/hr)
Each 10,47,360
10 MAT-
00610
Batching plant 2 x 1.00 cum with accessories ( 15
Cum/hr)
Each 37,05,046
11 MAT-00611 Batching plant 2 x 1.50 cum with accessories ( 50
Cum/hr)
Each 56,73,219
12 MAT-00612 Bending machine Each 4,82,000
13 MAT-00613 Clam shell and hoisting ropes Each 27,750
14 MAT-00614 Concrete bucket 1.5 cum Each 48,500
15 MAT-00615 Concrete hand mixer 45/30 ltr Each 13,785
16 MAT-00616 Concrete mixer 300/200 ltr(diesel) Each 1,29,500
17 MAT-00617 Concrete mixer 300/200 ltr ( electric ) Each 1,26,555
18 MAT-00618 Concrete mixer 600/400 ltr(diesel) Each 2,20,500
19 MAT-00619 Concrete mixer 600/400 ltr ( electric ) Each 2,16,000
20 MAT-00620 Concrete paver 100 Sqm / hr Each 20,58,050
21 MAT-00621 Convey mucker ( excluding tyres ) Each 33,59,330
  MAT-00601 tyres and tubes 6 sets   72,300
22 MAT-00622 Core drilling machine Each 9,60,078
23 MAT-00623 Diesel generating set 30 KVA Each 4,32,032
24 MAT-00624 Diesel generating set 50 KVA Each 5,39,800
25 MAT-00625 Diesel Loco 45 hp Each 18,50,339
26 MAT-00626 Dewatering pump 5 hp diesel Each 34,800
27 MAT-00627 Dewatering pump 5 hp electric Each 21,558
28 MAT-00628 Dewatering pump 10 hp diesel Each 52,550
29 MAT-00629 Dewatering pump 10 hp electric Each 48,100
30 MAT-00630 Dewatering pump 20 hp diesel Each 1,65,988
31 MAT-00631 Dewatering pump 20 hp electric Each 88,990
32 MAT-00632 Drifter Each 9,25,450
33 MAT-00633 Drilling jumbo ( excluding tyres ) Each 11,68,859
  MAT-08524 tyres and tubes 6 sets   75,000
34 MAT-00634 Dumper 4.5 cum ( excluding tyres ) Each 12,90,200
  MAT-00601 tyres and tubes 6 sets   72,300
35 MAT-00635 Geophysical Ele.resistivity meter Each 4,48,600
36 MAT-00636 Grouting pump Each 85,890
37 MAT-00637 Guniting / sand blasting equipment Each 2,67,500
38 MAT-00638 Ice plant with accessories 30 t / day Each 22,38,742
39 MAT-00639 Jack hammer Each 56,500
40 MAT-00640 Needle vibrator 40 mm petrol Each 17,500
41 MAT-00641 Needle vibrator 40 mm electric Each 18,350
42 MAT-00642 Needle vibrator 60 mm petrol Each 18,200
43 MAT-00643 Needle vibrator 60 mm electric Each 22,450
44 MAT-00644 Planing machine 4 m stroke Each 7,42,378
45 MAT-00645 Plate shearing machine up to 12 mm Each 4,04,504
46 MAT-00646 Pneumatic placer 0.5 cum Each 5,06,230
47 MAT-00647 Pneumatic tamper Each 74,500
48 MAT-00648 Pug cutting machine Each 15,669
49 MAT-00649 Pusher leg Each 48,300
50 MAT-00650 Road roller diesel 10 t Each 7,63,082
51 MAT-00651 Shovel 0.50 cum 75 hp Each 33,65,000
52 MAT-00652 Shovel 0.85 cum 110 hp Each 56,21,517
53 MAT-00653 Stationery derrick crane 5 t Each 5,69,939
54 MAT-00654 Tipper 5 cum ( excluding tyres ) Each 14,58,340
  MAT-00601 tyres and tubes 6 sets   72,300
55 MAT-00655 Tipping tub 1.5 cum Each 2,11,467
56 MAT-00656 Tower crane 5 tonne Each 65,24,196
57 MAT-00657 Transformer 250 KVA Each 4,33,500
58 MAT-00658 Truck 10 t ( excluding tyres ) Each 12,87,385
  MAT-00601 tyres and tubes 6 sets   72,300
59 MAT-00659 Truck mounted derrick crane 5 t ( excluding tyres ) Each 17,59,572
  MAT-00601 tyres and tubes 6 sets   72,300
60 MAT-00660 Upright drilling machine Each 49,560
61 MAT-00661 Ventilation fan 20 hp Each 2,56,887
62 MAT-00662 Vibratory pad foot roller 8 t Each 26,48,335
63 MAT-00663 Wagon drill Each 5,78,127
64 MAT-00664 Water tanker 8000 ltr (excluding tyres) Each 13,33,000
  MAT-00601 tyres and tubes 6 sets   72,300
65 MAT-00665 Welding set Each 44,500
66 MAT-00666 Winch 35 hp electric Each 3,52,245
67 MAT-00667 Hydraulic Truck Crane 30T Each 135,46,500
  MAT-08525 tyres and tubes 6 sets   1,61,650
68 MAT-00668 Hydraulic Truck Crane 16T Each 92,54,650
  MAT-08526 tyres and tubes 6 sets   1,55,000
69 MAT-00669 Heavy Duty Airless Spray Painting Equipment Each 4,27,950
70 MAT-00670 Concrete Placer Pump(25 Cum/hr)(Electric) Each 28,29,905

 

ACCESSORIES TO MACHINERY / EQUIPMENT FOR THE YEAR: 2020-21

Sl No. CFMS CODE DESCRIPTION OF MATERIAL UNIT S Rate for
2020-21
1 2 3 4 5
1 MAT-00671 Casing shoe bit Each 10,680
2 MAT-00672 Diamond core bit BX size Each 10,895
3 MAT-00673 Diamond core bit NX size Each 13,080
4 MAT-00674 Double tube core barrel Each 13,945
5 MAT-00675 Extension drill rod with coupling sleeve Rm 1,980
6 MAT-00676 Jack hammer drill rod 1.5 m Each 3,902
7 MAT-00677 Jack hammer drill rod 2.5 m Each 5,840
8 MAT-00678 Nozzle for Guniting / sand blasting gun Each 650
9 MAT-00679 Paving Cylinder Each 28,590
10 MAT-00680 Rails 30R ( 30 kg / m ) tonne 52,945
11 MAT-00681 Reamer shell Each 5,240
12 MAT-00682 T.C. Cross bit 50 mm dia Each 5,140
13 MAT-00683 T.C. Cross bit 75 mm dia Each 10,280
14 MAT-00684 T.C. Cross bit 100 mm dia Each 12,100
15 MAT-00685 Tyres and Tubes for truck Set 14,750
16 MAT-00686 Wire rope 16 mm dia Rm 281
17 MAT-00687 Excavation of drain with Excavator Cum 39

AGGREGATE CRUSHING & PROCESSING PLANT

Sl No. DESCRIPTION OF MATERIAL UNIT S Rate for 2020-21
1 2 3 4
1 Jaw crusher 900 x 500 mm ( 120 tph ) with 50 hp Motor Each These items are no where being used in the
Standard Data.
Hence
this may be deleted from SoR
2 Jaw crusher 500 x 300 mm ( 60 tph ) with 30 hp Motor Each
3 Jaw crusher 400 x 225 mm ( 10 tph ) with 25 hp Motor Each
4 Jaw plates 900 x 500 mm ( serreted ) Set
5 Jaw plates 500 x 300 mm ( serreted ) Set
6 Jaw plates 400 x 225 mm ( serreted ) Set
7 Nylon Conveyor belt 3 ply 600 mm width Rm
8 Nylon Conveyor belt 3 ply 1000 mm width Rm

OTHER COSTS ON MATERIAL / MACHINERY / EQUIPMENT

FOR THE YEAR : 2020-21

1. The rate provided for ' SUNDRIES' (Lump sum provision for unquantified inputs in the data rates) shall be updated on the basis of general percentage increase / decrease in the market rates or on the basis of R.B.I ' All Commodity' index.

2. The rate for structural steel fabrication shall include cost of all materials (except structural steel), machinery, labour and one coat of primer painting.

3. Demand charges and electric power charges shall be as per prevailing APEPDCL tariff.

4. Rate of interest on capital cost shall be as approved by Govt or other competent authority

Sl No. CFMS CODE DESCRIPTION OF MATERIAL UNIT S Rate for
2020-21
1 2 3 4 5
1 MAT-00688 Air hose 25 mm dia Rm 169
2 MAT-00689 Air hose 50 mm dia Rm 254
3 MAT-00690 Demand charges (HT-I : General-11 KV
category) on power supply(as per APEPDCL tariff)
KVA /
month
475
4 MAT-00691 Diesel Ltr 79.73
5 MAT-00692 Electric power (HT-VIII Category) including tax (
1.5 times of the Tariff of HT-I(A):General-11 KVA Category) (as per APEPDCL tariff)
Kwhr 9.5
6 MAT-00693 Excise duty on Gates / Hoist supplies % 0
7 MAT-00694 Insurance charges on machinery % / annum 1
8 MAT-00695 Interest on capital cost % / annum 9
9 MAT-00696 Lubricants Ltr 238
10 MAT-00697 Petrol Ltr 79.47
11 MAT-00698 Rivets Kg 89
12 MAT-00699 Road tax on transport vehicles Rs./annum As per RTA
13 MAT-00700 Shalimatic sealing compound Kg 89
14 MAT-00701 Shutter oil Ltr 48
15 MAT-00702 Structural steel fabrication Kg 29
16 MAT-00703 Sundries ( Lump sum for un quantified inputs ) LS 32
17 MAT-00704 Water hose ( pressure ) 20 mm dia Rm 169
18 MAT-00705 Steel wedges LS 16
19 MAT-00706 Elbows / Nipple / Plugs etc., LS 16
20 MAT-00707 Soldering materials LS 16
21 MAT-00708 Steam circulation arrangement LS 16
22 MAT-00709 Fuel charges ( gas for heating ) LS 18
23 MAT-00710 Vulcanizing materials LS 18
24 MAT-08527 Other accessories / controls / junctions LS 20
25   Miscellaneous fittings / switches etc LS Deleted
26   Anchors / supports for cables / lights LS Deleted
27   Civil works for foundations / pedestals / duct etc LS Deleted
28 MAT-00711 Gas cutting set ( 2 No’s 15 m hose and nozzle unit ) Each 13,180
29 MAT-00712 Grease Kg 250
30 MAT-00713 Welding holder set ( cable / holder / gloves / mask etc ) Each 7,435
31 MAT-00385 Use rate of ropes LS 160

MATERIALS FOR GATES AND HOISTS FOR THE YEAR : 2020-21

Sl No. CFMS CODE DESCRIPTION OF MATERIAL UNIT S Rate for 2020-21
1 2 3 4 5
1 MAT-00095 Worm reducers Each 1,78,900
2 MAT-00096 Electric motor 20 hp(Double Shaft) Each 1,03,690
3 MAT-00097 Electric motor 17.5 hp(Double Shaft) Each 68,500
4 MAT-00098 Electric motor 12.5 hp(Double Shaft) Each 57,800
5 MAT-00099 Electric motor 5 hp(Double Shaft) Each 26,500
6 MAT-00100 Electric motor 3 hp (Double Shaft) Each 18,500
7 MAT-00101 Electric motor 2 hp (Double Shaft) Each 10,300
8 MAT-00102 Floating shaft 300 mm dia Kg 165
9 MAT-00103 Manual operating system Each 27,100
10 MAT-00104 Gate position indicator Each 1,74,851
11 MAT-00105 Ele-magnetic brake Each 28,200
12 MAT-00106 Electric cable / switch / control panel etc LS 46,500
13 MAT-00107 Wire rope sockets Each 4,500

Materials other than covered under WR work items

for the year 2020-21

GENERAL GUIDE LINES FOR REVISING RATES OF MATERIALS:

1. Averageoftheprevailingmarketrates, ignoringfreak rates, is thecriteria for Fixing market rates formaterials.

2. The rates for materials is exclusive of GST, duties and other local levies.

3. The rates for materials are exclusive of Seigniorage charges wherever applicable.

4. The rates for materials, except those for which lead charges are admissible as per the Statement of lead charges is for all leads.

Sl. No. CFMS
CODE
Description Unit S. Rate for
2020-21
1 2 3 4 5
M-002 MAT-
00175
Quarried stone 150 - 200 mm size for Hand Broken Cum 150
M-003 MAT-
00176
Boulder with minimum size of 300 mm for Pitching Cum 165
M-004   Coarse sand for filling Cum Rate as per item no.27(b) of material
of WRD
M-005   Coarse sand for mortar Cum Rate as per item no.27(a) of material
of WRD
M-006   Fine Sand Cum Rate as per item no.28 of material
of WRD
M-007   Murrum Cum Rate as per item no.56 of Material of
WRD.
M-008 MAT-
00177
Gravel/Quarry spall Cum 130
M-009   Granular Material or hard Murrum for GSB works Cum Deleted
M-010 MAT-
00178
Granular Material or hard Murrum for GSB works Cum 95
M-011 MAT-
00179
Fly ash conforming to IS: 3812 ( Part II & I) Cum 70
    For item No.M-012 to M-055 the note shall be as follows
1.  The rates mentioned are exclusive of Seigniorage charges   but   inclusive   of   blasting   charges   of Rs.70/cum  and  25%  machine  crushing  charges. However, if the metal is obtained by hand broken, machine crushing charges shall be deducted.
2.  If  the  material  is  obtained  by  hand  broken  from surface   boulders/canal   spoil,   the   blasting   and crushing charges shall be deducted.
3.  The   material   shall   be   HB   Stone   of   Granite, Dolamite, Dolerite and Trap.(Quartzite and Basalt
with aggregate impact of less than 20)
   
M-012 MAT- 00180 Filter media/Filter Material as per Table 300-3 (MoRT&H Specification) Cum 342
M-013 MAT- 00181 Close graded Granular sub-base Material    53 mm to 9.5 mm Cum 665
M-014 MAT- 00182 Close graded Granular sub-base Material  37.5 mm to 9.5 mm Cum 685
M-015 MAT- 00183 Close graded Granular sub-base Material  26.5 mm to 9.5 mm Cum 725
M-016 MAT- 00184 Close graded Granular sub-base Material   9.5 mm to 4.75 mm Cum 600
M-017 MAT- 00185 Close graded Granular sub-base Material   9.5 mm to 2.36 mm Cum 590
M-018 MAT- 00186 Close graded Granular sub-base Material 4.75mm to 2.36 mm Cum 520
M-019 MAT- 00187 Close graded Granular sub-base Material 4.75mm to 75 micron mm. Cum 495
M-020 MAT-
00188
Close graded Granular sub-base Material   2.36 mm Cum 495
M-021 MAT- 00189 Stone crusher dust finer than 3mm with not more than
10% passing 0.075 sieve.
Cum 357
M-022 MAT- 00191 Coarse graded Granular sub-base Material 2.36 mm & below Cum 510
M-023 MAT- 00192 Coarse graded Granular sub-base Material 4.75mm to 75 micron mm Cum 480
M-024 MAT- 00193 Coarse graded Granular sub-base Material 4.75 mm to 2.36 mm Cum 480
M-025 MAT- 00194 Coarse graded Granular sub-base Material 9.5 mm to 4.75 mm Cum 585
M-026 MAT- 00195 Coarse graded Granular sub-base Material 26.5 mm to 4.75 mm Cum 640
M-027 MAT- 00196 Coarse graded Granular sub-base Material 26.5 mm to 9.5 mm Cum 641
M-028 MAT- 00197 Coarse graded Granular sub-base Material 37.5 mm to 9.5 mm Cum 710
M-029 MAT- 00198 Coarse graded Granular sub-base Material 53 mm to 26 .5mm Cum 880
M-030 MAT-
00199
Aggregates below 5.6 mm Cum 575
M-031 MAT-
00200
Aggregates 22.4 mm to 2.36 mm Cum 945
M-032 MAT-
00201
Aggregates 22.4 mm to 5.6 mm Cum 1,075
M-033 MAT-
00202
Aggregates 45 mm to 2.8 mm Cum 685
M-034   Aggregates 45 mm to 22.4 mm Cum Rate as per item
no.9 of Material rates of WRD.
M-035 MAT-
00203
Aggregates 53 mm to 2.8 mm Cum 945
M-036 MAT-
00204
Aggregates 53 mm to 22.4 mm Cum 895
M-037 MAT-
00205
Aggregates 63 mm to 2.8 mm Cum 735
M-038 MAT-
00206
Aggregates 63 mm to 45 mm Cum 680
M-039   Aggregates 90 mm to 45 mm Cum Rate as per item no.10 of Material rates of
WRD.
M-040   Aggregates 10 mm to 5 mm Cum Rate as per item no.7 of Material
rates of WRD.
M-041 MAT-
00207
Aggregates 11.2 mm to 0.09 mm Cum 735
M-042 MAT-
00208
Aggregates 13.2 mm to 0.09 mm Cum 830
M-043 MAT-
00209
Aggregates 13.2 mm to 5.6 mm Cum 960
M-044 MAT- 00210 Aggregates 13.2 mm to 10 mm Cum 1,070
M-045   Aggregates 20 mm to 10 mm Cum Rate as per item no.8 of Material rates of WRD.
M-046 MAT- 00211 Aggregates 25 mm to 10 mm Cum 1,175
M-047